Loading...
HomeMy WebLinkAbout18765_CAUSEWAY PIER & CARTER, CAROLYN_19970729Applicant Nam Address City CAMA AND DREDGE AND FILL GENERAL € 018765-C PERMIT as authorized by the State of North Carolina Department of Environment, He Ith, and Natural Resources and the-�P stal Resources Commission in an area of envirpnQ, a con ern pursuant to 15A NCAC ' T-f_� fie- 1 r �t C'�Z]L-C�ne Number ..L , - ProjecfLocation (County, State Road, Water Body, etc.) ♦. � � tom—. ' � !'�! 4 �'.'t.,' \,1..� Type of Project Activity { r PROJECT DESCRIPTION I SKETCH Pier (dock) length Groin length number Bulkhead length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other 10, L State '-4 i Zip --:: (SCALE: ' a This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any % violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- applicant's signature come null and void. I n This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. t otficgr's signature Ii�uing date ! etpirati6n date attachments In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application fee �' } Management Program. G 'v July 8, 1997 � �\\J v Causeway Pier, Inc. 108 Old Causeway Road Beaufort, NC 28516 RE: construction of new seawaR I have no objection for Carolyn Carter, owner of Causeway Pier, to construct a new seawall on her property that ad -joins to miw_ s�anauve date July 8° t997 '\_ Causewav Pier_ Inc - July 8, 1997 Causeway Pier, Inc. 108 Old Causeway Road Beaufort, NC 28516 RE: construction of new seawall I have no objection for Carolyn Carter, owner of Causeway Pier, to construct a new seawall on her property that adjoins to signature -7'ia date