Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
13755_MOROZ, EDWARD_19950202
CAMA AND DREDGE AND FILLr"? '`- 711 GENERAL PERMIT F 0 0, 6 1995 s as authorized by the State of North Carolina Department of Environment, Health, and Natural-fteg TrCr'3'aTfdtiig"C a"slgrfftsources Commission in an area of environmental concern pursuant to 15A NCAC a -/, IV • A t. U Applicant Name C- 0I Ai ART", %lloRr,.z Phone Number Address a I jf',6 SR^??,4g d Dfilya City (,k1,lt,.r;r-o.t State AID Zip -3" tC1.f Project Location (County, State Road, Water Body, etc.) �� ' R, C r., U `J �.i t' Y ry t f -J 6- :51UA0Iy I ' 1 0-- ' Type of Project Activity 157�iN.Qrz •.a C, r�a.,� iyA : a�9 1{= !.-(,o 6 r f f /`LA.7 FceA4 A7 rtl p PfI-A 5r/ALi A)F_ GLffas,Rrr�i; PROJECT DESCRIPTION s , • ■■ ■ ■■MENOMINEE■■ .. .1 .1,11 WALIMWA/ I ■ MO■■■■■■■M Groin length -V■Er■■■■■■■■ ■ ■ ..■=■■MMzZ0■M number ■■ _ ■■■■■■ril■Now M■M■MME■■M Bulkhead len th ■INM■■■M MME® ■■■■EMM■M distance offshore�,fEMll'� EMBasin M !1!!��!■■■M■■■M W�iil'�■■■■■■■■ channel dimensions ■■■MMUM■Mi�ri�ii�iiiiiM■M I�/IL►011M©lAcubic EMMM■EMM yards ON Boat ramp dimensions ■RU■MM■■■ Other mom I I■■■■■■■ ■� This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. -. -9 issuing date attachments %I`t� ' /10 applicant's signature permit officer's signature In issuing this permit the State of North Carolina certifies that CC this project is consistent with the North Carolina Coastal application fee 1' C.�r�F 1�` 1/ 3 c - Management Program. ,� J expiration date