Loading...
HomeMy WebLinkAboutGeneral Permits (2351). �'. I�iA- •.d�o� Y. '.. �5 ! Y,}Bp�A�ri��'�iX-LTs �jr�..." ` J r.�- / p.__.. _ 4 ' re C CERTIFICATION ' 'M.4.31 oN a, i FROM REQUIRING A LAMA as authorized by the State of North Carolina, Department of Environment, Health, and Natu in an area of environmental concern pursuant Applicant Name P I,r t Address r Cityr- Project Location (County, State Roa , Water Body, etc.) Type and/ Dimensions of Project U04 s f r v c-t- ���Y/`n t .f✓ k;f". J � :fin Aro,g The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. sent of a CAMA otticial under the mistaKen assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. WIN Q 9 1995 n " ources Commission C Subchapter 71� jQ Phone Number State T Zip w�L % �o.Ib SUS o o A. 14-"Id, S 4 N I i6 Y, i Ct- This certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. Appncanrs signature CAMA Official's signature _ Issuing date Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203