HomeMy WebLinkAbout13445_COX, MARVIN_19941129O
CAMA AND DREDGE AND FILL 4`
GENERAL {
DEC 0 1994
13445
PERMIT
as authorized by the State of North Carolina
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15A NCAC _ %ry''
A It N h'k A s v , .� Pin- Ni -h., `i 1 "% - .l A -` ll 'r
pp i an ame
Address
City
Project Location (County, State Road, Water Body, etc.)
. stir.
Type of Project Activity p " i Y -I"
State zip �-
PROJECT DESCRIPTION
SKETCH
violation of these terms may subject the permittee to a fine,
''�
Pier (dock) length
j)
come null and void.
Groin length
This permit must be on the project site and accessible to the
_
permit officer when the project is inspected for compliance.
number
ro
The applicant certifies by signing this permit that 1) this pro-
Bulkhead length, L
ject is consistent with the local land use plan and all local
ject
issuing date expiration date
-14 i i—
i
max. distanceoffshore'
" ff /� �j
'
objections to the proposed work.
I
y-
Basin, channel dimensions�dlo
0-6
MiTiv
application fee
cubic yards
If -2 r� ,
Boat ramp dimensions
Other
0
I his permit is subject to compliance with tnis application, site
(SCALE: iNo titi ) I
t • � n .. rte. i �1
Ers'�j~I'
r
drawing and attached general and specific conditions. Any
�-
violation of these terms may subject the permittee to a fine,
''�
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer's signature
permit officer when the project is inspected for compliance.
ro
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ject
issuing date expiration date
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
" ff /� �j
'
objections to the proposed work.
attachments r
In issuing this permit the State of North Carolina certifies that
0-6
this project is consistent with the North Carolina Coastal
application fee
Management Program.