Loading...
HomeMy WebLinkAboutGeneral Permits (2278)CERTIFICATION O R"' UN _Y FROM REQUIRING A CAMA PEMI-AUG0 v 1995 9 3 as authorized by the State of North Carolina, Department of Environment, Health, and Natural Reil �dzj ces Commission in an area of environmental concern pursuant to 15 NCAC,SjjbpbApJer{7.K �Q2 -• Applicant Name Address City Al Project Location c4 _ . Type and. Dimensions of The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration, quirement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necessary CAMA permit requirements does not alleviate the necessity of to continue this certification. your obtaining any other State, Federal, or Local authorization. ►-el I SKETCH (SCALE: AV '7, `%. / ) I Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. _<�4f Pe 4-- Applicant's nature CAMA Official's signature Issuing date Expiration date Attachment: 15 North Carolina Administrative Code,7K .0203 CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT C a -', -P, / as authorized by the State of North Carolina, J/ Department of Environment, Health, and Natural Resources and the It. Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapt203- -o e? k Applicant N. �'� / O 'Pr Phone Number 7/ % -2) k /� i %, City State /I, C Zip -2 S91 4 Project Locatio (County, State Road, Water Body, etc.) c a -aY C O-70 The proposed project to be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .0203. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal, or Local authorization. This certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, a re-examination of the project and project site may be necessary to continue this certification. I SKETCH (SCALE: ) I Any person who proceeds with a development without the con- sent of a CAMA official under the mistaken assumption that the development is exempted, will be in violation of the CAMA if there is a subsequent determination that a permit was required for the development. The applicant certifies by signing this exemption that (1) the ap- plicant has read and will abide by the conditions of this exemp- tion, and (2) a written statement has been obtained from adjacent landowners certifying that they have no objections to the proposed work. Applicant's signature CAMA Official's signature Issuing date -�-9-1� Expiration date Attachment: 15 North Carolina Administrative Code 7K .0203 December 8,1994 Mr. Bill Church 106 River Drive Beaufort, NC 28516 This is to advise you that we have no objections to your proposed improvements to your lot at 104 River Drive. This includes a boat ramp, dock, bulkheading and temporary storage buildings. M. W. Harshberger Bernice B Harshberger