Loading...
HomeMy WebLinkAbout59636_WINEBERG, JEAN_20120316h ❑CAMA / ❑ DREDGE & FILLS GENERAL PERMIT Previous permit# ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. Applicant Name_ Project Location: County Address _ City-- -- --- - Phone # ( ) Authorized Agent Affected ❑ CW AEC(s): ❑ OEA ❑ PWS: ORW: yes / no State ZIP Fax # EW PTA ❑ ES ❑ PTS ❑HHF _ IH UBA El N/A 1 FC: PNA yes / no Crit.Hab. yes / no Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone # O River Basin L� Adj. Wtr. Body (nat /man /unkn) Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length Platform(s) Finger pier(s) (Scale: Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other y _ ! i Shoreline Length SAV: not sure yes no y t Sandbags: not sure yes no �" r Moratorium: n/a yes no Photos: yes no t t , Waiver Attached: yes M1 no 1" A building permit may be required by: ` t ® See note on back regarding River Basin rules. Notes/ Special Conditions Agent or Applicant Printed Name Permit Officer's Signature Signature ** Please read compliance statement on back of permit ** Application Fee(s) Check # Issuing Date Expiration Date Local PlanningJurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 UNITED STATES POSTAL SERVICE First -Class Mail Postage & Fees Paid USPS Permit No. G-10 • Sender: Please print your name, address, and ZIP+4 in this box • __5 .4�erco-tt NAvi ne Cow-+s-i4 n t'a.1, MC 2 II111111l111)I)I�IIIIIIIIIIIIIIiIIj11IIliIjIfI)IIIiI)IIIiIIIII THIS SE CTION ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. Article Addressed to: w a1Ker 3tnat� 1AC57 �Iwy �4i11sborov�h, �JC�-7al VERY A. X /G1 J� ❑ Agent ❑ Addressee ' B. Receives) by (Pri ted Name) C. Date of Delivery D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3.111Swwwervice Type Certified Mail 13 Express Mail Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number 7011 0470 0000 7751 0693 (Transfer from service label) PS Form 3811, February 2004 Domestic Return Receipt /� ),n d���+ 102595-02-M-1540 CERTIFIED MAIL - RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONAMAIVER FORM Name of Property Owner: 1 " 1 r5 . J E kN I N 13SP-q Address of Property:, G` 2 G. P-ni Shop-E5 LN' J Amp`^- JRCLm (Lot 1orr Street #, Street or Road, City & County) Applicant phone #: 252 - 2"tl `! " 15 ['a Mailing Address: SGI.YVIe. I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A description or drawing with dimensions must be provided with this letter. I I have no objections to this proposal. I have objections to this proposal. If you have objections to what is being proposed, you must notify the Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Contact information for DCM offices is available at www.nccoastalmangement net/conhwt dcm.htm or by calling 1-888-tRCOAST. No response is considered the same as no objection if you have been notrbed by Certified Mail. WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, or lift must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (if you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Pro rty Owner Inforrtlation) Signature J can (N V) berg Print or Type Name `J tUa E.WA5hc L-h - Mailing Address Praoa,h 4 ALC_ 2?051D CitylStat/Z ip r_254 " 0r� j ^I q-�S� Telephone Number 3.7.1a Date (Riparian Property Owner Information) 1. ignature l / �.tr Print or Type Name 7-il. j L, )\\4 L :�L 7 Mailing Address tty/StatelZip Telephone Number _3.1Z l? Date CERTIFIED MAIL - RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONMAIVER FORM Name of Property Owner: 1 ", YS • JEAN i N B EP—q Address of Property: 2' E. 5i}0P-E I.t� - J �((aRQ.hP-'P(LIM iCQ (Lot or Street #, Street or Road, City & County) Applicant phone#: 2.52" 2H`! " 151 Mailing Address: S0.YYl� I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me as shown on the attached drawing the development they are proposing. A description or drawing with dimensions must be provided with this letter. I have no objections to this proposal. I have objections to this proposal. If you have objections to what is being proposed, you must notrfy the Division of Coastal Management (DCM) in writing within 10 days of receipt of this notice. Contact information for DCM offices is available at www.nccoastalmangementnettcontact dcm.htm or by calling 1-888-4RCOAST. No response is considered the same as no objection if Lou have been notified by Certified Mail. WAIVER SECTION I understand that a pier, dock, mooring pilings, breakwater, boathouse, or lift must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) y I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) Signature J can 1N in bem Print or Type Name Mailing Address A ra na. h , NC a350 City/State ip 02!5(Q - 01qq-/51B Telephone Number 3.7-Ia Date (Rip frian Property Owner Information) Signat e i�"�fe- & �,�i vs'oAI Print or ype Name ?G o iyeas -,"J. Mailing Address it) State2ip 11,E Telephone Number Date Authorized Agent Consent Agreement `, r [onS+✓ C+CbP% W I S� EAN i tJ BE ?-(i hereby authorize 'I5, qre& j oe to act on (Property Owner) (Authorized Agent) my behalf in obtaining CAMA permits for the location listed below. This agency authorization is limited to the specific activities described above. Property Address: z. 2- 2- C . 3I c)I-n Aya h e NC, 2115,51D Property Owner's Mailing Address and Phone Number: Sa.m e, Property Owners Signature: Jan n R` W 1 6 bp(c, Authorized Agent Signature: �1� iQ) J Date: Form: Authorized Agent Agreement as developed by NCDCM revised 7/29/09 Contractor Agreement THIS AGREEMENT made the day of , 20 , by and between B. Prescott Marine Construction, LLC and Mrs. Jean Winberg. Scope of Work The Contractor shall furnish all materials and perform all of the work to install a vinyl bulkhead at 222 E. North Shore Ln., Arapahoe, NC. The project will consist of the following components: ■ 10' Vinyl 3.5 Series Panels (12' Panels if necessary) ■ 6"x6" Whaler ■ Galvanized Tie Back Rods ■ Driven Deadman Anchor System Contract Price The Owners shall pay the contractor for material and labor to be performed between $56,275 and $59,475 depending on length of vinyl panels (please see quotes for specifics). Timeline We estimate the construction to take 10-14 days to complete. Progress Payments Payments of Contract Price shall be made as follows: • Due when construction begins: $10,000.00. • Due at'/2 way point: $20,000.00. • Due at completion of Project: $26,275 - $29,475. Signed this i a day of NI CFC Lh , 20 1.� Contractor Property Owner 11Pag `tUU Vln l C)I 1clVIUACt n�VSe diver