Loading...
HomeMy WebLinkAbout59655_TURNER, CARL_20120210❑ CAMA / ❑ DREDGE & FILL 'GENERAL PERMIT Previous permit# ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Rules attached. Applicant Name _ S 1j Project Location: County Address Street Address/ State Road/ Lot #(s) State ZIP Phone # () Fax # (7" Subdivision Authorized Agent City ZIP Affected ❑ Cw ❑ EW ❑ PTA ❑ ES ❑ PTS Phone # ( ) River Basin AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body (nat /man /unkn) ❑ PWS: ❑ FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body Type of Project/ Activity (Scale: Pier (� Platf Fingir pier(s) Groin length umber Bulkhead/ �19 distance offshore .-nax distance offshore Basin channel ubic yards_ Boat Boat M _ Agent or Applicant Printed Name Signature ** Please read compliance statement on back of permit ** PermitOfficer's Signature !` Issuing Date Expiration Date ApplicationFee(s) Check# Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. (Serves: Carteret, Craven, Onslow -above Raleigh, NC 27604 New River Inlet- and Pamlico Counties) 919-733-2293 Fax:919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 CARL A TURNER D/B/A TURNER FARM 605 TAYLOR FARM RD. HAVELOCK, 28532//��+ N PAY TO THE `NC ' G , I ORDER OF /li/ `/ ' n� 66-85/531 1015 DATE tQ 1 $ "Roo cv k�- DOLLARS 8 II� Iw RBC Bank® RBC Bank (US/V a MEMO +' l \� ._� _ —__— NP 1:05 3 L008 50":0 3900 30 30011' L0 L 5 :r NCDENR North Carolina Department of Environment and Natural Rasources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Secretary BUFFER AUTHORIZA.PON CERT:FICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shalt subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. s. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. • Pre -project site conditions: C'tt Ved 6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate. -T—U-V l e'-i Agent or plican P inted Name A nt or ppll Signature �9,/ 6727� Permit Office 's Signature Issu Date LAMA GENERAL PERMIT #: Washington Office 943 Washington Square Mall Washington, NC 27889 Phone 252-946-6481 Morehead City Office 400 Commerce Avenue Morehead City, NC 28557 Phone 252-808-2808 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper One NorthCarolina Natfral& Version 5, 09/2009 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to 5 L' ^' C: {sue L J .qi\4 's (Name of Property Owner) property located at G (& r ) Z v, (Lot, Block, Road, etc.) on ��ub'{'u�,l C'�ee� ,in 1c-r4 C/.�e9�'��� ,N.C. (Waterbody) (Town a/or County) Applicant's phone #:.�ZS.� �/� 5 Mailing Address: 141rvo- LL of C 2- y5' ; �- He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by property owner proposing development) 1 t S�u c ' c�-f-rr r '},c- [ k"v k ST- i J �r�, .�� /{jc3'.t�l !u� r�� -for 5 e4-- lzZ;2G (,y ' iJ 5 l va f \k (Information for Property Owner Applying for Permit) 6 0S Mailing Address (Riparian Property Owner Information) Signature 14- Lde, L N-1 Itol5 Z (,/U_(.(C6CL- l • [�1_!°6,S City/State/Zip Print or Type Name Telephone Number ( GLA-' A 11/ "7 l i t Signature Date a 4- 2 / Telephone Number Date l Huntley, George W III From: lavonne fisher [lavonne.fisherl23@gmail.com] Sent: Wednesday, November 09, 2011 4:36 PM To: Huntley, George W III Subject: Clubfoot Creek ADJAC,E 1' T ARIA" PROPERTY OWNER STATEMENT 111crcLy aft that l own "crty =t trs ,g Z L / } _�me of Property Ow ntr) t'dopeny lax vtcd at d i LUYyyS,i�Bf'locJ„Road, ct- psd,-ct-N.is r f ¢ y h on n (Waterbody) ffaw-n anivor County) Appla =wrs phone : Sit b �' ; ` € ` Mailing Address: e�' t lie has dcscribcd to me, as shown below%, the &-10[urterit he is proPosing 3t that lo='on- aid, 1 have no ob*lions to his pr saL s,j�-,iL—R ° J0NT ANLVOlE DRa'*`NNLNG OFPRO POSED DEVELOPINMN'I: (To hefflird in by property ownrr proposing &1v�-f0PRw-,'Lt) r (Tafortuation for Property Or%v r Applying, for Permit) i4ailing.A€dress � colstmaip Telephone Ntm*er ; t Date (Ri Property Owner info atioe) Print or Type N&uc TckphA= lumber Dwe