HomeMy WebLinkAbout59309_THOMAS, CHARLES_20111108E��
CAMA / ❑ DREDGE & FILL
GENERAL PERMIT Previous permit#
❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
171 Rules attached.
Applicant Name_ f Project Location: County
Address Street Address/ State Road/ Lot #(s)
State ZIP
Phone # () Fax # (,) "'�"" Subdivision
Authorized Agent City ZIP
Affected ❑ Cw ❑ EW ❑ PTA ❑ ES ❑ PTS Phone # ( ) River Basin
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body (nat /man /unkn)
❑ PWS: ❑ FC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body
raON
avg distance offshore
max distance offshore
cubic yards
:..house/ Boatfift
00
MHwdMMMMMEMMMMM
W%1M
M1
1MMMMMMrqNMM
M
E111
MINEWErNIM
MEM
.
Agent or Applicant Printed Name
Permit Officer's Signature �
Signature ** Please read compliance statement on back of permit
Issuing Date Expiration Date
Application Fee(s) Check # Local Plan ningJurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that [)prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888ARCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
CHARLES J THOMAS
JUDITH A THOMAS
111 BOROS LNDG
NEW BERN, NC 28560-9469 h
PAY TO e
S THE ORD) R-OF"
66-7489//2y-5531
/�yP, 174
DATE v, r y C)
DOLLARS I I,
arine
federal Credit Union
• > J•dmormb. NC *%1-1551
MEMO
t -
1: 2 5 3 1 j: 10 20000 5 3 8 0 B 7iin00 1 744
N*A
�;w
NCDEHR
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACT ITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259.
The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received duffer
Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per
violation.
1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.
The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
a. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the conditions listed above and
verify that all information provided is complete and accurate.
C
Agent or plican A4iint d Name Permit Offi er's Signature
Agent orb, rca Signature Issue to
LAMA GENERAL PERMIT #: �/ ✓(1 / C
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue
Washington, NC 27889 Morehead City, NC 28557
Phone 252-946-6481 Phone 252-808-2808
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Version 5, 0912009
DIVISION OF COASTAL 1< -A?,iAGE ENT
AD JAC'EiNT RJPARI.A� PROPERTY OWNi ER t' QT1FICATit7Wt'lAJVER FOFIIilai
17,
Name of Individuai applying for Ferr-nit: �h R n <5 it- T� e ran A
�/' IJ'W
(Lot or Street #, Street or Road, City & County) _
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing the development
they are proposing. A description or drawing, with dimensions, should be provided with this letter.
I have no objections to this proposal.
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Avenue, Morehead City, NC, 28557 orcall (252) 808-2808 within
90 days of receipt of this notice. No response is considered the same as no objection if you
have been notified by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, boatlift or sandbags must
be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If
you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Applicant Information) (Riparian Property trier Information)
114
Mailing Address Signature J
CitylStatelZip Print or Type Name
. S r I— -5 y `7- 5,_" 5
Telephone Number
Date
C,,c'3 -7Zi'� 6.32�
Telephone Number
Date
DIVISION OF COASTAL WiNAGEVENT
AO-JACEN T RIPARJAN PROPERTY ()WNFR �iOT1FiCAT 0- KI'iAPaFOR�I-
Name of individual applying for ,cle nit: Ile (,
-^.,-lrlra��,�F��r,r`arf•,i• /�( ���(�S �i�Nd��tJ� /�/'�W ��i4V�.
(Lot or Street #, Street or }load, City & County)
hereby certify. that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing the development
they are proposing. A description or drawing, with dimensions, should be provided with this letter.
e no objections to this proposal.
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Avenue, Morehead City, NC, 28557 or call (252) 808-2808 within
90 days of receipt of this notice. No response is considered the same as no objection if you
have been notified by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, boatlift or sandbags must
be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If
you wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Applicant Information)
/ / / /-"�d rd 5 2,1 �✓�i /l1 c 1
Mailing Address
C -'J'gP' 't'j C 2Fye,C)
City/State/Zio
30/-�;99—'S5'/-5—
Telephone Number
Date
(Riparian Prggerly Owner information)
Sig ture // O
Print or Type Name
.�'?'S�- //��-/5�9
Telephone Number
Date