Loading...
HomeMy WebLinkAbout60326_HOLLAND, TRENT_20120614-' `- V Pt'No. 60326 J CAMA / DREDGE & FILL GENERAL PERMIT Previous permit # ENew ❑ _Modification iComplete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. Applicant Name Project Location: County Address Street Address/ State Road/ Lot #(s) CityState ZIP Phone # (}_ _ _ _ Fax # () Subdivision Authorized Agent CityZIP Affected CW C EW ❑ PTA ❑ ES I - PTS Phone # ( _) River Basin AEC(s): El OEA �_1 HHF ❑ IH UBA 7 N/A Adj. Wtr. Body (nat /man /unkn) ❑ PWS: I_FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body Type of Project/ Activity (Scale: ) Pier (dock) length Platform(s) — Finger pier(s) I - -- Groin length I �- number — -- Bulkhead/ Rra length i'ti avg distance offshore r i max distance offshore----- � I I Basin, channel ,• cubic yards Boat ramp --- Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length J SAV: not sure yes no . -- Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no -- A building permit may be required by: See note on back regarding River Basin rules. Notes/ Special Conditions Agent or Applicant Printed Name Permit Officer's Signature Signature Please read compliance statement on back of permit Issuing Date Expiration Date Application Fee(s) Check # Local Planningf urisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: El Tar- Pamlico River Basin Buffer Rules ] Other: F-1 Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. (Serves: Carteret, Craven, Onslow -above Raleigh, NC 27604 New River Inlet- and Pamlico Counties) 919-733-2293 Fax: 919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Mm 't'l M i�wqw" W Mfw M� 2 DWIGHT L. BEST NCOL 3391795 JAMES L BEST .PH 252-249-2245 11 BEST LANE ARAPAHOE,NC 28510 Luj6 d- First Citizens -"-,.Bank- R:o 5 3 100 3001:00 Is 7 1 ? S S 3 1 Soul MV 818 66-3W531 Date 471 Dollars NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allow d. • Pre -project site conditions: kA 6. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that infor"tipn is complete and accurate. i ge o rint Permit ffic 's Signature , (0 4�4 7or p ca ig a e Iss e ulte AMAGENER PERMIT#: Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue OneWashington, NC 27889 Morehead City, NC 28557 NorthCar olina Phone 252-946-6481 Phone 252-808-2808 ��������� An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Version 5, 09/2009 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to / le f— q/% W 's (Name of Property Owner) property located at (Lot, Block, Road, etc.) on l 0 N.C. (Water body) (Town and/or County) She/he has described to me as shown below, the development he/she is proposing at the location and, I have no objections to his/her proposal. RECEIVED JUN 11 2012 DCM-MM Ca'a y DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (To be filled in by individual proposing development) The proposed development consists of a wooden structure to be constructed some Signature 15 or more feet to the landward side of the existing bulkhead. The purpose of this structure is to stabilize the shoreline and allow mitigation of erosion caused by Hurricane Irene and to reduce the likelihood of the the erosion reoccurring under similar storm conditions in the future. L. orcl { Print or Type Name Telephone Number Date 91 064 RECEIVED CW ACM-MRD CITY ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to7 J s (Name ofPI-operty Own,-4 property located at (Lot, Block, Road, etc.) on C, ��° rL/ �P in �/ �7d F G CCU � // � N.C. (Water body) (Town and/or County) She/he has described to me as shown below, the development he/she is proposing at the location and, I have no objections to his/her proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVEI OPMENT12 (To be filled in by individual proposing development) The proposed development consists of a wooden structure to be constructed some 15 or more feet to the landward side of the existing bulkhead. The purpose of this structure is to stabilize the shoreline and allow mitigation of erosion caused by Hurricane Irene and to reduce the likelihood of the the erosion reoccurring under similar storm conditions in the future. DCM-MHD CITY SigYfature X/ Print or Type Name Telephone Number Date Z- Z- Connell, Brad From: katarinaholland [katarinaholland@att.net) Sent: Friday, June 15, 2012 10:16 AM To: Connell, Brad Subject: Permits for bank erosion control Mr. Connell, Please accept this email as permission for Cliff Braly of 52 Best Lane Arapahoe, NC 28510 to act as an agent on my behalf for the permits required to stabilized the bank on my property and Jack Taylor's property in Arapahoe, NC. Thank you for your attention of this matter and please call me at 704 651 5450 (cell) or 704 541 1942 (home) if you have any questions. Trent Holland 14 Best Lane Arapahoe, NC 28510 i tiv NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary Date (� Applicant Name Mailing Address I `-4 {\) -e S -� L ti A'Oj9-PPHOx;7. Pd- j�16 I certify that I have authorized (agent) G 1C 14� q t-�f-�!— to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) /4-10,P/'07 at (location) I Z'f At-, S-� L n This sign RECEIVED ,IUN 18 Z012 DCM-MLID CITY 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper