HomeMy WebLinkAbout59367_HAROLDSON, JOHN_20111026Z
�► i r
❑ CAMA / ❑ DREDGE & FILL
GENERAL PERMIT
❑New ❑Modification ❑Complete Reissue El Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
1
Previous permit #
Date previous permit issued
Applicant Name_ Project Location: County
Address -
City-- ---- -
Phone #
Authorized Agent
Affected ❑ cW
AEC(s): ❑ OEA
❑ PWs:
ORW: yes / no
State.----- ZIP
Fax #--
❑ EW ❑ PTA ❑ ES ❑ PTS
❑ HHF ❑ IH ❑ UBA ❑ N/A
❑ FC:
PNA yes / no Crit.Hab. yes / no
Street Address/ State Road/ Lot #(s)
❑ Rules attached.
Subdivision
City ZIP
Phone # O River Basin
Adj. Wtr. Body (nat /man /unkn)
Closest Maj. Wtr. Body
Type of Project/ Activity
(Scale:
Pier (dock) length
f
Platforms)
Finger pier(s) Y 44H I I I i I I I ill
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramp,
Boathouse/ Boatlift
T
Beach Bulldozing
Other
j
I
r `
_-
i
I
'
i
I
Shoreline Length__-
SAV: not sure yes no
Sandbags: not sure yes no
Moratorium: n/a yes no
Photos: yes no ---
Waiver Attached: yes no
A building permit may be required by: 0 See note on back regarding River Basin rules.
Notes/ Special Conditions
Agent or Applicant Printed Name
Permit Officer's Signature
Signature ** Please read compliance statement on back of permit ** Issuing Date
Expiration Date
Application Fee(s)
Check # Local PlanningJurisdiction
Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ I-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FAC,i.ITIES ACCESS i+vAV-
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico &
Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259.
The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies
with the aforementioned regulations, and made a "no practical alternatives" determination per those
regulations.
Those activities covered by your Coastal Area Management Act (LAMA) permit have received Buffer
,Authorization as long as the project is constructed in a manner that continues to meet all of the conditions
listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party
(contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per
violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM.
The alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of
pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules
to the maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way.
This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the conditions listed above and
verify that all information provided is complete and accurate.
Agent o pplica rintecl Name
A nt ?�r-4—pli50 Signature
LAMA GENERAL PERMIT #: �7 36 7 C
Washington office
943 Washington Square Mall
Washington, NC 27889
Phone 252-946-6481
Morehead City Office
400 Commerce Avenue
Morehead City, NC 28557
Phone 252-808-2808
�Ca?IyEn
Permit Officer's Signature
JAN 2 U 2012
DCM-MHD CITY IsS a Da
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Version 5, 09/2009
1� .k v
[HOGS A '
I -�
World Leader in Swine Production Solutions
O
Slats -_
The Hog Slat reputation
depends on providing
the world's best slats.
The right size
to fit your needs:
Size Slat Style
4' x 5'
1 "
4'x6'
1 "and 1112"
4' x 8'
1" and 1 112"
4' x 10'
V
4' x 10'
1 " half open & half solid
Machine finished slats are easier on a pig's feet.
Our competitors' hand finished slat has a smooth edge that may look good at
a first glance. But, if you look closely you'll see that manufacturing process causes
a slight hump to develop in the middle of each slat - that's hard on feet!
Our slats are machine finished with a very flat surface and a consistent opening.
Theirs. (cross-section)
OurS. (cross-section)
VVVVVVz ff 11 11,11111 111
Less water equals stronger concrete.
Some manufacturers add water to make the concrete more workable. This weakens
the concrete by changing the cement to water ratio and shortens the life slat.
OURS
THEIRS
VS.
Competitor
4" Slump
We use a slat machine and are able to work and
form a 0" slump concrete mix versus the normal
4" slump needed for wet cast, hand poured slats.
Our dry cast process enables us to produce
stronger, more consistent slats at a much quicker
pace than our competition. This results in a better
performing and less expensive slat for you!
20'
V
0
v
4' X 5' H06 SLAT
II'
ED&E OF ROOF
II'
LADDER
DOCK LAYOUT
30'
/\
N
ENNS LLCSCB PER PLAN
�,Y ,oiz,izo„
Construction & Property Management A"' HNi01D50N °DCK PLAN 1
40'
TO sIiORE t
b' WOOD PILE
21'
TYPICAL
4' X 10' H06 SLAT
TYPICAL U.NA.
6 X b BAND BEAM
90'
TYPICAL
8' m WOOD PILE
BOAT LIFT
TYPICAL
VERIFY PILE SIZE
WITH MANUF. SPECS.
p0ygt A!D s
4'-
—❑O—
I
I
I
400 SOFT
I
I
\ BOAT T�.q•
\ CANOPY CLEAR
/
/
F
GLEANINGISO❑
BENCH
\\
10'//
I
I
4'-
,,50UTH ELEVATION
A.JENN5 LLC
Construction & Property Management
,,PECK FRAMING PLAN Q
41 JENNS L Lc.
Construction & Property Management