HomeMy WebLinkAbout60274_GRYB, ROBERT JR_20120821f
r NO. 60274
CAMA / ❑ DREDGE & FILL
GENERAL PERMIT
Previous permit#
-New ❑Modification [-Complete Reissue
hPartial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental
concern pursuant to I SA NCAC
Rules attached.
Applicant Name-
Project Location: County
Address
Street Address/ State Road/ Lot #(s)
City - State ZIP
- - --- -
Phone # () <: Fax # (_ )"
Subdivision
Authorized Agent
_
City------ _ ZIP
Affected ❑ CW C' EW i PTA E ES ❑ PTS
Phone # ( ) _ _ River Basin
AEC s : ElOEA HHF ❑ IH ElUSA ❑ N/A
-'FC:
Ad-. Wtr. Body- _ __. nat /man /unkn
i y ---- J
O PWS:
ORW: yes / no PNA yes / no Crit.Hab.
yes / no Closest Maj. Wtr. Body
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length - --
number f t --
i
Bulkhead/ Riprap length-
avg distance offshore
max distance offshore
Basin, channel
cubic yards_
Boat ramp _
Boathouse/ Boatlift-
Beach Bulldozing_
Other
Shoreline Length
SAV; not sure yes o
Sandbags: not sure yes (no
o
Moratorium: n/a yes
Photos: yes t no _
Waiver Attached: yes ?no - ---- -- -.-- -
A building permit may be required by:
Notes/ Special Conditions
Agent or Applicant Printed Name
-I -
(Scale: 1
f
See note on back regarding River Basin rules.
Permit Officer's Signature
Signature ** Please read compliance statement on back of permit Issuing Date Expiration Date
Application Fee(s) Check # Local Planning Jurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
1 Tar - Pamlico River Basin Buffer Rules Other:
r-
_I Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ I-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
�� ..®
NCDENA
Norte C,, arolina DepartMent of Environment and Natural Resources
Divisl,.,n of Coastal 1\AanaCernent
Beverly Eaves Perdue Braxton C. Davis Clee Freeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A. riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal and has determined that the project as proposed complies with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction &/or
land clearing to a civil penalty by DWQ of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
s. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 �ough ((March 0) after completion of the bulkhead.
• Pre -project site conditions: (�(L% N UL i15 /O__F
7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
ZAgen or Ap lic nt ted Name Permit Officer's Signature
or plicant Sig ure // % Issue Date
CAMA GENERAL PERMIT #:
Washington Office
Morehead City Office
Wilmington Office
943 Washington Square Mall
400 Commerce Avenue
127 Cardinal Drive Ext.
One
Washington, NC 27889
Morehead City, NC 28557
Wilmington, NC 28405-3845
NorthCarolina
Phone 252-946-6481
Phone 252-808-2808
910-796-7215
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
�atura!!t�
N.C. DIVISION OF COASTAL MANAGEMENT
AGENT AUTHORIZATION FORM
Date
Name of Property Owner Applying for Permit:
Mailing Address:
I certify that I have authorized (agent) ���UQS.� o to act on my
behalf, for the purpose of applying for and obtaining fall CA'MIA /Permits necessary to
install or construct (activity) jgz-A-
at (my property located at) E'er cF 0 £ P—R-i
This certification is valid thru (date)
Property Owner Signature
Date
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to L I
(Name of Pr erty Owner)
property located at
�/ (Address, Lot, lock, Road, etc.)
on /Y dJa 2,1)
� , in iYn 4'6'0 (01 N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site dra
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information) (Adjacent Property Owner Information)
S* n tore Si nature
0-
Print or Type Name Print or Type Name
.0Io W11-soto Pp(/1)1 ✓ 31O hY&AjusorJ /2Z
^M--�a'�iling Address Mailing Address /V
City/St b U � City/State/Zi� G /
rs 3 �
Telephone Number Telephone Number
Date Date
(Revised 611812012)
0
Pp. TR PRESCOTT MARINE CONSTRUCTION LLC o4-os 1147
hl
w 545 ALLIGATOR LOOP RD 252-745-7135 66-30/531
MERRITT, NC 28556 471
Date
Pa\, to the
Order
Dollars
First Cloze- s7
Is,
0-
3 �00 3001:00 to 7 1 201946 L110 0 L I't. 7
3