Loading...
HomeMy WebLinkAbout61025_FORET, CHARLES_20120925t CAMA / D DREDGE & FILL T- NO. 61025 GENERAL PERMIT Previous permit # ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. Applicant Name Address City State ZIP Phone # ( ) --�_ -- Fax # Authorized Agent Affected L CW L] EW CI PTA ❑ ES ❑ PTS AEC(s): ❑ OEA 1, HHF Cl IH ❑ UBA ❑ N/A ❑ PWS: FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Project Location: County Street Address/ State Road/ Lot #(s) Subdivision - City _- ZIP_ Phone # (_--_) River Basin Adj. Wtr. Body_ - (nat /man /unkn) Closest Maj. Wtr. Body Type of Project/ Activity (Scale: Pier (dock) length,]—- �J�' Platform(s) rrt� Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore f `! Basin, channel cubic yards Boat ramp Boathouse/ Boatlift__ Beach Bulldozing Other � ►: %%c� F i •-- -- - — I — �t i I I ? a. 9 r I _�_ _ { Shoreline S hne $AV: not sure yes no Sandbags: not sure yes no_II—— Moratorium: n/a yes no Photos: yes no Waiver Attached: yes not A building permit may be required by: Notes/ Special Conditions - --- �h _- - tip -- -- --- J I I i ` See note on back regarding River Basin rules. Agent or Applicant Printed Name Signature "Please read compliance statement on back of permit" Permit Officer's Signature Issuing Date Expiration Date Application Fee(s) Check # Local Planningjurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: u Tar - Pamlico River Basin Buffer Rules ❑ Other: i Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax: 919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888ARCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) MARINE SOLUTIONS LLC 235 CARTER LANE TRENTON, NC 28585 PH 252-229-7147 PAY TO THE ORDER OF nni n oc 1243 66-112/531 i oma,u a� e.�w. 1 BRANCH BANKING AND TRUST COMPANY 1-800-BANK BST BBT.coomm FOR u"0000I,2430 1:053101L211:013052956214LOn' I...® CDGrr_NR North Carolina Department of Environment and Natural Resources Division of Coastal Management Severly Eaves Perdue Braxton C. Davis Dee Freeman Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner & the party (contractor) performing the construction &/or land clearing to a civil penalty by DWQ of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Temporary Stabilization: Immediately post- construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through M h 30) after completion of the bulkhead. • Pre -project site conditions: UJ12 k�,,eo I i � ' / Ch [ V17 !± 1 e.sl LE 7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate, 14 V0 ley ge or Applicant Printed Name Permi Officer's Signature jL6e or fi* ca _ gnat a Issue Date CAMA GENERAL PERMIT #: Washington Office Morehead City Office Wilmington Office 943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext. One Washington, NC 27889 Morehead City, NC 28557 Wilmington, NC 28405-3845 NorthCarolina Phone 252-946-6481 Phone 252-808-2808 910-796-7215 �aturallJ An Equal Opportunity/Affirmative Action Employer— 50% Recycledh0% Post Consumer Paper TRENTWOODT�=7/a&e. HARDWARE 3501 TRENT ROAD • NEW BERN, NORTH CAROLINA 28562 • 252-636-2353 Mike and Carl, Please have Marine Solutions handle pier and bulkhead permits from CAMA and NCDENR for me at my home at 1308 and 1310 Brices Creek Rd, New Bern, NC. Sincerely, 5 Charles Foret Help Is Just Around The Corner_ ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIERIMOORING PILINGSBOATLIFTBOATHOUSE) I hereby certify that I own property adjacent tos (Name of property. owner) Property located at .- (lot, block, road, etc.) on f 1 C 5 C (O d C , in New Bern/ Craven . N. C. (Water body) (Town and/or county) He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. I do not wish to waive the setback requirement. bl�v 4rhl o wish to waive that setback requirement. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (to be filled in by individual proposing development) (A 1' an In ton) Mailing Address /��d city/State /Zip / fz-1 - A4ephon umber 4 Date V . Date ype Name Owqer Information) W►0 ltl'oh.' ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/MOORING PILINGSBOATLIFTBOATHOUSE) 4U a.Di I hereby certify that I own property adjacent to (Name of property owner) Property located at 9-) '-'- V'� f :fs I n , r (lot, block, road, etc.) , in New Bern/ Craven . N.C. (Water body) (Town and/or county) He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. I do not wish to waive the setback requirement. I do wish to waive that setback requirement. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (to be filled in by individual proposing development) O O O Q O o u X �(JCc (I ;� O► 4D / CL C �A�plica t Ig#'ormati ) Mailing Address City/ tate /Zip rephon umber Date ac: T . (yro n 4- '461, P Tee ,frox. zcn (Ri nrian Propprty, Owner nformation) Signature , 1 a f n � �- �; Print or T e e 3 4Q aa.S - Telephone Number 9ja3��� Date