Loading...
HomeMy WebLinkAbout59780_FERNANDEZ, JOE_20120307o CAMA / ❑ DREDGE & FILL GENERAL PERMIT ❑New ❑Modification ❑Complete Reissue [-]Partial Reissue As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC_ Applicant Name Project Location: County Address i? Street Address/ State Road/ Lot #(s) City -State "f ZIP = Phone # (_) _ Fax # ( "�""""" "�""`"' Subdivision Z k Authorized Agent �_ '"'� i i.'1V City i }� t" ki, Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS Phone # ( ) AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A Adj. Wtr. Body-- [] PWS: ❑ FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body_ Previous permit # Date previous permit issued ❑ Rules attached. ZIP River Basin _ nat _/man_/unkn . • ... . •. . ME LR■EM"IMEM■■■I►�f�!■�111■tl�■■■■■■■■■■■■■■ L■■■�■■c�ci�■■i■■■■�■■w�■■■■ram■■■�i■■■■■■ ■■■■■■■■■■■■■■■m■'1m■E■■■E■■■■■■■■■■ ■■■■■■■■■■�■EMEER omEE■OMEN■■■■MEMO ir ■■■■■■■■E■■■■■■ii■■■Il■r■■■■■■■■■® OR MMEEEW�■■■IL■■ ®■■■■fir I■■■■■■NEE iIIJE■■■■■■►1■■■■■,►7Y■■■ ■■■i�■I�■■■■■■■[on■ MOEN ME ■■■■ENE■■MEMO ■■■■■■■■■■■■■■■■■■■■■■■■■O■■■■■■■■■ ... •■■MEMO■■■■■■E ■■■■ EMMEMEM Agent or Applicant Printed Name Permit Officer's Signature Signature Please read compliance statement on back of permit Application Fee(s) Issuing Date Check # Local Planning Jurisdiction Expiration Date Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 08/09/06 r� NC®ENR North Carolina Department of Environment and Natural (Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Director Secretary BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 026.0259 & 0233. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. 1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any of ter activity that would remove understory vegetation is allowed. f • Pre -project site conditions: 5. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading, and construction corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above liste�.conditions and verify that a information is complete and accurate. get t_or Ap Ij.cant Print ' Name ermit 0 iceer' `S gnature Agent or Applicant Signature _ % Issue Date . CAMA GENERAL PERMIT Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue One Washington, NC 27889 Morehead City, NC 28557 NorthCarolina Phone 252-946-6481 Phone 252-808-2808 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper A7atmu//- _ "y Version 5, 09/2009 N i DENR � ounces Noah C;,!l olina Di ,partment o� Environment mNatural F.�•s t ivlsion of I.Oastai Manac- t)ae freeman, Secretary Beverly Eaves Perdue, Govni Or James tl, Gregson, Direc;.:,r Date Applicant Name 'rCk ry Mailing Addresis G to act on nRy I certify that I Dave uuthori zed (agent) • - lying for and attaining s f. CAMA permits necessary to behalf, for the }put'j: a se of a ppY g install or construct (activit r) -/ — �� CrG U �1--Ow �G- at (lacation) dat ✓ �� �� �- i /� This derti a.ti. r r� ( - Signature _ 400 Gortimerce Aenvte, Morehead ( ity, North Caroiinc128557 Phone: ". 52.8Q8-:'$G81 FAX. �:52.247-33301 Intl !rn : t: www.ncc.owtalmanayment.net Al t=a ,al Opt oriu city 1 Aff rmati ie p ction Employer — 5f % f ;:cycled k I A Post-cnwmer P2per