Loading...
HomeMy WebLinkAbout55250_NC DOT_20101028❑ICAMA / ❑ DREDGE & FILL ���.�'/U1`I••t GENERAL PERMIT Previous permit # 9? ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC D Rules attached. Applicant Name Address City State ZIP Project Location: County Street Address/ State Road/ Lot #(s) Phone # Oa Fax # (�} Subdivision r Authorized Agent City ZIP Affected pCW ❑EW [9TTA ❑TES ❑PTS Phone # ( ) River Basin ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A LkT AEC(s): ❑ PWS: ❑ FC: Adj. Wtr. Body (nat man unkn) ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body Type of Project/ Activity Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards_ Boat ramp Boathouse/ Boatlift Beach Bulldozing Other ' Shoreline Length SAV: not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions Agent or Applicant Printed Name (Scale: See note on back regarding River Basin rules. Permit Officer's Signature Signature Please read compliance statement on back of permit Issuing Date ApplicationFee(s) Check# Local Planningfurisdiction Expiration Date Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Morehead City Headquarters Mailing Address: 400 Commerce Ave 1638 Mail Service Center Morehead City, NC 28557 Raleigh, NC 27699-1638 252-808-2808/ 1-888ARCOAST Location: Fax: 252-247-3330 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 06/09/06 C�CAMA / [�i-OREDGE & FILL N9 55250 GENERAL PERMIT Previous permit# -- [�f<ew ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources 2 3 4 c and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC / r uses attached. Applicant Name 7� C Project Location: County Oilr� Address J 13 /7 T ✓�� ✓i. / �'2 1 0 0 Street Address/ State Road/ Lot #(s) City �' "` State L zip a 7 1 ?� J. y Y�i (c�► (" // o n Phone # ( 4'rl -777'7Fax # r_) 4(I! C /-y W r Authorized Agent VCW &-fW 2'kA QfS ❑ PTS Affected ElOEA ❑ HHF ElIH ❑ UBA ❑ N/A AEC(s): ❑ PWS: ❑FC: ORW: yes /(T19) PNA yes / no, Crit.Hab. yes / no Type of Project/ Activity t .c 11�'tr �n c'1 �+ 3 6 Pier (dock) I Platf, Fingf Groi Build Basir Boat Boat Beac Othe Shor SAV: Sand Mor; Phot Wain Subdivision city f � � / o ,( N C ZIP /,17 '�,--7`1 _% ? Phone # ( ) River Basin / Adj. Wtr. Body nat man Junkn Closest Maj. Wtr. Body (Scale: wm(s) � � i r----- ` - -- + - -- r pier(s) length number lead/ Riprap length avg distance offshore max distance offshore channel - -"- � _ f - LAPiC.�1--�- b r�vc � a-' 1, 2 - - 1 I'l J t- - ,, - � _ -- i .�l'� -�--�- cubic yards - i ramp- r— louse/ Boatlift -- i -r — --�rt j - —i — i Bulldozing b t vs ✓ r f-i T T Mine Length ? not sure yes gags: not sure yes no torium: n/a yes no is: a no- crG—k—+ vac Cn) E ' -. __I —_ C I 1 -i i -� f-—T -i I _-__ L A building permit may be required by: 4-1 { Notes/ Special Conditions 1), � `` 1 ❑ See note on back regarding River Basin rules. !/� l I it �c i inn I �2. i1'l i�.s��(� ✓it i/ L+.� ( ,C��l� %: �12�n �� t Y'1-t'-�'�tll�n „i,(� ^ n C <--�� V,rA'.' i cc.J ,. +--,;r o 7c- / t`s-- fL-i J r ; N Ist W � � C� r. �(Q d c / ri Grv�a.�(1 �' r . I ✓ ^,1L' .:max ft-�-�/-j'�`:- ,�'?: ^.;tf.:, .(��c � •s" �zl fti :�..• Agent or Applicant Printed Name Signature Please read compliance statement on back of permit 't �wI-I6�L$11 Application Fee(s) Check # PermitOfficeK Signature-�— I0-:-3-lO )-1-13 Issuing Date Expiration Date Local Planning jurisdiction Rover File Name ALT, NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary October 28, 2010 Clay Willis NC DOT 113 Airport Drive, Suite 100 Edenton, NC 27932 Dear Mr. Willis: Attached is General Permit #55250C to construct a 36"x60' culvert at US264, 1.4 miles of SR1100 in Stumpy Point, NC. In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, 'Stephen Lane Coastal Management Representative lsb Enclosures 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper y � � .. .. .�� , d uw . ..x..e:+b1 .� a s,3 � s�3a. .. .r �M ... ... y .x✓wf •"4... aY �. xd,. .n .•ti ` J Ufzi ,{ rn Applicant: Date N c a", /p-1;F- l- Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount rr,,// ✓� Dredge ❑ Fill [Er"Both ❑ Other ❑ 3 b Dredge ❑ Fill [Er Both ❑ Other ❑ Dredge ❑ Fill ❑ Both Other ❑ `i O ' O Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Ala'f" -� 3 5 _Z_ - � 'I Z-'?— BEVERLY EAVES PERDUE GOVERNOR SryycAr,TE� F STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION October 5, 2010 Claudia Jones Division of Coastal Management 1367 U.S. 17 South Elizabeth City, NC 27909 Dear Ms. Jones, RECEIVED OCT - 5 COASTAL MANAGEMENT ELIZABETH CITY EUGENE A. CONTI, JR. SECRETARY This letter is requesting a general permit .2300 be issued for a pipe replacement on US 264, 1.4 miles south of SR 1100 in Dare County. The current pipe is failing and needs to be replaced to ensure safe public travel. The existing pipe (I @ 60' x 30" CMP) will be replaced with the proposed pipe (1 @ 60' x 36" CAP). The road shoulder at the inlet and outlet of the pipe will be stabilized with rip -rap. The Division of Coastal Management considers the project area to be within an AEC that requires authorization for the pipe replacement. Included with this request are the MP -I, MP-2, MP-5 forms, location map, landowner notices, and permit drawings depicting the proposed work. The WBS element # is 1.102811. If any additional information is needed please contact Clay Willis at 252-482-7977. Sincerely, Jerry Jennings, P.E. Division Engineer, Division One Clay Willis Environmental Officer, Division One 113 Airport Drive, Suite 100, Edenton, NC 27932, Phone (252)-482-7977, Fax (252)-482-8722 IN MP-1 RECEIVED Arrueariox for OCT - '1 Major Development Permit COAESTAL LIZABETH CITYENT (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name N.C. Department Of Transportation Project Name (if applicable) US 264 Pipe Replacement Applicant 1: First Name Clay MI Last Name Willis Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 113 Airport Road, Suite 100 7�7 City Edenton State NC ZIP 27932 Country Phone No. 252 482 - 7977 ext. FAX No. 252 - 482 - 8722 Street Address (if different from above) City State ZIP Email 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> Fbrm DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Dare US 264, 1.4 miles south of SR 1100 Bayview Drine US 264 Subdivision Name City State Zip Stumpy Point NC 27978 - Phone No. Lot No.(s) (if many, attach additional page with list) - - ext. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank UT to Stumpy Point Bay c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade []Unknown Stumpy Point Bay e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed []Yes ®No work falls within. n/a 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 24' 2400 c. Size of individual iot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 3 ❑NHW or ®NWL e. Vegetation on tract Various roadside grasses on a maintained shoulder. f. Man-made features and uses now on tract US 264 g. Identify and describe the existing land uses adiacent to the proposed project site. Forested wetlands in conservation with the Alligator River National Wildlife Refuge. h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? N/A (Attach zoning compliance certificate, if applicable) []Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. OYes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a Yes ZNo ❑NA National Register listed or eligible property? <Form continues on next page> m. (1) Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes []No (III) If yes to either (I) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) 2 a2-008-2808 .. 1-888-4RCOAST wwrw.�7ccoastalszarna�ae�errse��t.rest Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment facilities. None o. Describe existing drinking water supply source. None p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ®Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The purpose of this project is to replace the existing pipe that is structuarlly failing on US 264. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Methods of construction will be concurrent with NCDOT Best Management Practices for the replacement of pipes. A tracked excavator, backhoe, and dump truck will be used during construction. d. List all development activities you propose. Replace the existing pipe 1 @ 60' x 30" Corrugated Metal Pipe with 1 @ 60' x 36" Corrugated Aluminum Pipe. e. Are the proposed activities maintenance of an existing project, new work, or both? Maintenance f. What is the approximate total disturbed land area resulting from the proposed project? 240 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Surface runoff from US 264. i. Will wastewater or stormwater be discharged into a wetland? ❑Yes No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? []Yes JDNo ❑NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. 252-808-2808 1-888-4RCOAST .. wwrw.nccoastatmanagement-net Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Mike Bryant, Alligator National Wildlife Refuge Manager Phone No. RECEIVED Address P.O. Box 1969 Manteo, NC 27954 OCT Name COASTAL MANAGEMENT Phone No. ELIZABETH CITY Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify th t th information provided in this application is truthful to the best of my knowledge. Date Print Name _Clay Willis, Environ ental Officer Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ®DCM MP-5 Bridges and Culverts 2 5 2 - 8 0 8 - 2 8 0 8 .. 1-888-4RCOAST .. www.riccoastalmanagement.net Form DCM MP-1 (Page 5 of 5) APPLICATION for Major Development Permit ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information 252-808-2808 . 'I-888-4RCOAST -. www.iiccoastairnanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) RECEIVED OCT - 5 COASTAL MANAGEMENT ELIZABETH CITY Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the excavation in these areas: d. High -ground excavation in cubic yards. 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? []Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of disposal in these areas: d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes []No ❑NA (ii) If yes, how much water area is affected? ,m.3 -ii t3- tf :: ` -888- tC0A� T ;: wsuv . � caastalrn r� c crc et t.net revised. 1142 ; 06 . , 1 Forin DCrA- (Exraa vation and Fait, Pate 2 of 21 3. SHORELINE STABILIZATION [I This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: []Bulkhead ®Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: 4' e. Type of stabilization material riprap Z�GSS g. Number of square feet of fill to be placed below water level Bulkhead backfill Riprap 32 Breakwater/Sill Other i. Source of fill material. b. Length: 18' Width: 11' d. Maximum distance waterward of NHW or NWL: 5' f. (i) Has there been shoreline erosion during preceding 12 months? []Yes ®No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. riprap 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (C;W), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the (ii) Amount of material to be placed in the water number of square feet affected. (iii) Dimensions of fill area ❑CW ❑SAV ❑SB (iv) Purpose of fill OWL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Using NCDOT Best Management Practices for soil and erosion tracked excavator, backhoe, dumptruck control. c. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. Date US 264 pipe replacement Project Name d. (i) Will wetlands be crossed in transporting equipment to project site? []Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Clay Willis, Division Environmental Officer Applicant Name OCT -5 Applicant Signature COASTAL MANAGEMENT ELIZABETH CITY �.��n�o�s>..�€i➢x:t :: 1�Eiss-RC7t1i" .: vvv�a.ra�crsa�2;�i:�f,� orr�t ct4 � " �;; :�, " :� ,, ; Form rexers BRIDGES and CULVERTS RECEIVED =-5 COASTAL MANAGEMENT ELIZABETH CITY Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES ®This section not applicable a. Is the proposed bridge: b. Water body to be crossed by bridge: ❑Commercial ❑Public/Government ❑Private/Community c. Type of bridge (construction material): d. Water depth at the proposed crossing at NLW or NWL: e. (i) Will proposed bridge replace an existing bridge? ❑Yes []No f If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) 9. Length of proposed bridge: i. Will the proposed bridge affect existing water flow? If yes, explain: (i) Will proposed bridge replace an existing culvert? []Yes ❑No If yes, (ii) Length of existing culvert: (iii) Width of existing culvert: (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) h• Width of proposed bridge: ❑Yes ❑No j. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? ❑Yes ❑No If yes, explain: k. Navigation clearance underneath proposed bridge: I. Have you contacted the U.S. Coast Guard concerning their approval? ❑Yes ❑No If yes, explain: m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: waters? ❑Yes ❑No If yes, explain: 2. CULVERTS El This section not applicable a. Number of culverts proposed: 1 b. Water body in which the culvert is to be placed: Unnamed tributary (manmade canal) to Stumpy Point Bay. < Form continues on back> C. Type of culvert (construction material): 1 - 60' x 36" Corrugated Aluminum Pipe 252-808-2808 :: 1-888-4RCOAST :: www.nccoastatm.anagement.net revised- 10126iO6 1 ' ' • Sri" DCM MP-5 (Bridges and Culverts, Page 2 of 4) d. (i) Will proposed culvert replace an existing bridge? ❑Yes ®No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) Will all, or a part of, the existing bridge be removed? (Explain) f. Length of proposed culvert: 60' h. Height of the top of the proposed culvert above the NHW or NWL. 1.5' j. Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? ❑Yes ®No If yes, explain: e. (i) Will proposed culvert replace an existing culvert? ®Yes []No If yes, (ii) Length of existing culvert(s): 60' (iii) Width of existing culvert(s): 30" (iv) Height of the top of the existing culvert above the NHW or NWL: 1.5' (v) Will all, or a part of, the existing culvert be removed? (Explain) All 9, Width of proposed culvert: 36" I. Depth of culvert to be buried below existing bottom contour. 0.5' k. Will the proposed culvert affect existing water flow? ®Yes ❑No If yes, explain: Enhance hydrologic flow regimes. 3. EXCAVATION and FILL ❑This section not applicable a. (i) Will the placement of the proposed bridge or culvert require any b. (i) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? ®Yes ❑No excavation within coastal wetlands/marsh (CW), submerged If yes, aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square (ii) Avg. length of area to be excavated: 60' feet affected. (iii) Avg. width of area to be excavated: 4' ❑CW ❑SAV ❑SB (iv) Avg. depth of area to be excavated: 2' OWL ®None (v) Amount of material to be excavated in cubic yards: 17.78 (ii) Describe the purpose of the excavation in these areas: c. (i) Will the placement of the proposed bridge or culvert require any high -ground excavation? ®Yes []No If yes, (ii) Avg. length of area to be excavated: 55' (iii) Avg. width of area to be excavated: 5' (iv) Avg. depth of area to be excavated: 2' (v) Amount of material to be excavated in cubic yards: 20.4 RECEIVED :CT - COASTAL MANAGEMENT ELIZABETH CITY s • ..; a s r • 4 . i. Foem DCM MP-5 (Bridges and Culverts, Page 3 of 4) d. If the placement of the bridge or culvert involves any excavation, please complete the following: (i) Location of the spoil disposal area: NCDOT approved waste area site. (ii) Dimensions of the spoil disposal area: N/A (iii) Do you claim title to the disposal area? ®Yes ❑No (If no, attach a letter granting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ®Yes ❑No (v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV OWL ❑SB ®None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ? []Yes NNo If yes, give dimensions if different from (ii) above. e. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? NYes ❑No If yes, (ii) Avg. length of area to be filled: 18 (iii) Avg, width of area to be filled: 3=5' (iv) Purpose of fill: Bank stabiliztion. g. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high -ground? ❑Yes NNo If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: 4. GENERAL (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW _ ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary utility lines? []Yes NNo detour structures? ❑Yes NNo If yes, explain: If yes, explain: If this portion of the proposed project has already received approval from local authorities, please attach a copy of the approval or certification. < Form continues on backer c. Will the proposed project require any work channels? d. How will excavated or fill material be kept on site and erosion ❑Yes NNo controlled? If yes, complete Form DCM-MP-2. Using NCDOT best management practices for sediment and erosion control. 252-808-2808 :: 1-888-4RCO AST :: www. nccoastalmanagement.net revised: 10/26/06 k i1 FoeM DCM MP-5 (Bridges and Culverts, Page 4 of 4) e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? tracked excavator, dumptruck, backhoe g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? ®Yes [:]No If yes, complete form MP-2, Section 3 for Shoreline Stabilization only. Date US 264 Pipe Replacment Project Name Clay Willis, Environmental Officer plicant Name p plicant Signature f. Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No If yes, explain steps that will be taken to avoid or minimize environmental impacts. RECEIVED OCT - 5 COASTAL MANAGEMENT ELIZABETH CITY r ,.10126106 US HWY 264 DARE COUNTY NOTE: BOTTOM OF NEW PIPE TO BE PLACED 6" TO 1' BELOW SILT LINE NOTE: CLASS B STONE TO BE PLACED AROUND END OF PIPES PROPOSED CLASS B RIP RAP T( El IN\ PROPOSED PIPE 1(§ 60'@ 38"CMP DETAIL SECTION CROSS SECTION CL US 284 ELEV.100.64 PROPOSED CLASS B TOP OF PIPE 98.74 RIP RAP _ - WL_@Z.67 SILT 95,9 PROPOSED PIPE 1(9 60'(9 36"CMP INVERT ELEV. 96.24 EXISTING PIPE 1 @60'Q 30"CMP DETAIL SECTION END VIEW NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY: DARE COUNTY QUAD ENGELHARD BASIN o PASQUOTANK PROJECT PIPE REPLACEMENT WBS ELEMENT; 1.102811 DAAIyN BY,JGC SCALE P-10' DAM ao-i 2010 OF EXISTING PIPE 98.74 EXISTING PIPE ELEV. 96.24 FINISRED EARTH SLOPE AS REQUIRED �l PROPOSED RIP RAP FOR SHO �"Ak STABLIZAT 4T N RZ, a US 264 pipe replacement 1.4 mi. S. of SR 1100 Bayview Drive dr z- ,46 4V. qP pipe lot 35 41.35--2-1 i 46.88 �75 USGS Quad - Englehard NE Pasquotank River Basin BM f Ali j` StUTAPY.y- 1 152 Atoo, Mi Gusp. Tabunacle RECEIVED ECE'VED the OCT — 5 a meLCOASTAL MANAGEMENT z 3 LA TH ELIZABETH CITY STUAlPFpcf POINT BAY 0 0.1250.25 0.5 Miles I I I I I I I I Kazer pdint P A M L 1A N W+E S S ■ C6mplete items 1, 2, arid 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, + or on the front if space permits. Article Addressed to: Mike Bryant U.S. Fish & Wildlife Service Alligator River Wildlife Refuge P.O. Box 1969 Manteo, NC 27954 M V gent ❑ Addressee eceivegy (Printed Name) C. Date of Delivery D. Is dXyery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No PO a ('5i 6 �a� tic 219 3. Service Type Gertffled Mail ❑ Express Mail Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number 7009 2820 0003 3738 2534 (Transfer from service label) PS Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 UNITED STATES POSTAL SERVICE '" Fif st l • Sender: Please print your name, address, and ZIP+4 in this box :..cr i Ur I hiiNorUh i f- . DIVISION OFFICE 13 AIRPORT DRIVE, SUITE 1( EDENTON, NC 27932 -,ni irnrr, i n_F1_f - BEVERLY EAVES PERDUE GoVERNOR s,w STA7F u STATE OF NORTH CAROLINA September 9, 2010 Mike Bryant U.S. Fish and Wildlife Service Alligator River National Wildlife Refuge P.O. Box 1969 Manteo, N.C. 27954 Dear Mr. Bryant, RECEIVED OCT - 5 201 COASTAL MANAGEMENT ELIZABETH CITY EUGENE A. CONTI, JR. SECRETARY CERTIFIED MAIL The NC Department of Transportation is proposing to replace 1 metal pipe south of Stumpy Point on US 264. The site is located approximately 1.4 miles south from the intersection of SR 1100 ( Bayview Drive). The existing pipe is 60' x 30" and the proposed pipe is 60' x 36" with the inlet and outlet ends of the pipe stabilized with riprap. All work will be conducted within NCDOT right-of-way. The Division of Coastal Management (DCM) considers the adjacent waters to be estuarine waters under their regulations. Therefore, it is provided protection under state law. For this reason the NCDOT will apply for a permit from the DCM to perform the described work. Part of the permit process is notifying the adjacent landowners of the proposed work. A map depicting the project area, along with a design plat is included with this letter. If you have any questions concerning the proposed work you can contact Clay Willis at 252-482-7977. 113 Airport Drive, Suite 100, Edenton, NC 27932, Phone (252)-482-7977, Fax (252)-482-8722 The attached form is submitted to insure that you have an opportunity to comment on the proposal. The work is depicted on the attached drawings. If you have no objects to the proposal, please return the form with your response within ten (10) days to this office. If you do have objections to the project, please forward your comments to: Claudia Jones NC Division of Coastal Management 1367 U.S. 17 South Elizabeth City, N.C. 27909 No response within ten (10) days will be construed to mean you have no objections. Thank you for your cooperation. Sincerely, Jerry Jennings, P.E. Division Engineer, Division One Clay Willis Environmental O/'�� r Division One ADJACENT RIPARIAN LANDOWNER STATEMENT ( Dare County: US 264, 1.4 miles south of SR 1100 ) I, , am an adjacent riparian property owner and am aware of the North Carolina Department of Transportation's plans for the pipe replacement on US 264. I am further aware that this work will occur in an AEC and therefore will require authorization from the Division of Coastal Management in accordance with the Coastal Area Management Act (LAMA). I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. are attached. I have objections to the project as presently proposed and my comments Signature of Adjacent Landowner Date: