HomeMy WebLinkAbout53024_MIES, JOHN_20081120L CAMA / ❑ DREDGE & FILL y� Zoo �S g 1? 1C
GENERAL PERMIT Previous permit#
C!NeW ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources V�AJ
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
Rules attached.
Applicant Name
M
Address
City_ 11) State IC ZIP
Phone # (�,`,) ��j�—��c, 17ti? Fax # ()
Authorized Agent c;�. 6X: "C"" e
Affected .Q CW ❑ EW So PTA $(ES ❑ PTS
): ❑ OEA C HHF ElIH ElUBA [I N/A
AEC(
❑ PWS: ❑ FC:
ORW: yes / (no PNA yes / no Crit.Hab. yes / no
Type of Project/ Activity
Pier (dock) length ; y p r L '
Platform(s)� ' Y'
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramps
Boathouse/ Boatlift. I", }!x � )
Beach Bulldozing
Other
Shoreline Length ?'
SAV: not sure yes no ---�--
Sandbags: not sure yes no i
Moratorium: n/a yes no.
Photos: yes no
Waiver Attached: yes no ---
A building permit may be required by:
Notes/ Special Conditions (! t n
Ajent o p cant Name f
6
Signature Please reacPcompliance statement on back of permit
Application Fee(s) Check #
Project Location: County__
Street Address/ State Road/ Lot #(s)
Subdivision
City_ 7 f, '., , , I _ ZIP 4,�-71
Phone # ( 252 % i --, Sri` i River Basin
Adj. Wtr. Body (rf4 /unkn)
Closest Maj. Wtr. Body
�—L
(Scale: )
See note on back regarding River Basin rules.
PermitOfficer's Signature
111 09 126105
Issuing Date Yxpirationbate
11
1- -V191311A
Local Planningjurisdiction 'Rover File fame
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
L: DREDGE & FILL N? 53024�
F i���i 4L PERMIT Previous permit #
New CModification Complete Reissue E Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ��, ja o0
Rules attached.
Applicant Name Z Project Location: County To". 01 c•a
Address �� rnr' �___1, QnQz Street Address/ State Road/ Lot #(s)AL20 �C�¢
City---Z c4 — State lk zip .21 2$z
Phone # (31,) 30-" j j74 Fax # (_) Subdivision
Authorized Agent �011 Q?CtLA1�1^Q City ���g, a�1 _ zip 1�
Affected , CW XEW PTA XES ❑ PTS Phone # (3.52) ��_a -4 r1 River Basin
i
CJ OEA ❑ HHF ❑ I ❑ Ll H UBA N/A
AEC(s): Adj. Wtr. Body _Qj_V�-tex- '�Yr�q, __{a /man /unkn)
❑ PWS: ❑FC: n
�l' Closest Maj. Wtr. Body
ORW: yes / no PNA (e—g no Crit.Hab. yes / 6.
Type of Project/ Activity Or'¢ r + Lo A'f7F
(Scale:.Q7S )
Pier (dock) length - -
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length _
avg distance offshore
max distance offshore /l..v (i, r, Q -V
Basin, channel
cubic yards _
Boat ramp
Boathouse BoatlA (S-11r
Beach Bulldozing
Other_
t I
Shoreline Length 26
SAV: not sure yes r% 4" l
Sandbags: not sure yes lY v
Moratorium: n/a yes
Photos: yes i
Waiver Attached: yes 811
A building permit may be required by: P�,.l\ cu , o•
Notes/ Special Conditions ��
I
t -
1
t
J
t�
1 Z
I
,f See note on back regarding River Basin rules.
1 I ti._ .t" � _ I , - - -, I -
a
1�
y �
5} C bC � lJ:.{:3-11 �� ' S ' �';:Cir. \Vr 1 ru.. 7�c-Cec, ii � � sr� � � rr�, , �., i �av cc ; r•.
M } C , ? c y''jt` vp v Y111+; 3�A
Agent or Applicant*rinted"Name
§ikoature ** Please read compliance statement on back of permit **
Application Fee(s) Check #
Permit Officer's S►ghature
_it 120 ' 31� lay
Issuin Date xpiration Date
G. TT I t 1 V A
Local PlanningJurisdiction Rover File Name
4 ,
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
November 19, 2008
Don Oxendine
5114 Kershaw Rd.
Oriental, NC 28571
Attached is General Permit #53024C to install a 140' pier and a 13X13 Boatlift, at 1320 Orchard
Creek Rd in Oriental, NC
In order to validate this permit, please sign the permit as indicated. Retain the white copy for
your files and return the signed yellow and pink copies to us in the enclosed, self-addressed
envelope. If the signed permit copies are not returned to this office before the initiation of
development, you will be working without authorization and will be subject to a Notice of
Violation and subsequent civil penalties.
We appreciate your early attention to this matter.
Sincerely,
Barry Guthrie
Coastal Management Representative
lsb
Enclosures
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastaimanagement.net
An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper
Page 2.
This Buffer Authorization is not considered approved until the DWQ has received both
this signed form AND the project map.
Submit the requested information to:
Division of Water Quality
Attn: Surface Water/Buffer Program
943 Washington Square Mall
Washington, NC 27889
By your signature below you agree to be held responsible for meeting ALL of the above listed
conditions and verify that all information is complete and accurate. Please be aware, violations
of the above -listed conditions are subject to civil penalty assessment of up to twenty-five
thousand dollars ($25,000.00) per violation per day.
Applicant/Agent's Signature
CAMA General Permit Number:
North Carolina Division of Water Quality
943 Washington Square Mall
Washington, NC 27889
Internet: ww`w.nca,aterqualit -Or;
Phone: 252-946-6481
FAX 252-946-9215
An Equal OpportunitylAffirmative Action Employer- 50% Recycled110% Post Consumer Paper
Date
NorthCarohna
Naturally,
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Chuck Wakild, Deputy Director
BUFFER AUTHORIZATION CERTIFICATE FOR PIER ACCESS
A riparian buffer authorization is required for an approved access way through the Tar -Pamlico
& Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC
02B.0233 & .0259.
Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have
a Buffer Authorization from the DWQ as long as the project can meet ALL of the conditions
listed below. If ALL of the avoidance and minimization guidelines listed below cannot be met, a
separate buffer authorization request must be submitted using a Pre -Construction Notification
(PCN) application to DWQ at the address below.
A PCN application may be obtained on the DWQ site http://h2o.enr.state.nc.us/wetlands.htm1.
Any questions regarding this process should be directed to the wetland/buffer staff of the DWQ
in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh
Central Office at 919-733-6893.
A written authorization from DWQ MUST be received prior to any construction activities in the
riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to
construction &/or land clearing shall subject the property owner & the party (contractor)
performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per
violation.
❑ Pier access must cross the riparian buffer perpendicularly (which is defined as between
75 and 105 degrees). The alignment should also be located to minimize the removal of
woody vegetation to the greatest extent practicable.
❑ Walkway/access shall be made of pervious materials like open -slatted wood, mulch, or
grass. The use of impervious materials like concrete, pavers, or gravel will require a
PCN review and a separate Buffer Authorization. A request for an impervious walkway
shall include a justification of need.
❑ The width of the access is limited to six (6) feet or less. A width of greater than 6 feet
wide shall require a PCN review and a separate Buffer Authorization. A request for an
access greater than 6 feet shall include a justification of need.
❑ Please submit a project map of your property indicating the location of the pier and any
requested walkway/access.
North Carolina Division of Water Quality Intemet: www.ncwaterqualitv.org
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equa! Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper
NorthCarolina
;Vatmully
Page 2-
This Buffer Authorization is not considered approved until the DWQ has received both
this signed form AND the project map.
Submit the requested information to:
Division of Water Quality
Attn: Surface Water/Buffer Program
943 Washington Square Mall
Washington, NC 27889
By your signature below you agree to be held responsible for meeting ALL of the above listed
conditions and verify that all information is complete and accurate. Please be aware, violations
of the above -listed conditions are subject to civil penalty assessment of up to twenty-five
thousand dollars ($25,000.00) per violation per day.
Applicant/Agent's Signature
CAMA General Permit Number:
S3O �y C
North Carolina Division of Water Quality Internet: www.ncv<•aterqualitv.org
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-92I5
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post consumer Paper
Date
Nne
orthCarolina
Natimally
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Chuck Wakild, Deputy Director
BUFFER AUTHORIZATION CERTIFICATE FOR PIER ACCESS
A riparian buffer authorization is required for an approved access way through the Tar -Pamlico
& Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC
02B.0233 & .0259.
Activities covered by your Coastal Area Management Act (LAMA) permit are deemed to have
a Buffer Authorization from the DWQ as long as the project can meet ALL of the conditions
listed below. If ALL of the avoidance and minimization guidelines listed below cannot be met, a
separate buffer authorization request must be submitted using a Pre -Construction Notification
(PCN) application to DWQ at the address below.
A PCN application may be obtained on the DWQ site http://h2o.enr.state.nc.us/wetlands.htm1.
Any questions regarding this process should be directed to the wetland/buffer staff of the DWQ
in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh
Central Office at 919-733-6893.
A written authorization from DWQ MUST be received prior to any construction activities in the
riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to
construction &/or land clearing shall subject the property owner & the party (contractor)
performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per
violation.
❑ Pier access must cross the riparian buffer perpendicularly (which is defined as between
75 and 105 degrees). The alignment should also be located to minimize the removal of
woody vegetation to the greatest extent practicable.
❑ Walkway/access shall be made of pervious materials like open -slatted wood, mulch, or
grass. The use of impervious materials like concrete, pavers, or gravel will require a
PCN review and a separate Buffer Authorization. A request for an impervious walkway
shall include a justification of need.
❑ The width of the access is limited to six (6) feet or less. A width of greater than 6 feet
wide shall require a PCN review and a separate Buffer Authorization. A request for an
access greater than 6 feet shall include a justification of need.
❑ Please submit a project map of your property indicating the location of the pier and any
requested walkway/access.
North Carolina Division of Water Quality Internet: www.ncwaterqualitv.org
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer— 50% Recycledl10% Post Consumer Paper
NoithCarolina
Natiarally
Donald Oxendine NCDL 3584956'
Donna Molina NCDL 8050154
66-770412531 1190
5114 Kershaw Rd.
Oriental, INC 28571-8723
® EZShleld
Fraud Prokxtlo
Ph. 252-249-1301
Date
Pay to the (�jr
Order of , �1 \ qk
$ �,®�
!�
Comains Security
R
Dollars L!J Fe Back. 0elao
en
STATE EMPLOYEES' CREDIT UNION.
NEW BERN, NORTH CAROLINA
-
ForDo.
J
1:253 L7?01,91:0863094867911L L90
` ®CHECK GALLERY, 2001 STYLE #P50 1-800-354-3540 w .checkgallery.com
P-ted on recycled paper using vegetable bawdinks ®MARIE BUCHFINK. LICENSED BY RICH WISEMAN. LLC.
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Chuck Wakild, Deputy Director
BUFFER AUTHORIZATION CERTIFICATE FOR PIER ACCESS
A riparian buffer authorization is required for an approved access way through the Tar -Pamlico
& Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC
0213.0233 & .0259.
Activities covered by your Coastal Area Management Act (CAMA) permit are deemed to have
a Buffer Authorization from the DWQ as long as the project can meet ALL of the conditions
listed below. If ALL of the avoidance and minimization guidelines listed below cannot be met, a
separate buffer authorization request must be submitted using a Pre -Construction Notification
(PCN) application to DWQ at the address below.
A PCN application may be obtained on the DWQ site http://h2o.enr.state.nc.us/wetlands.html.
Any questions regarding this process should be directed to the wetland/buffer staff of the DWQ
in the Washington Regional Office at 252-946-6481, or the 401 Oversight Unit in the Raleigh
Central Office at 919-733-6893.
A written authorization from DWQ MUST be received prior to any construction activities in the
riparian buffer, including land clearing. Failure to secure a Buffer Authorization prior to
construction Wor land clearing shall subject the property owner & the party (contractor)
performing the construction &/or land clearing to a civil penalty of up to $25,000 per day per
violation.
❑ Pier access must cross the riparian buffer perpendicularly (which is defined as between
75 and 105 degrees). The alignment should also be located to minimize the removal of
woody vegetation to the greatest extent practicable.
❑ Walkway/access shall be made of pervious materials like open -slatted wood, mulch, or
grass. The use of impervious materials like concrete, pavers, or gravel will require a
PCN review and a separate Buffer Authorization. A request for an impervious walkway
shall include a justification of need.
❑ The width of the access is limited to six (6) feet or less. A width of greater than 6 feet
wide shall require a PCN review and a separate Buffer Authorization. A request for an
access greater than 6 feet shall include a justification of need.
❑ Please submit a project map of your property indicating the location of the pier and any
requested walkway/access.
North Carolina Division of Water Quality Internet: www.ncwaterquality.ore One
943 Washington Square Mall Phone: 252-946-6481 NorthCarohna
Washington, NC 27889 FAX 252-946-9215 Naturally
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper
Page 2
This Buffer Authorization is not considered approved until the DWQ has received both
this signed form AND the project map.
Submit the requested information to:
Division of Water Quality
Attn: Surface Water/Buffer Program
943 Washington Square Mall
Washington, NC 27889
By your signature below you agree to be held responsible for meeting ALL of the above listed
conditions and verify that all information is complete and accurate. Please be aware, violations
of the above -listed conditions are subject to civil penalty assessment of up to twenty-five
thousand dollars ($25,000.00) per violation per day.
Annlicant/A ent's.�4n
CAMA General Permit Number:
5Y) 2,4C
North Carolina Division of Water Quality Internet: www.ncwaterqualitv.org
943 Washington Square Mall Phone: 252-946-6481
Washington, NC 27889 FAX 252-946-9215
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Date
Nne
orthCarolina
Naturallff
4
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Govemor James H. Gregson, Director William G. Ross Jr., Secretary
Date
Applicant Name
Mailing Address
0
I certify that I have authorized (agentl , Y� G ja i n � to act on my
behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to
install or construct (activity),
at (location) Z aL a rj a Lee'e fj t-
This certification is valid thru (date)
Signature
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper
Z"
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIB MOORING PILINGSIBOATLIFT/BOATAOUSB)
I hereby certify that I own property adjacent to
f
I
(Name of Property Owner)
a-1—d
j (Lot, Block, Road, etc.)
""ZZ
(Waterbody) (Town and/or County)
He has dew rilmd to me, as shown blow, the davek pment he is proposing at that locafm,
and, I have no objections to his proposal. I understand that a pier/mooring
must be set back a minimum distance of fifteen fleet (I5`) from my area
of riparian access unless waived by me. -
Z/ I sttt n wish to waive the setback requirement
I to wish to waive that setback requirement.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(T'o be,JHW in by bMbi&d PropoSiMg de�sl�paresntl
1,�
0
J�D
Signature
f
Print or Type Name
elephone Number
,; t� rt
t aq.�: ' � p�`:. .t
�,
.. ... �.... ,. f
A7 ��.. � '. ' �
1 �
�•� �� i
��
_�
ADJACENT RI PAR1AN PROPERTY ORUM STATEMENT
(POR A PIERMOQRM PJ]MSIBOAIUMBOATAOM
I hereby certify that I own propexV adjacent to
uK t _1
�1 e' �17 's
(Name of Property Ownw)
OLot, Block, Road, etc.)
an,iin , N.C.
(pgaterbody) (Town and/or County)
He has described to me; as Shawn babes, the development he is propoSing at that locatk)a,
and'. I have no objecfta to his proposal. I undersuind that a p=dmariring
must be set back a minimum distance of fifteen fiat (15`) from my area
of . access uf�k= waived by me.
I do wish to waive the setback requirement
I do wish tD waive that setback requcranenL
DESCRIPTION AND/OR DRAG OF PROPOSED DEVELOPMENT:
(To bye flAW iv by &"bad PUPSAW
do
rzd% Z-
Print or Type Name
z,1-I �
Telephone Number
Date: