Loading...
HomeMy WebLinkAbout57026_MCLAWHORN, BILLY_20101208❑ CAMA / ❑ DREDGE & FILL GENERAL PERMIT � Previous permit# ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue A' Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ❑ Rules attached. A iicant Name I " Project Location: County pP Address City State ZIP Phone # O Fax # O Authorized Agent I] CW ❑ EW ❑ PTA ❑ ES ❑ PTS Affected AEC(s): OEA ❑ HHF ❑ IH ❑ USA ❑ N/A ❑ PWS: ❑ FC: ORW: yes / no PNA yes / no Crit.Hab. yes / no Street Address/ State Road/ Lot #(s) Subdivision City ZIP Phone # ( ) River Basin Adj. Wtr. Body (nat /man /unkn) Closest Maj. Wtr. Body - • ■■■:■i■.I■■■■■■:■■■■■■■■■■■■■�f�tl![l:rrilfiii■■■ :■::51M::■ENS■■■SVIFTW E MM■:■■::■::■: ■■■■■■ ■■ ■■■■■■■l1/1■■:�■■ii17■ i'3 f�i.lCiliiii■■■■■■■■■■■■■ ■■■■■■■■ii■■■fir■■■■�■■■�f■■■■■■■®®■■■■■■ ■■■.......■.1■■■■■■■■■■■■!.■■:.......:■■■ ■■.........1■■■.........:............■■■ .........■■.1■■■■■■■■■■■�.■■■■..■....■■■ ��.■:■■■■■tl■■�■■■■■■■■t ■■■■■■■■■1i■■■■■ Agent or Applicant Printed Name Signature "Please read compliance statement on back of permit Application Fee(s) Check # Permit Officer's Signature �w„µ Issuing Date Expiration Date Local Planningf urisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Raleigh Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax:919-733-1495 Morehead City Headquarters 400 Commerce Ave Morehead City, NC 28557 252-808-2808/ 1-8884RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax:910-395-3964 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 06/09/06 A.WA NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Pwdue James N. Uregson Dea Freeman Governor Director Secretary BUFFER AUTHORIZATIO CERTIFICATE FOR PIER AND DOCKRiG FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposz;l, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those; regulations. rose activities covered by your Coastal Area Management Act (('AMA) permit have received Suffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the: party (contr&,tor) performing the construction Wor land clearing to a civil penalty of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall b(, taken to ensure the access way is made of dervious materials like open -slatted wood or composite, i,nulch, or grass tc meet the latent of the rules to the maximum extent p:actir;able. s. access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the conditions listed abcve and verify that all information provjJed is complete and accurate. Agent or Applicant Printed Name 4 A , �- -13 - er�t or App icarat Signature CAMA GENERAL PERMIT #:�- Washington Office 943 Washington Square Mail Washington, NC 27889 Phone 252-946-6481 Version 5, 0912009 Morehead City Office 400 Cominerce Avenue Morehead City, NC 28557 Phone 252-808-2808 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper NCDEN North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Dee Freeman Governor Directorr�rratanr BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 02.33. The Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical alternatives" determination per those regulations. Those activities covered by your Coastal Area Management Act (LAMA) permit have received Buffer Authorization as long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor !and clearing to a civil ;penalty of up to $25,000 ne{, day per vio!ation. �. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. 5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to this shoreline stabilization project must be restored vvith woody vegetation at a stem density of 320 stems per acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re- established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would remove understory vegetation is allowed. ® Pre -project site conditio 6. Project Drawing: The drawing on the LAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and ary associated clearing, grading, and construction] corridors. This drawing will be used to aid in compliance and monitoring efforts. By your signature below y�7u agree to be held responsible for meeting all of the above listed conditions and verify that all �fo ation is com to and accurate. R A5ent or Applicant P ' tee! Name Per ®flit- is 'gnature or Applicant Signatrare Issue [late C.AMA GENERAL PERMIT #: ✓ ( C Washington Office Morehead City Office 943 Washington Square Mall 400 Commerce Avenue One + Washington, NC 27889 Morehead City, NC 28557 �01'eil�2TO�lt� Phone 252-946-6481 Phone 252-808-2808 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper AaY M 171111 Version 5, 09/2009 ly 57026 LAMA / DR D FILL GENERAL E R M I T Previous permit # ONew ❑Modificati Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of No ' C olina, Department of Environment and Natural Resources d�; f - l / t` ' »�' and the Coastal Resources Comm•ssi n in an ar a of en ironmental concern pursuant � to 15A NCAC { Rules attached. Applicant Name 1� i % `�-' Project Location: County Address j ,f�'�! -'i J i Street Address/ State Road/ Lot #(s)jj City C� �ti State/6'G' ZIP Phone # (i) '16XFax #_jjC—) Subdivisiotn'� Authorized Agent? `�C7�a''9 r City J� { r y^✓1 ZIP CW P � rE4`PTA ,NjS ❑ PTS Phone # ( ) River Basin lulef-fj < Affected ElOEA 0 HHF AEC(s) : ❑ IH ❑ UBA ❑ N/A 1. Wtr. Body (nat maw n�/unkn) Ad ' � "'� � ❑ PWs: ❑FC: Closest Maj. Wtr. Body '�,)ei—ta•t ('2 ' k,°`' ,-, ORW: yes / no; PNA yes /rho; Crit.Hab. yes / no Type of Project/ Activity Ae )("vc ! _5 e x l_3 r fi/� 1 y ^,^-� L1 ��! �y'r (Scale: ) Pier (dock) engt i Platform(s) / Finger pier(s) A% Groin length number Bulkhead/ Riprap length avg distance offshore___ max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ oatlifCl Beach Bulldozing Other Shoreline Length , SAV: not sure yes no Sandbags: not sure yes n Moratorium: n/a yes n Photos: yes Lny% Waiver Attached: yes n INN INN ON N man OUREIN ORWAN 0 mom MEN E I ME mom ME ON iffim"Mm K NJ 01 NON am" ME IrAHMEME NESE 0 oil A building permit may be required Notes/ Special Conditions Agent or Applican tW&: �k -,)h')�,- ip 67,Lt PJCf"1 -Ze Please read compliance statement on back of permit* Application Fee(s) Check # ❑ See note on back regarding River Basin rules. Permit ce7,1 Signature l c���Z Issuing 15ate Expiration Date ev Local Planning jurisdiction Rover File Name -.j .- Applicant: Date: Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement found in your Habitat code sheet. Habitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or tern p impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or ternim acts FINAL Feet (Anticipated final disturbance. Excludes any restoration and/or temp impact amount W Dredge ❑ Fill ❑ Both ❑ OtheR. ✓ — r Dredge ❑ FUPE+ Both ❑ Other ❑ IT-6 T6 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ ..':`72-}?. 2 A..v'JS .. 1 •ij.jCOASi .. 9T:,i7': I...s,'C= ..+a o. 1:r.J._7.... .. .. f:' r; �'_Y,at w� A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary Date Name of Property Owner Applying for Permit: Mailing Address: r' 1 S 0 71 � I certify that I have authorized (agent)f l� to act on my behalf, for the purpose of applying for and obtaining all CAMA Permits necessary to install or construct (activity) )",I-A4E � /�$ �X -5! e6A 72aic; at (my property located at) This certification is valid thru (date) Signature Date 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastaimanagement.net An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper CERTIFIED MAIL - RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGEMENT ADJACENT RIPARIAN PROPERTY OWNER NOTiFICATION/WAIVER FORM i Name of individual applying for the permit: t `\Cher 1'1 Address of property: C 4 G I l,Ex+- e- k Xj i 1 —bf l (Lot or strcetk, ts[�e of mad) (City & county) I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to me (as shown on the attached drawingl the development they are proposing. A description or drawing, with dimen ions, should be provided with this letter. I have no objections to this proposal If you have objections to wh4t is being proposed, please write the Division of Coastal Management, 400 Commerce Ave., Morehead City, NC 28557 or call (252) 808 2808 within 10 days of receipt of the notice. No response is considered the same as no objection if you have been notified by Certified Mail. Waiver Section I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or sandbags must be set back a minimum distance of 15' From my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement I do not wish to waive the 15' setback requirement Signature ate Print Name inC Telephone number with area code FROM : FAX NO. : Nov. 18 2010 01:00PM P2 Nov 181011 24a Teresa Cahoon 252-249-8884 p,2 CERTDMD MAEL - RETURN RECEIPT REQUESTED DIVISION OF COASTAL MANAGENWNT ADJACENT RIPARrAN PROPERTY OWNER NOTMCATION/Wr MR FORM Name of individual 9ppiyiag for the permit: Address of property: rS F Yj1 I-- (Lo%ar0"0R, dN�l) s lie ern C, Z`d5(c>�, (City $ cowaRy) I hereby certify that I own property adjacent to the above referenced property- The individual applying for tkb permit has described to me (as shOWO OR the at-m&A drawing) the development they are proposing. A description or drawing, witb dimensions, should be provided Witt this IcKer- 1—I have no objections to this proposal ifyon bave objectioae to wl4t Is being prbporod, please write the Divisioxn at C.osstul MUUagcmcat, 400 Commerce Ave., Morehead City, NC 28557 or ealI (252) 809-2808 within 10 days of receipt of the inaiice. No response is considered tine same as uo objection if you have been aalitied by Certified XVIaiL Waiver Sermon I understand theta pier, dock, mooring piliags, Lweakwater, boathouse, lift or sandl ags must be set back a mis Imam distance of 1$' From my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requb ement I don wish to weivq the 15' setback requimuient E t Signature Prim Nome w ' r dA Telephone n her with area code Dale Planning & Inspections Department vaUrr!qP N 0 .0s VU — sawn S r � Xl"V Rt— , c r :)Ad -77Vpy (v-woaW 7NUT 4 jcx s;vo-jJ w "AIVIl r"IV iou-r 4--:i7%4 0 z x 0 LL N tV N A m o? m A a iJ BOBBY CAHOON MARINE CONSTRUCTION AND LAND DEVELOPMENT DBA BOBBY CAHOON CONSTRUCTION, INC. 6003 NEUSE RD. GRANTSBORO, NC 28529 PH (252) 249-1617 w PAY TO THE�� ORDER OF a 62 <: tviE Mf WACHOVIA BANK, NA APEX, NC 27502 66-021 /530 Ij'00 90 9 6u' i:0 5 3000 2 191: 20000 L 7 6B ►,8 281I' 9096 $ DOLLARS IV I