HomeMy WebLinkAbout56096_LINDTVEIT, HERBERT_20100726FJCAMA / ❑ DREDGE & FILL
GENERAL PERMIT
[]New ❑Modification ❑Complete Reissue ❑Partial Reissue
Previous permit #
Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources _
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
[] Rules attached
Applicant Name } a ,hat
11 FTt
Address t Oki r 1 y,
City o a C 4)oyi State , T ZIP
Phone # () Fax # ()
Authorized Agent , �.� �- C: �c G{. i c e Tif'x ,
--t
Affected ❑ CW ❑ EW ` 6 PTA ❑ ES A PTS
AEC(s): CI OEA ElHHF ElIH ❑ UBA ElN/A
C PWS: ❑FC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no
Type of Project/ Activity
Pier (dock) length_
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length ` it Pd
avg distance offshore
max distance offshore
Basin, channel
cubic yards_
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing_
Other
Shoreline Length
SAV: not sure yes io
Sandbags: not sure yes
Moratorium: n/a yes
Photos: yes
Waiver Attached: Yes no
Project Location: County
Street Address/Sttate Road/ Lot #(s)
it }}t } —7 {C t."1 i}jo .�-
Subdivision
City s,V� w r i� t zip 2SYJ4
Phone # (<.'52) 2 r — { Rivel- Basin
Adj. Wtr. Body h . �. A kr 6m , r- (nat aunkn
I
Closest Maj. Wtr. Body v12 .JP r
(Scale:
RE_ EIVED
MOfehepd City DdM
A building permit may be required by: o =. G. •�} 1 ] See note on back regarding River Basin rules.
Notes/ Special Conditions
ABen r Applicant Printed Name
Signa+pturef� ** Please read compliance statement on back of permit **
Application Fee(s) Check #
Permit Officer'�,ignature
Issuing ['Jute 1 Ex6iration Date
Local Planning,lurisdiction ; Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythatthis project is consistentwith the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
BOBBY CAHOON
di1NE CONSTRUCTION AND LAND DEVELOPMENT
DBA BOBBY CAHOON CONSTRUCTION, INC.
6003 NEUSE RD.
GRANTSBORO, NC 28529
PH (252) 249-1617
OF
NCDENR
WACHOVIA BANK, NA
BAYBORO, NC 28515
66-21/530
7/27/2010
**600.00
Hundred and
DOLLARS
NCDENR
400 Commerce Avenue
Morehead City, NC 28557
Lindlveit Job
110008 58 611' I:0 5 3000 2 L 9i: 20000 L 7 68 48 2811'
t
6003 Neuse Road
Grantsboro, NC 28529
Phone 252-249-1617*Fax 252-249-9884
Licensed and Fully Insured
NCGC License #62120
FaX
To: CAMA
Attn. Barry Guthrie
Fax: 247-3330
Re: Undtveit Project
0 urgent x for Review
From: Bobby Cahoon
Pages: 5{including cover}
Date: July 26, 2010
Time
❑ Please Comment a Please Reply ❑ Please Recycle
e CommentS: Please let us know that You received at 252-249-1617.
6'd uooyeO eseJej e£0: l l 0 � 9Z Inf
../�.r 1 NN 6 (�4NQ (- -'A-
0
0
HCDEHR
North Caroiina Department of Environment and Natural Resources
Division of Coastal Management
D'reetar warms, G. ROSS aF_, s
Michael F. Eadq. GovemO' James H. Gregson,
� / D
Date =------
Applicant Name
Mailing
Address
1 1- i � _L u�to act on my
I certify that I have authorized (agent) I LU }E Eiri ° n t
ur a of applying for and CAMA Permits necessary to
behalf, for the p pos d obtaining a + X d L .
install or construct (activitY)
i 3&C nL
at (location)
This certification ra da )
Signature
400 Commerce Avenue, Morehead City, North Carofina 28557
Phone: 252-808-2808 l FAX 252 247 01 lntemet www.necoashalmanagernent net
An Epd OAPaWni 1 Afflrn ue Action En*Yff - 50% Rwyded 110% PasE CasSWM Peper
£'d b886-6t7Z-ZSZ uooyeO eseaal eCo: � 6 0 � 9Z inr
CERTIFIED MAIL — RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN pROPERTy OWNER NOTIFICATIONlWAIVER
FORM
Name of individual applying for the permit: q
. I j
Address of property: tq, street or road}
(G� & county}
I hereby certify that I own property adjacent to the above referenced property. The
individual applying for this permit has described to me (as shown on the attached
drawing) the development they are proposing. A description or drawing, with
dimensions, should be Provided with this letter.
_,/_ I have no objections to this proposal
If you have objections to what is being proposed, please write the Division of Coastal
Management, 400 Commerce Ave., Morehead City, NC 28557 or call (252) 808-2808
within 10 days of receipt of the notice. No response
`, considered the same as no
objection if you have been notified by
waiver Section
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or
sandbags must be set back a will distance of 15' From my area of riparian
access unless waived by me. (If you wish to waive the setback, you must initial the
appropriate blank below.)
-1 du wish to waive the 15' setback requirement
../ I do not wish to waive the 15' setback requirement
D e
Signature ✓/ "
a�:fI ,e /�vaGz 21�av
Print Name
11t4o-(;z341 —
Telephone number with area code
tb'd 17886-617Z-Z9Z u00ye0 esaaal eti0: 6 L 0L 9Z Inf
CERTIFIED MAIL — RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTEnCATIONlWAWER
FORM
Name of individual applying for the permit: ``
Address of property:' (Lot ar street#, street of road)
(City & County)
that I own property adjacent to the above referenced property. The
I hereby certify
individual applying for Plus permit has described to me (as shown on attache
in
drawingdivide the development they are proposing. A description or drawing, w
dimensions, should be provided with this letter.
zI have no objections to this proposal
If you have objections to what is being proposed, please write the Division of Coastal
Manaagement, 400 Commerce Ave., Morehead City, NC is 28557
s tiered the same as0no 808
within 10 days of receipt of the notice. No response
objection if you have been notified by Certified Mail.
Waiver Section
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift or
arian
sandbags must be set back a minimam distance of 15' From myoarmu t inptial the
access unless waived by me_ (if you wish to waive the setback, y
appropriate blank below.)
I do wish to waive the 15' setback requirement
I do—AR-1 wish to waive the 15' setback requirement
-Jl tvto
Date
Signature
A. V 1 S0
Print Name
Telephone number with area code
9-d b886-6tZ-Z9Z uooyeo asaaal eto; � l 06 9Z Inf
NC, ivision of Coastal Mgt. Habitat Impact Computer Sheet
Applicant: Lindtveit
Date: 7/6/10
Permit #: 56096C
Describe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
found in your Habitat code sheet.
Habitat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount
High Ground
Dredge 0 Fill El Both ❑ Other 0
450
450
Shoreline
Dredge ❑ Fill I] Both ❑ Other ❑
45
45
Shallow Bottom
Dredge ❑ Fill ElBoth ElOther El
45
45
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised:02/03/10
NCDENR
morn Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue .James y. Gregscn Dee reeman
Governor Director Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed.
Pre -project site conditions: L Rw A
s. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline staNI;zation structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and ver' y that all
information is complete and accurate.
gent pplicant Printed Name Permit O is Signature
5A 110
tn r Applicant Signature l sgue at
lIi
CAMA GENERAL PERMIT #: Tr) C
-- hnor�?i1er7� <;ityy !��av"
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue One
Washington, NC 27889 Morehead City, NC 28557 NorthCarolina
Phone 252-946-6481 Phone 252-808-2808 %or y� /%
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper �/ Y ati all
Version 5, 09/2009
Beverly Eaves Perdue
Governor
NCDENR
North Carolina Deoartrnent of Environment and Natural Resources
Division of Coastal I,lanagement
,lames H. Gregscn
Director
Dee F reeT-i;an
Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar -Pamlico & Neuse River basins
per Division of Water Quality (DWQ) regulations 15A NCAC 02B.0259 & 0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Quality (DWQ) has reviewed your project
proposal, determined that the project as proposed complies with the aforementioned regulations, and made a "no practical
alternatives" determination per those regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization shall subject the property owner & the party (contractor) performing the construction Wor
land clearing to a civil penalty of up to $25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward) shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing & Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re -vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads) only; sites where wave overwash is
expected to be severe, the first ten (10) feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Site Restoration: At minimum, pre -project site conditions must be re-established. A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re -vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. Once re-
established, understory vegetation in Zone 1 is to be undisturbed and no mowing or any other activity that would
remove understory vegetation is allowed.
• Pre -project site conditions:
s. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
` —A �� RECEIVED
Age r Applicant rinted Name Permit Office Signature
'AUG 9 2010 10
Age'ritfir ApIlilicant Signature Morehead City DC sue Date
CAMA GENERAL PERMIT #: � 609 6 C
Washington Office Morehead City Office
943 Washington Square Mall 400 Commerce Avenue One
Washington, NC 27889 Morehead City, NC 28557 NorthCarolina
Phone 252-946-6481 Phone 252-808-2808 ���������
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Version 5, 0912009