Loading...
HomeMy WebLinkAbout11812_SQUATTERS CAMPSITES CO., INC._19930408�-�. -`-4ro"•�-rr•--.-ar.-•-e�G+µ3•-z,�,r.._��.q.m.--�---.....-�-,.--.5...-�.--':�-. .. ., _ .. _.�-_ __ _ CAMA AND DREDGE AN D ND FILL GENERAL " 11812 -� PERMIT as authorized by the State of North Carolina Department of Environment, Healt -and Natural Resources 41 $ Co stal Resources Commission i an are of e�vironmt jeon ri pu suant to 15 NCAC t i Applicant Name u ► `- f Phone Number .` Address City _ _'4 F\ Project Location State ty, State Road, Water Body, etc.) �a T Type of Project Activity t t, Zip PROJECT DESCRIPTION Pier (dock) length SKETCH ,j (SCALE: A� ) i r _ i i }--—� `—j—i- a Groin length — - s 7 number Bulkhead length C�C.f _...J2 I `I� ? it !hell Ll. qr06 y.._=. • .ems..--.....-�....... ..�.:.. ....-...-.��--.-.- i i I max. distance offshore) 1, F ` -5 ( ! • Basin, channel dimensions cubic yards i -��. i Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to be- come null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) this pro- ject is consistent with the local land use plan .and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. ' J applicant's signature permit officer's signature issuing date expiration date attachments ( % Nr A —71 / — 'UV V P In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal application fee > t/ Management Program. PAY i' TO THE ORDER OF FOR SQUATTERS CAMPSITES CO., INC. P. O. BOX 539 PH. 919-728-7923 BEAUFORT, NC 28512 CCritura Bank.' Morehead City, NC 28557 11400000 6 9 6I's 1:0 5 3 1008 501:0 28 2008 7 7 IV 696 A- -619 _ 66-85 /�/ 531 'i igs� DOLLARS ;! SQUATTERS CAMPSITE POST OFFICE BOX 248 SALTER PATH, N.C. 28575 (91.9) 247--3063 APRIL 6, 1993 FOR THE PURPOSE OF RECEIVING A PERMIT FROM C.A.M.A. ALLOWING SQUATTERS CAMPSITE TO REBUILD THE OCEAN FRONT SAND DUNE THAT WAS DAMAGED DURING A STORM ON APRIL 5 AND 6, 1.993. THE BELOW SIGNED PROPERTY OWNERS ACKNOWLEDGE THAT THEY HAVE NO OBJECTIONS TO THE ISSUING OF SAID PERMIT. SUMMER WINDS CONDOMINIUMS, INC. r-Aw"r"Mr-E W-4, IF wn-l—t -7 BRENDA BEAVER 91 NORTH CAROLINA DEPT. OF TRANSPORTATION JEABLANTON (CO: MAINTENANCE ENG.) g-/a-q. DATE DA E EHNR - COASTAL MANAGEMENT TI5A: 07H .1800 SECTION .1800 - GENERAL PERMIT TO ALLOW BEACH BULLDOZING LANDWARD OF THE MEAN HIGH WATER MARK IN THE OCEAN HAZARD AEC .1801 PURPOSE This permit will allow beach bulldozing needed to reconstruct or repair frontal and/or primary dune systems. For the purpose of this general permit, beach bulldozing is defined as the process of moving natural beach material from any point seaward of the first line of stable vegetation to repair damage to frontal and/or primary dunes caused by a major storm event. This general permit is being developed according to the procedures outlined in Subchapter 7J .1100 and will apply only to the Ocean Erodible AEC. This general permit shall not apply to the inlet Hazard AEC. History Note: Statutory Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1; Eff. December 1, 1987. .1802 APPROVAL PROCEDURES (a) The applicant must contact the Division of Coastal Management or local permit officer (LPO) and complete an application form requesting approval for development. The applicant shall provide information on site location, dimensions of the project area, and his name and address. (b) The applicant must provide: (1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners indicating that they have no objections to the proposed work; or (2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed work. Such notice should instruct adjacent property owners to provide any comments on the proposed development in writing for consideration by permitting officials to the Division of Coastal Management within ten days of receipt of the notice, and, indicate that no response will be interpreted as no objection. DCM staff will review all comments and determine, based on their relevance to the potential impacts of the proposed project, if the proposed project can be approved by a General Permit. If DCM staff finds that the comments are worthy of more in-depth review, the applicant will be notified that he must submit an application for a major development permit. (c) No work shall begin until an on -site meeting is held with the applicant and appropriate LPO or Division of Coastal Management representative so that the existing first line of stable natural vegetation can be appropriately marked and recorded on the application. Written authorization to proceed with the proposed development may be issued during this visit. All bulldozing must be completed within 30 days of the date of permit issuance or the general authorization expires. Histon• Note: Statutory Authority G. S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118. I; Ef. . Dece?nher 1, 1987; Amended Ef. January 1, 1990. .1803 PERMIT FEE The applicant must pay a permit fee of fifty dollars ($50.00) by check or money order payable to the Department. Hinor), Note: Statutory Authority G.S. 113-229(c)(1); 113A-107(a)(b); 113A-113(b); 113A-118.1; 113A-119; Eff. December 1, 1987; Amended Ef. . March 1, 1991. .1804 GENERAL CONDITIONS (a) Any future setback determinations which may be required shall be made using the first line of stable natural vegetation established prior to the bulldozing activity. (b) Individuals shall allow authorized representatives of the Department of Environment, Health, and Natural Resources to make periodic inspections at any time deemed necessary to ensure that the activity being NORTH CAROLINA ADMINISTRATIVE CODE 12111191 Page I EHNR - COASTAL MANAGEMENT T15A: 07H ."800 - performed under authority of this general permit is in accordance with the terms and conditions prescribed herein. (c) This general permit may be either modified, suspended, or revoked in whole or in part if the Department determines that such action would be in the best public interest. This general permit will not be applicable to proposed construction where the Department believes that authorization may be warranted but that the proposed activity might significantly affect the quality of the human environment or unnecessarily endanger adjoining properties. (d) This general permit will not be applicable to proposed construction when the Department determines after any necessary investigation that the proposed activity would adversely affect areas which possess historical, cultural, scenic, conservation or recreational values. If a shipwreck is unearthed, all work shall stop and both the Division of Archives and history and Coastal Management shall be contacted immediately. (e) The Department may on a case by case basis determine that the general permit shall not be applicable to a specific construction proposal. In those cases, individual permit application and review of the proposed project will be required according to 15A NCAC 7H. (f) This general permit does not convey any rights, either in real estate or material and does not authorize any injury to property or invasion of rights of others. (g) This permit does not eliminate the need to obtain any other required state, local or federal authorization. (h) Development carried out under this permit must be consistent with all local requirements, AEC guidelines, and local Land Use Plans current at the time of authorization. History Note: Statutory Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1; Ef. . December 1, 1987; Amended Ef. . May 1, 1990. .1805 SPECIFIC CONDITIONS (a) The area in which this activity is being performed must maintain a slope of adequate grade so as to not endanger the public or the public's use of the beach and should follow the pre -emergency slopes as closely as possible. The movement of material by a bulldozer, front-end loader, backhoe, scraper or any type of earth moving or construction equipment shall not exceed 1 foot in depth measured from the pre -activity surface elevation. (b) The activity must not exceed the lateral bounds of the applicant's property unless he has the written permission of the adjoining landowner(s). (c) Movement of material from seaward of the mean high water line is not authorized. (d) The activity must not significantly increase erosion on neighboring properties and must not have a significant adverse effect on important natural or cultural resources. (e) Adding to dunes shall be accomplished in such a manner that the damage to existing vegetation is minimized. The fill areas will be immediately replanted or temporarily stabilized until planting can be successfully completed. (f) In order to minimize adverse impacts to nesting sea turtles, no work shall occur within the period of May l through November 15 of any year. (g) If one contiguous acre or more of oceanfront property is to be excavated or filled, an erosion and sedimentation control plan must be filed with the Division of Land Resources, Land Quality Section, or appropriate local government having jurisdiction. This plan must be approved prior to commencing the land disturbing activity. History Note: Statutory Authority G.S. 113-229(cl); 113A-107(a)(b); 113A-113(b); 113A-118.1; Efj: December 1, 1987. NORTH CAROLINA ADAIINISTRATIVE CODE 12111191 Page 2