HomeMy WebLinkAbout50487_AMES, ROBERT_20080708i�❑ CAMA / ❑ DREDGE & FILL. .
GENERAL PERMIT
E]New ❑Modification [-]Complete Reissue El Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
Previous permit #
Date previous permit issued
Applicant Name '; i i k!! 1-4I i )f Project Location: County
Address _ i tt Street Address/ State Road/ Lot #(s)
City State (i + ZIP
Phone # ( ) - - ,' _ .mac-* (+ '" f `f ` � � Subdivision
Authorized Agent City
I] Rules attached.
ZIP
Affected ❑ CW ❑ EW ❑ PTA ❑ ES ❑ PTS Phone # ( ) River Basin
AEC(s): ❑ OEA ❑ HHF ❑ I,H ❑ UBA ❑ N/A Adj. Wtr. Body (nat /man /unkn)
❑ PWS: ❑ FC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no Closest Maj. Wtr. Body
M..
■■■■■■■■■■�//`�171■■■■■■MIN■■■■■■■�■i1■■■■■■■■
■■■■■■■■■f
cN
■■■iii■■®■��■■'"
7■■■■I■■■
■■i■■
�11r�■�i■■
■■■■nr�■■.■■.��a■■�u■■■
■■
■
MEMO■A■■
■■■■■■Pori■��■■■■■■.�■■■■■■■■■■■■■®■■
�■............■■..I��1J■..
■...■1MEN ■rNEE
- ■■■■■■■■■■■■■■■Ili■■■■■■■■■■■■■■■■■■■■
■■■:■■■■■■■■■■N::■■■■■■■■■■■■■■R-■■
Agent or Applicant Printed Name
Signature Please read compliance statement on back of permit
Application Fee(s) Check #
Permit Officer's Signature
Issuing Date Expiration Date
Local Planningjurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules
❑ Neuse River Basin Buffer Rules
❑ Other:
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office Morehead City Headquarters
Mailing Address: 400 Commerce Ave
1638 Mail Service Center Morehead City, NC 28557
Raleigh, NC 27699-1638 252-808-2808/ 1-888-4RCOAST
Location: Fax: 252-247-3330
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax: 919-733-1495
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
!
tao .
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
July 9, 2008
Rauna Fuller
2881 Peachtree Road, NE #1004
Atlanta, GA 30305
Re: Objection to the Issuance of CAMA General Permit No. 50487-A
for a Bulkhead Development Project, at 45722-45724 Rocky
Rollinson Road, Dare County
Dear Ms. Fuller:
This letter is in response to your objection as an adjacent riparian property owner to a permit
request from Robert Ames, for the construction of a bulkhead adjacent to a man-made basin in
Buxton, Dare County. Holley Snider, of the Division of Coastal Management staff, was recently
on site to evaluate the permit applicant's request.
The permit applicant has requested a permit to construct 50 feet of bulkhead adjacent to a man-
made canal. Under the Coastal Area Management Act (CAMA), the Coastal Resources
Commission (CRC) has established Rules for General Permits for this type of development that
are found in 15A NCAC 07H .l 100.
You have notified the Division of Coastal Management of your objections to this proposed
development by written letter. Your objections to this proposed development related to the
construction of a bulkhead adjacent to your property. The Division has reviewed your objections,
along with all aspects of this development proposal for consistency with the aforementioned
Rules, which describe the CRC's standards and guidelines for this type of development. Our
review of the proposed development has found it to be consistent with these Rules.
After reviewing the proposed development and conducting a site visit, the bulkhead alignment
was staked by Holley Snider, Field Representative on June 12, 2008. A special condition was
added to the permit allowing for the bulkhead to be constricted only within the lateral
boundaries of Mr. Ames property. The permit conditions do not authorize any formalized boat
slips within the basin.
After having given careful consideration to your objections to this proposed development, we
have determined that it is consistent with the Rules of the CRC and the State's Coastal
Management Program, and that all pre -requisites have been satisfied. Therefore, the Division of
Coastal Management issued General Permit No. 50487-A on July 9, 2008(copy attached) for the
proposed development.
1367 U.S. 17 South, Elizabeth City, North Carolina 27909
Phone: 252-264-3901 \ FAX: 252-264-3723 \ Internet: www.nccoastaimanagement.net
An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper
Rauna Fuller
July 9, 2008
Page 2
If you wish to appeal this permit decision, you must file a Third Party Hearing Request Form
with the Director of the Division of Coastal Management within 20 days of the permit issuance
date. If you choose to pursue an appeal, please contact this office so that we can provide you
with the appropriate forms and addresses.
If you have any further questions regarding this matter, please do not hesitate to contact Holley
Snider, or me, at this office.
Sincerely,
Frank A. Jennings, III
District Manager, Northeast District
FAR
cc: Holley Snider, Division of Coastal Management, Elizabeth City, NC
M. Ted Tyndall, Assistant Director, DCM, Morehead City, NC
Robert Ames, Hagerstown, MD
7;1A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
July 9, 2008
Maude Kaiser
11823 Woffington Court
Charlotte, NC 28273
Re: Objection to the Issuance of CAMA General Permit No. 50487-A
for a Bulkhead Development Project, at 45722-45724 Rocky
Rollinson Road, Dare County
Dear Ms. Kaiser:
This letter is in response to your objection to a permit request from Robert Ames, for the
construction of a bulkhead adjacent to a man-made basin in Buxton, Dare County. Holley
Snider, of the Division of Coastal Management staff, was recently on site to evaluate the permit
applicant's request.
The permit applicant has requested a permit to construct 50 feet of bulkhead adjacent to a man-
made canal. Under the Coastal Area Management Act (LAMA), the Coastal Resources
Commission (CRC) has established Rules for General Permits for this type of development that
are found in 15A NCAC 07H .1100.
You have notified the Division of Coastal Management of your objections to this proposed
development by written letter. Your objections to this proposed development related to the
construction of a bulkhead adjacent to your property. The Division has reviewed your objections,
along with all aspects of this development proposal for consistency with the aforementioned
Rules, which describe the CRC's standards and guidelines for this type of development. Our
review of the proposed development has found it to be consistent with these Rules.
After reviewing the proposed development and conducting a site visit, the bulkhead alignment
was staked by Holley Snider, Field Representative on June 12, 2008. A special condition was
added to the permit allowing for the bulkhead to be constructed only within the lateral
boundaries of Mr. Ames property. The permit conditions do not authorize any formalized boat
slips within the basin.
After having given careful consideration to your objections to this proposed development, we
have determined that it is consistent with the Rules of the CRC and the State's Coastal
Management Program, and that all pre -requisites have been satisfied. Therefore, the Division of
Coastal Management issued General Permit No. 50487-A on July 9, 2008(copy attached) for the
proposed development.
1367 U.S. 17 South, Elizabeth City, North Carolina 27909
Phone: 252-264-3901 \ FAX: 252-264-3723 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper
Maude Kaiser
July 9, 2009
Page 2
If you wish to appeal this permit decision, you must file a Third Party Hearing Request Form
with the Director of the Division of Coastal Management within 20 days of the permit issuance
date. If you choose to pursue an appeal, please contact this office so that we can provide you
with the appropriate forms and addresses.
If you have any further questions regarding this matter, please do not hesitate to contact Holley
Snider, or me, at this office.
Sincerely,
Frank A. Jennings, III
District Manager, Northeast District
FAR
cc: Holley Snider, Division of Coastal Management, Elizabeth City, NC
M. Ted Tyndall, Assistant Director, DCM, Morehead City, NC
Robert Ames, Hagerstown, MD
Ac
�N7A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
July 9, 2008
Courtney Whitehead
P.O. Box 25
Buxton, NC 27920
Re: Objection to the Issuance of CAMA General Permit No. 50487-A
for a Bulkhead Development Project, at 45722-45724 Rocky
Rollinson Road, Dare County
Dear Mr. Whitehead:
This letter is in response to your objection to a permit request from Robert Ames, for the
construction of a bulkhead adjacent to a man-made basin in Buxton, Dare County. Holley
Snider, of the Division of Coastal Management staff, was recently on site to evaluate the permit
applicant's request.
The permit applicant has requested a permit to construct 50 feet of bulkhead adjacent to a man-
made canal. Under the Coastal Area Management Act (CAMA), the Coastal Resources
Commission (CRC) has established Rules for General Permits for this type of development that
are found in 15A NCAC 07H .l 100.
You have notified the Division of Coastal Management of your objections to this proposed
development by written letter. Your objections to this proposed development related to the
construction of a bulkhead adjacent to your property. The Division has reviewed your objections,
along with all aspects of this development proposal for consistency with the aforementioned
Rules, which describe the CRC's standards and guidelines for this type of development. Our
review of the proposed development has found it to be consistent with these Rules.
After reviewing the proposed development and conducting a site visit, the bulkhead alignment
was staked by Holley Snider, Field Representative on June 12, 2008. A special condition was
added to the permit allowing for the bulkhead to be constructed only within the lateral
boundaries of Mr. Ames property. The permit conditions do not authorize any formalized boat
slips within the basin.
After having given careful consideration to your objections to this proposed development, we
have determined that it is consistent with the Rules of the CRC and the State's Coastal
Management Program, and that all pre -requisites have been satisfied. Therefore, the Division of
Coastal Management issued General Permit No. 50487-A on July 9, 2008(copy attached) for the
proposed development.
1367 U.S. 17 South, Elizabeth City, North Carolina 27909
Phone: 252-264-3901 \ FAX: 252-264-37231 Internet: www.nccoastalmanaaement.net
An Equal Opportunity \ Affirmative Action Employer — 50% Recycled \ 10% Post Consumer Paper
Courtney Whitehead
July 9, 2008
Page 2
If you wish to appeal this permit decision, you must file a Third Party Hearing Request Form
with the Director of the Division of Coastal Management within 20 days of the permit issuance
date. If you choose to pursue an appeal, please contact this office so that we can provide you
with the appropriate forms and addresses.
if you have any further questions regarding this matter, please do not hesitate to contact Holley
Snider, or me, at this office.
Sincerely,
Frank A. Jenninbs, III
District Manager, Northeast District
FAR
cc: Holley Snider, Division of Coastal Management, Elizabeth City, NC
M. Ted Tyndall, Assistant Director, DCM, Morehead City, NC
Robert Ames, Hagerstown, MD
A47i
NCDENR
North Carolina Department of Environment and Natural
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director
Carol W. Dillon
P.O. Box 428
Buxton, NC 27920
Resources
William G. Ross Jr., Secretary
July 9, 2008
Re: Objection to the Issuance of CAMA General Permit No. 50487-A
for a Bulkhead Development Project, at 45722-45724 Rocky
Dear Ms. Dillon: Rollinson Road, Dare County
This letter is in response to your objection to a permit request from Robert Ames, for the
construction of a bulkhead adjacent to a man-made basin in Buxton, Dare County. Holley
Snider, of the Division of Coastal Management staff, was recently on site to evaluate the permit
applicant's request.
The permit applicant has requested a permit to construct 50 feet of bulkhead adjacent to a man-
made canal. Under the Coastal Area Management Act (CAMA), the Coastal Resources
Commission (CRC) has established Rules for General Permits for this type of development that
are found in 15A NCAC 07H .1100.
You have notified the Division of Coastal Management of your objections to this proposed
development by written letter. Your objections to this proposed development related to the
construction of a bulkhead adjacent to your property. The Division has reviewed your objections,
along with all aspects of this development proposal for consistency with the aforementioned
Rules, which describe the CRC's standards and guidelines for this type of development. Our
review of the proposed development has found it to be consistent with these Rules.
After reviewing the proposed development and conducting a site visit, the bulkhead alignment
was staked by Holley Snider, Field Representative on June 12, 2008. A special condition was
added to the permit allowing for the bulkhead to be constructed only within the lateral
boundaries of Mr. Ames property. The permit conditions do not authorize any formalized boat
slips within the basin.
After having given careful consideration to your objections to this proposed development, we
have determined that it is consistent with the Rules of the CRC and the State's Coastal
Management Program, and that all pre -requisites have been satisfied. Therefore, the Division of
Coastal Management issued General Permit No. 50487-A on July 9, 2008(copy attached) for the
proposed development.
1367 U.S. 17 South, Elizabeth City, North Carolina 27909
Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoasta)management.net
An Equal Opportunity 1 Affirmative Action Employer— 50% Recycled 110% Post Consumer Paper
Carol Dillon
July 9, 2008
Page 2
If you wish to appeal this permit decision, you must file a Third Party Hearing Request Form
with the Director of the Division of Coastal Management within 20 days of the permit issuance
date. If you choose to pursue an appeal, please contact this office so that we can provide you
with the appropriate forms and addresses.
If you have any further questions regarding this matter, please do not hesitate to contact Holley
Snider, or me, at this office.
Sincerely,
Frank A. Jennings, III
District Manager, Northeast District
FAR
cc: Holley Snider, Division of Coastal Management, Elizabeth City, NC
M. Ted Tyndall, Assistant Director, DCM, Morehead City, NC
Robert Ames, Hagerstown, MD
' XCAMA / XDRtDGE & F LL
GENERAL PE IT Previous permit #
N(ew ❑Modification ❑Co pl a Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State cf North Carolin De rtment of Environment and Natural Resources and the Coastal Resources Commission in an' of environmental concern pursuant to 15A NCAC q 6J
IRules attached.
XP
w Project Location: County Y 6,
Street Address/ State Road/ Lot #(s) { ;�- /C� j ��'-. �4 :i
�``Jf 11 so - ii 1
ppF 9 Y 'j(- - u. ^d f l} "A:" 1 I _ \ ! �� �� `-1,..IL :'✓� t \ c I 1 � I ll I
Affected ❑ CW ❑ EW ❑ PTA )<ES ❑ PTS
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ USA ❑ N/A
❑ PWS: ❑ FC:
ORW: yes / no PNA yes
Type of Project/ Activity
Pier
Platf
Fing,
Groi
Bulk
Basil
Boat
Boat
Beac
Oth(
Shor
SAM
Sand
Mon
Phot
WaIN
Crit.Hab. yes ( no
K
Subdivision
city �`L)x1-6"'1 ZIP -- '--k0
Phone # -"Z(6 River Basin _ AS41()tell-r t�--
Adj. Wtr. Body Bas" n (nat�man, )unkn)
"
Closest Maj. Wtr. Body H�, YZ'� �-: f.. S r(A
L)u I Ll 1-mec
(Scale:
■■■■■■■■■■■■■fl■■■■■■■■■i■■■■!IfI.Y■■■■■■■■■
ar pier(s)
■■■■■■■■■■■■■�■■■■■■■■■■■■■ti►1■■■■■■■■■■i
■■■■t■■■■■■■■
■■■■■■■■■■■■■■■■i■■■■■■■■■
i length
■■■■i■■■■■■■■t'■■!!!i■■■■■■■i■■■■■■■i■■■■■i
number
ie
avg distance offshore
■■■■i■■��`■■�rl■■■■■■■■■■■■■■■■■■■■■■■■■■
max distance offshore
■■■■■�■It�i■■R
I/I■i1i�l.�`�■S.h2�;1�9��1,.��.■i191'�'i■■i■■■■■
■■■■■■cam■■�r��1oj■■■i■�w�±i�
■w■�■■■■■■■■■■
cubic yards
■■■■■
■■■■■rr■►�■■■■■w�!nr���■��■■�■■■a■■■■■
■■■■i■■■■t//!�!■■■■ESL+Jiiil■'aLSiL�U.11Lii■■■■■■■■■
ramp
-i Bulldozing
■■■■■■■■l/■■■i■■■■■■■■■i■■■■■■■■■■■■■■■■
■■■■■■■■■11■■■■■■■■i■■■i■■■■■■■■■■■t■■■■■
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■VLF!■■■■
dine Length Isoc
rMM
.L■■■■■■■■■■■■■■■■■■■■■■■■■■■■i■■F3fr■
Fags- not s yes no
■■■■:■
■■C:■�■■■■■■:C■■::■:■::■�
torlium. rn/., es) n
'
■
■■■■■■■■■■■■■iiiB�J■■■■■■■■■■■■■■■■■■■�■■
N
MOEN
ti.s `, {
A building permit may be required by: 1 Jck
Notes/ Special Conditions
1 �11�� ��►;ikl 'r,1r 1S 6`)C'4 i�(tl �i-7-01
GCjtY4- A iw s
XtNgeAp licant Printed Name
Please read comlS(iance statement on back ofOt
t **
O
Application Fee(s) Check #
❑ See note on back
!�} �1k�c
LJ_ , 1„, r,.�
ing River Basin rules.
�s J- '-}-I.0
� ��/YVICIiI (J I_)( .
4 too
IssuingNte Ex iratio Date
Ou I a
Ld6al Planning jurisdiction Rover File Name