Loading...
HomeMy WebLinkAbout36006_CARR, ED_2004012371CAMA 0 DREDGE& FILL tv GENERAL PERMIT Previous permit # ❑New ❑Modification ElComplete Reissue LIPartial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name C'-'- ' , t'- - �- Project Location: County .Rules attached. Address CityState ZIP Phone # O Fax # V-1 Authorized Agent j4::M 2 � 2. 2 Affected P CW PEW P PTA El ES EJ PTS AEC(s): El OEA El HHF El 1H El UBA E:1 N/A 1_ PWS: El FC: ORW: yes / no PNA yes / no Crit. Hab. yes /,no, Street Address/ State Road/ Lot #(s) : Subdivision City— ZIP Phone# (—) River Basin Adj. Wtr. Body (nat /man /unkn Closest Maj. Wtr. Body Type of Project/ Activity (Scale: Pier (dock) length Platform(s) 7 V I T-, Finger pier(s) Groin Bulkh Basin, length — number J /pap length Nv I'!;7 �71 avg-distance offshore I, max/ ax distance offshore channel cubic yards Boat Boath Beac Othe Shore SAramp 7_1 ouse/ Boatlift "A h Bulldozing 7-C 01 r A 1111 IV__AA_LA ­5T line Length "441 f, If V1 I M Sandb not sure yes no 1_9 0-k I) ags: not sure yes no 4- � --- i . 4 I — I Moratorium: n/a yes no Photos: yE�s, no Waiver Attached: yes 'no.' A building permit may be required by: El See note on back regarding River Basin rules. Notes/ Special Conditions A Agent or Applicant Printed Name Permit Officer's Signature Signature please read compliance statement on back of permit Issuing Date Expiration Date Application Fee(s) Check # Local Plan ningJ urisd iction Rover File Nam ei Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythat this project is consistentwith the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar- Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Elizabeth City District Mailing Address: 1367 U.S. 17 South 1638 Mail Service Center Elizabeth City, NC 27909 Raleigh, NC 27699-1638 252-264-3901 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888-4RCOAST Fax: 919-733-1495 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-B Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax: 910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) www.nccoastalmanagement.net Revised 10/05/01 f, NCDENR North Carolina Department of Environment and Natural Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Acting Director Ms. Deanna Beacham Ms. Martha Pulley 3224 Patterson Ave. Richmond, VA 23221 jAN 2 6 • Resources William G. Ross Jr., Secretary January 22, 2004 Re: Objection to the Issuance of General Permit 15 A, NCAC 07H.1100 And 07H.1200, Ed Carr, 1442 Duck Road, Dare County Dear Ms. Beacham and Ms. Pulley: Your December 11, 2003, response as an adjacent riparian property owner objected to a permit request from Ed Carr of 1442 Duck Road, Duck, Dare County. He seeks a permit to construct a bulkhead as shoreline stabilization, and pier structures along the shoreline of his property on the Currituck Sound. Dennis W. Hawthorn of the Division of Coastal Management staff was recently onsite and has staked a bulkhead alignment that is directly adjacent to the existing erosion escarpment that will not result in any fill of any wetland areas, or the waters of the Currituck Sound. Mr. Hawthorn noted that this bulkhead structure will extend north to south along the shoreline for a distance of approximately 116 feet. The proposed pier walkway will extend from high ground on Mr. Carr's property 50 feet into the Currituck Sound. The pier will include a 10 feet long by 12 feet wide platform at the end, with a boat lift on the north side of the platform. Mr. Hawthorn reviewed all aspects of this proposal for consistency with 15A NCAC, Subchapters 07H.1100 and 07H.1200. These are the rules that apply to the placement and construction of the proposed bulkhead and pier. Mr. Hawthorn has reviewed your objection noting that you need much more information. This review has found that the drawing attached to the notification form provided all of the needed information to determine that the proposed development is consistent with NCAC Subchapter Sections 07H .1100 and 07H.1200. Having given your objections to this proposal careful consideration, I have determined that the proposed project is consistent with the appropriate rules and regulations and that all pre -requisite requirements have been satisfied. The Division intends to issue General Permit #A36006 (copy attached) for the proposed development on January 23, 2004. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer — 30% Recycled by Fiber Weight Ms. Deanna Beacham Ms. Martha Pulley January 22, 2004 Page 2 If you wish to appeal this permit decision, you must file a request with the Director of the Division of Coastal Management, Department of Environment and Natural Resources, within 20 days of the permit issuance date. If you have any questions regarding this matter, please do not hesitate to contact Mr. Dennis Hawthorn or me at (252) 264-3901. Sincerely, ed Sao son District Manager TS:yc cc: Dennis W. Hawthorn, Division of Coastal Management Charles S. Jones, Assistant Director, Division of Coastal Management Ed Carr, 780 Eden Road, Lancaster, PA 17601 Bill Jones, Northeastern Marine, P.O. Box 42, Kitty Hawk, NC 27949 A� NCDENR North Carolina Department of Environment and Natural Division of Coastal Management Michael F. Easley, Govemor Charles S. Jones, Acting Director Ms. Julia P. Lee c/o Paul Shaver and John Lancaster Employee Trusts 1 Cypress Knee Trail Kitty Hawk, NC 27949 Dear Ms. Lee: i f El f Resources William G. Ross Jr., Secretary January 22, 2004 'JAN 2 6 2004 Re: Objection to the Issuance of General Permit 15 A, NCAC .1100 to Ed Carr, 1442 Duck Road, Dare County Your December 16, 2003, correspondence objected to a permit request from Ed Carr of 1442 Duck Road, Duck, Dare County, to construct a bulkhead as shoreline stabilization along the shoreline of his property on the Currituck Sound. Dennis W. Hawthorn of the Division of Coastal Management staff was recently onsite and has staked a bulkhead alignment that is directly adjacent to the existing erosion escarpment that will not result in any fill of any wetland areas, or the waters of the Currituck Sound. Mr. Hawthorn noted the proposed pier walkway will extend from high ground on Mr. Carr's property 50 feet into the Currituck Sound. The pier will include a 10 feet long by 12 feet wide platform at the end, with a boat lift on the north side of the platform. Mr. Hawthorn noted that this bulkhead structure will be aligned north to south along the shoreline for a distance of approximately 116 feet. Although you have indicated concern regarding the use of bulkhead return walls, typically this technique of construction is standard for bulkhead construction, and is consistent with our rules concerning bulkhead construction so long as the structures will be located entirely on the permittee's property. We have also noted that you have suggested the use of riprap rock in the 15 feet setback area. It is my understanding that Mr. Hawthorn recently spoke with Mr. Carr about the possible use of this material in some fashion to reduce any increased erosion potential on the neighboring property shorelines. Mr. Carr indicated during this conversation that he wished to be a good neighbor, and that he may pursue the use of riprap rock material at a later time through an additional permit. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper Ms. Julia P. Lee January 22, 2004 Page 2 Mr. Hawthorn reviewed all aspects of this proposal for consistency with 15A NCAC 07H .1100 and 07H.1200. These are the rules that apply to the placement and construction of the proposed bulkhead and pier. Mr. Hawthorn has reviewed your letter stating your concerns and objection to Mr. Carr's proposal. This review has found the proposed development to be consistent with the referenced rules. Having given your objections to this proposal careful consideration, I have determined that the proposed project is consistent with the appropriate rules and regulations and that all pre -requisite requirements have been satisfied. In this regard, the Division intends to issue General Permit #A36006 (copy attached) for the proposed development on January 23, 2004. If you wish to appeal this permit decision, you must file a request with the Director of the Division of Coastal Management, Department of Environment and Natural Resources, within 20 days of the permit issuance date. If you have any questions regarding this matter, please do not hesitate to contact Mr. Dennis Hawthorn or me at (252) 264-3901. Sincerely, /Ted Sa son District Manager TS:yc cc: Dennis W. Hawthorn, Division of Coastal Management Charles S. Jones, Assistant Director, Division of Coastal Management Ed Carr, 780 Eden Road, Lancaster, PA 17601 Bill Jones, Northeastern Marine, P. O. Box 42, Kitty Hawk, NC 27949