Loading...
HomeMy WebLinkAbout44266_PIERCE, JAMES_20060213F CAMA / ❑ DRE J GE„& FILL GENERAL PERMIT Previous permit # LINew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued: As authorized by the State of North Carolina, Department of Environment and Natural Resources 1 and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Rules attached. i Applicant Name Project Location: County l Address / < t r , �Street Address/ State Road/ Lot #(s) City ate tit' ZIP , 1 K` t i L�- Phone # 2,)'JFax # Authorized Agent Affected -1 CW ❑i EW O PTA ❑ ES ❑ PTS AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A CI PWS: ❑ FC: ORW: yes / no PNA yes / no Crit. Hab. yes / no Type of Project/ Activity Pier (dock) length Platform(s) _ Finger pier(s) Groin length number Bulkhead/ Riprap length___ avg distance offshore max distance offshore _ Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Shoreline Length SAM not sure yes no Sandbags: not sure yes krto Moratorium: n/a yes �ho Photos: yes no Waiver Attached: yes no A building permit may be required by: Notes/ Special Conditions or i 1 •- Signature Please read compliance statement on back of permit Application Fee(s) : Check # Subdivision _T-- -� ! City - ZIP Phone # ( ) River Basin Adj. Wtr. Body (nat /man /unkn) r� Closest Maj. Wtr. Body (Scale: ) See note on back regarding River Basin rules. Permit Offfegr's�Signature / Issuing Date AxpiritionDate I Local Plan gjurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-796-7215) for more information on how to comply with these buffer rules. Division of Coastal Management Offices Central Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 Fax: 919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 400 Commerce Ave Morehead City, NC 28557 202-808-2808/ 1-888-4RCOAST Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-796-7215 Fax: 910-395-3964 (Serves: Brunswick, New Hanover, Orslow -below New River Inlet- and Pender Counties) Revised 06/29/05 &ACA.W / ❑ DREDGE. & FILL NY 4 4 2 6 6< !rN ERAL PERMIT Previous permit # evw ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources —� // and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC �l J C/ T-5],Rules attached. Applicant Name Project Location: CountyC�� Address / 1 S- /h/nrr6, 1' 0 Street Address/ State Road/ Lot #(s) City ✓ State_ ZIP pZ %�� _ �d''►f'�� Ivi' /✓/ Phone # (�) 233 �jax # ( ) Subdivision Authorized Agent Affected &tV w JVTA ❑ ES ❑ PTS AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ❑FC: ORW: ( yes) no PNA Type of Project/ Activity _ Pier (dock) length Platform(s) Finger pier(s) Groin length number Bulkhead/ Riprap length avg distance offshore max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other Crit. Hab. yes / no City _.� .y -- ZIP. Phone # ( ) Ri er Basin Adj. Wtr. Body � Tv"t �`/( at)/man Junkn Closest Maj. Wtr. Body U t� (Scale: / 7S -77 — — — i i -- - L 1 T _ 1 i ' l I L__ � 4- y I i I I II ti Shoreline Length l r I i SAV: not sure yes Sandbags: not sure yes __ __ � _.l.- — — --j -- --• -{ —t- —— Moratorium: n/a yes- i Photos: yes 16b Waiver Attached: yes o ed b A building permit may be requir y Notes/ Special Conditions or Applicant Printed Name Signature *'* Please read compliance statement on back of permit 4-) Application Fee(s) Check # See note on back regarding River Basin rules. Permit O(jipEr's Signature z�3d� 16U Issuing Date _ _ xpi ion Date Local Rover File Name NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director. William G. Ross Jr., Secretary February 13, 2006 James Pierce 115 Summerview Lane Cary, NC 27511 Dear Mr. Pierce: Attached is General Permit #44266C- this permit authorizes the reconstruction of dock in its original footprint at 2514 Emerald Drive, Emerald Isle, NC. In order to validate this permit, please sign the permit as indicated. Retain the white copy for your files and return the signed yellow and pink copies to us in the enclosed, self-addressed envelope. If the signed permit copies are not returned to this office before the initiation of development, you will be working without authorization and will be subject to a Notice of Violation and subsequent civil penalties. We appreciate your early attention to this matter. Sincerely, Ryan Davenport Coastal Management Representative lsb Enclosures 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper IT -Ism. 17 February 9, 2006 PECS, FEB 1 0 2006 za Mr. Davenport: Morphs I spoke to you yesterday in regards to rebuilding our dock which was damaged by ad City DG,M Hurricane Ophelia. At that time you said that if the pylons and most of the stringers were still in place a CAMA permit would not be necessary. All our pylons remain, but after speaking with my husband, I realize that what I thought were stringers were actually crossbraces between the pylons. So, I am enclosing two photos showing the damaged dock. Our house is located at 2514 Emerald Drive in Emerald Isle. If you deem necessary, we are requesting issuance of a permit to repair our dock. Please notify us if any additional information is required. Thank you for your help. Sincerely, Pat Pierce Mailing address: Mr. James B. Pierce 115 Summerview Lane Cary, NC 27511 Phone: 919-233-8788 E-Mail: jpbcarvCc�hotmaiLcom