HomeMy WebLinkAbout44727_MCLEOD, B.F._20060320FROM B F tIcLEODJR FAX NO. : 919 552 4826 Jul. 14 2006 08:53PM P1
N® 4472
CAMA / i Dn EDGE & FILL
GENERAL PERMIT Previous permit#
ew I 'Modification � (Complete Reissue iPartial Reissue Date previous permit issued,
As authorized by the State of North Carolina, Department of Environment and Natural Resources 7 0 d U
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
_ ( j leo /fides attached. i �' L:lITY Project Location: County
Applicant Name .. ----. _ ... -
Address_ _ (---1.�--.. Street Address/ State fad/ Lot #(s)
city _.. — :.. _. - — State Z!P
��y (S`7(y 'jzt� � #—) Subdivision—..
Phone # { - - —
Authorized Agent _. )hie /���,t t City--- ZIP_' S�
L--�-CW ❑bW UPTA i nPTS Phone # (--).. _,.. River Basin_.." ._
Affected y
AEC(s): I-!HHF IN ❑tf6A wa Adj.Wtr.Body_. U fO�+� n,!> +
Ll PW&. rJFC: U� L Uc�ry�f
Closest Ma;.- Wtr. Body — ..
ORW: no PHA -yes & t rit. blab.: yes / no
Type of `V A460ky
Pier (dock) With _
Rnger piers)—__ _
Groin length
number
lkhe pop WnEf__a' W "—
avg d3ance effshore—
max distance offshore
Basin, ShinnCi ..... .._ —
Cubic yards—_. .._
Boat ramp._
Boattporae/ Boatlift__
Bead, sutldo:ingodw_`__.
... ---
Sherd"me 1 �tgffi
SAV: not sure "s
Sandbags: not sure yes
Moratorium; n/a yu Inof
photos. yes
waiver Amched: yes
A building permit may be required by- { --
Nates/ Special Conditions ��F«
0 "&l r—
sou tore *0 read comglian a statemem on back of permit"
(Scale:
(3LA
All1JUL g 4
cene��a-eit�ac�►'
see now
back regarding River Basin rules.
❑CAPIIA /� =I DREDGE & FILL
GENERAL PERMIT
❑New El Modification ❑Complete Reissue ❑Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC
Previous permit #
Date previous permit issued.
Applicant Name l P('G. Project Location: County _
Address '(() fl !�,'. �,t + '�" , t Street Address/ State Road/ Lot #(s)
City ,/ .I State ZIP . y?''% !� r r r./ra J, % J✓/
Phone # Fax # O
Subdivision
Authorized Agent f
G, l - i�/ :. f ,
City
ZIP `s b� �� \
-- _
i -
❑ CW _ EW
❑ PTA �J& ❑ PTS
Phone # ( )
River Basin
Affected
AEC(s): ❑ OEA ;_ HHF
❑ IH ❑ UBA ❑ N/A
Adj. Wtr. Body
�" 1 J'. 14 r (Cda' /man /unkn)
❑ PWS:
❑FC:
ORW: yes / no PNA
yes / no Crit. Hab. yes / no
Closest Maj. Wtr. Body
Type of Project/ Activity
Pier (dock) length
Platform(s)
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length L�
avg distance offshore
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
Shoreline Length / u J
SAV: not sure yes ng
Sandbags: not sure yes no
Moratorium: n/a yes n
Photos: yes no'
Waiver Attached: yes no
A building permit may be required by: ✓ !'
Notes/ Special Conditions
(Scale: )
❑ See note on back regarding River Basin rules.
1
IA AV r' nnnr
P . //i' U501001(, S [vim I 1 J LUUU / / `.
Agent or Applicant Printed Name / Permit Officer's Signature J
Morehead City DCM
Signature Please read compliance statement on back of permit Issuing Date Expiration Date
Application Fee(s) Check # Local Planningjurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar - Pamlico River Basin Buffer Rules 0 Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District
Mailing Address: 1367 U.S. 17 South
1638 Mail Service Center Elizabeth City, NC 27909
Raleigh, NC 27699-1638 252-264-3901
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax: 919-733-1495
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
400 Commerce Ave
Morehead City, NC 28557
202-808-2808/ 1-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax: 910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 06/29/05
t
SECTION .1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS AND THE PLACEMENT
OF RIPRAP FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS AND
OCEAN HAZARD AREAS
15A NCAC 07H .1101 PURPOSE
A permit under this Section shall allow the construction of bulkheads and the placement of riprap for shoreline protection in
the public trust waters and estuarine waters AECs according to authority provided in Subchapter 07J .1100 and according to
the Rules in this Section. This permit shall not apply to shoreline protection along the oceanfront or to waters and shorelines
adjacent to the Ocean Hazard AEC with the exception ofthose shorelines that feature characteristics ofthe Estuarine Shoreline
AEC. Such features include the presence of wetland vegetation, lower wave energy and lower erosion rates than the adjoining
Ocean Erodible Area.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A;118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. April 1, 2003.
15A NCAC 07H .1102 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for
development. The applicant shall provide information on site location, dimensions of the project area, and his name and
address.
(b) The applicant must provide:
(I) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice should instruct adjacent property owners to provide any comments on the proposed development
in writing for consideration by permitting officials to the Division of Coastal Management within ten days of receipt
of the notice, and, indicate that no response will be interpreted as no objection. DCM staff will review all comments
and determine, based on their relevance to the potential impacts of the proposed project, if the proposed project can
be approved by a General Permit. If DCM staff finds that the comments are worthy of more in-depth review, the
applicant will be notified that he must submit an application for a major development permit.
(c) No work shall begin until an on -site meeting is held with the applicant and appropriate Division of Coastal Management
representative so that the proposed bulkhead alignment can be appropriately marked. Written authorization to proceed with
the proposed development may be issued during this visit. Construction of the bulkhead or riprap structure must begin within
90 days of this visit or the general authorization expires and it will be necessary to re-examine the alignment to determine ifthe
general authorization can be reissued.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. January 1, 1990; December 1, 1987.
15A NCAC 07H .1103 PERMIT FEE
The applicant must pay a permit fee of one hundred dollars ($100.00) by check or money order payable to the Department.
History Note: Authority G.S. 113A-107, 113A-113(b); 113A-118.1; 113A-119; 113-119.1; 113A-124,
Eff. March 1, 1984;
Amended Eff. August 1, 2000; March 1, 1991.
15A NCAC 07H .1104 GENERAL CONDITIONS
(a) This permit authorizes only the construction of bulkheads and the placement of riprap conforming to the standards herein.
(b) Individuals shall allow authorized representatives of the Department of Environment, Health, and Natural Resources to
make periodic inspections at any time deemed necessary in order to be sure that the activity being performed under authority of
this general permit is in accordance with the terms and conditions prescribed herein.
43
(c) There shall be no significant interference with navigation or use of the waters by the public by the existence of the
bulkhead or the riprap 4uthorized herein.
(d) This permit will not be applicable to proposed construction where the Department has determined, based on an initial
review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are unresolved
questions concerning the proposed activity's impact on adjoining properties or on water quality; air quality; coastal wetlands;
cultural or historic sites; wildlife; fisheries resources; or public trust rights.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(f) Development carried out under this permit must be consistent with all local requirements, AEC rules, and local land use
plans current at the time of authorization.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. May 1, 1990; December 1, 1987;
RRC Objection due to ambiguity Eff. May 19, 1994;
Amended Eff. August], 1998; July 1, 1994.
15A NCAC 07H .1.105 SPECIFIC CONDITIONS
(a) This general permit is applicable only along shorelines void of wetland vegetation including marsh grass and wooded
swamp, or where all construction is to be accomplished landward of such vegetation.
(b) Bulkheads and riprap material shall be positioned as follows:
(1) Bulkheads shall be positioned so as not to exceed more than an average distance of 2 feet waterward of the
normal high water mark, or the normal water level contour, whichever is applicable. In no case shall the bulkhead be
positioned more than 5 feet waterward of the normal high water or normal water level contour at any point along its
alignment.
(2) Riprap shall be positioned so as not to exceed a maximum of 5 feet waterward of the mean high water mark or
normal water level contour at any point along its alignment. Where there is an existing bulkhead structure, riprap
shall be allowed to extend a maximum of 10 feet offshore. This location standard shall take into consideration the
height of the area to be protected (i.e. bulkhead height, water depth) and the alignment shall allow for a slope no
flatter than 2 feet horizontal per 1 foot vertical and no steeper than 1'/2 feet horizontal per 1 foot vertical.
(c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap material must be positioned so as not to
exceed more than an average distance of 5 feet waterward of the normal high water mark or the normal water level contour,
whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 feet waterward of the normal high
water or normal water level contour at any point along its alignment. For the purpose of these Rules, the Atlantic Intracoastal
Waterway (AIWW) is considered a natural shoreline and development shall occur as described in 7H A 105(b).
(d) Construction authorized by this general permit shall be limited to a maximum shoreline length of 500 feet.
(e) All backfill material shall be obtained from an upland source.
(f) The bulkhead shall be constructed, or the riprap shall be in place prior to any backfilling activities.
(g) The bulkhead or riprap shall be structurally tight so as to prevent seepage of backfill materials through the structure.
(h) Riprap material shall be free from loose dirt or any other pollutant. It shall be of a size sufficient to prevent its movement
from the site by wave or current action.
(i) Riprap material shall consist of clean rock or masonry materials such as but not limited to granite or broken concrete.
Materials such as tires, car bodies, scrap metal, paper products, tree limbs, wood debris, organic material or similar material,
are not considered riprap.
0) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials
approved by department personnel. No excavation is permitted except for that which may be required for the construction of
the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved
alignment.
(k) Bulkheads or riprap shall not extend beyond established alignments nor restrict the original width of the canal or basin.
(1) If one contiguous acre or more of property is to be excavated or filled, an erosion and sedimentation control plan shall be
filed with the Division of Land Resources, Land Quality Section, or appropriate local government having jurisdiction. This
plan shall be approved prior to commencing the land -disturbing activity.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. April 1, 2005; December 1, 1991; January 1, 1989; December 1, 1987.
44
00
20A SMCZ*4� 02011CO
I hereby certify that I own property adjacent to 6,y, �\C-t—Q0 t (• -s
(Name of Property Owner)
property located at
(Lot, Block, Road, etc.)
Af
�sr' n
on ��Ov.r� , in ���`�l �r(�n\, \ S , N C.
'OVaterbody) (Town and/or County) �11106
He has described to me as shown below, the development he is proposing at that locatiop
and, I have no objections to his proposal. .�-Q �w �� (b
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(To be filled in by individual proposing development)
�w
tu44
4�-N
Tow^ pF E-Aergtd `SIC
P914 t— The Town of Emerald Isle
uive,
Emerald Isle, North Carolina 28594
pAIP, , D31oc,/0�,
F
& P,
Print or Type Name
a 7 - i 6 :� 6�
Telephone Number
Date: /6/ 2- 5
tI
Shoreline Piers and
�p 61
P NC 28584`yO
oatl�fts Inc 601 Peletier Loop Road Unit D24 Swansboro,
Floating Docks - Piers - Sea Walls - BoatIifts by Hi -Tide Gear Drive V'/1,
FAX/OFFICE (252) 393 7934
MOBILE (252) 646 3212
N C.D:E.N.R.
Division of Coastal Management
Morehead City, NC 28557
owner of the property located
at ,NQ1LQ�4`Q\, �hereby authorize, Ashley Brooks of Shoreline
Marine Construction, to act as my agent in obtaining all CAMA and local building permits
required to construct and install my pier, boat lift and/or seawall._
Thank You,
Owner Signature
Date 2 N Ob
SHORELINE MARINE CONST.
ASHLEY BROOKS NCDL 7666496
PH (252)-646-3212
601 PELETIER LOOP ROAD D24
SWANSBORO, NC 28584
PAY I /
TO THE
ORDER OF [�
28012340
66-21/530
BRANCH 77614
DATE
wacxovaA /'��
Wachovia Bank, N.A.
wachoNa.com Tr�I 616161
FOR 0%/,VYG l __�. - - — - -- - yr
ILO 1234011' 1:053000 2 L91: 20546? 0 255? i'