Loading...
HomeMy WebLinkAbout32039_SEAGATE ASSOCIATION, INC_20020611l Vi/ CAMA / ❑ DREDGE & FILL 32039 GENERAL PERMIT Previous permit # 6inNew ❑Modification []Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC Applicant Name SFo &A Tf A S S C('A T (. N /I��• Address 7il 0 T-r n R CiState �Ji ZIP 2'�- S-f 0 Phone # O , , ��'� /, Fax # ( ) Authorized Agent Ar r 'el Affected ❑ CW ll EW XPTA ?9 ES P�PTS AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A F PWS: ❑FC: ORW: yes / no PNA yes / Crit. Hab. yes / no Type of Project/ Activity _1 ri '( C r Pier (dock) length Platform(s)_ Finger pier(s) Groin length number Bulkhead/ Riprap length 1 C, avg distance offshore max distance offshore Basin, channel cubic yards �` u Boat ramp _ Boathouse/ Boatlift 1 V Beach Bulldozing Other Project Location: County (Gi lIrI ; +<' Street Address/ State Road/ Lot #(s) Subdivision ,• ; ,rz City /V`iw a ZIP ZfS?o Phone # () River Basin✓�� Adj. Wtr. Body IN k at man /unkn Closest Maj. Wtr. Body J r e (ar f►afN¢ rJ i� rr ti 11 %rY� rFs mall (Scale: N rNC ) — 7---1- I � _ t� Shoreline LengthI /JIl} M SAV: not sure yes Sandbags: not sure yes Moratorium: n/a yes P-47IN fit - 1 Photos: no Y i Waiver Attached: yes A building permit maybe required by: iu r Jr i < i { v vt ❑ See note on back regarding River Basin rules. Notes/ Special Conditions Y 16A 11Nd i(1 ,,I me J rid'd 41-*. 1 j�Ii(,du: j tl; io. V'10tf 1kt rEu lJt+'1l4 c IV, Ivt l f� Agent or Applicant Printed Name Signature Please read compliance statement on back of permit �I CC.04 Application Fee(s) Check # Permit Officer's Signature Issuing Date Expiration Date Local Planning Jurisdiction Rover File Name io�l Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to complywith thesebuffer rules. Division of Coastal Management Offices Central Office Mailing Address: 1638 Mail Service Center Raleigh, NC 27699-1638 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888ARCOAST Fax:919-733-1495 Elizabeth City District 1367 U.S. 17 South Elizabeth City, NC 27909 252-264-3901 Fax:252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-B Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax:910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised 10/05/01 L.._. POSTAL STATES POSTAL MONEY ORDER 15 0 �POST/JL SERVICEc� POSTAL ►—� 000 is.`a�.od�eSvi��uca��a��a��:.u,., ,- ,,: ; .. ., ., .• : • ,,.� . � ,.,5>sar»u;,,:•rr��a�.•�eaycc�ti 90289276482 0aM:1, ! 28a' r•o0 * 100* 0 0 SERIAL NUMBER YEAR MONTH DAV POST OFFICE - -" U.S.DOLLARSAND CENTS CHECKWRITER ► PAY TO IMPRINT AREA ADDRESS FRO. Cry} // /• �t�. USED FOR OCT/�" . , LT 1. d f�l/T� ily� 1M 7 AIVU 1�iIC JLY IN-TAE..U.S. AND POSSESSIONS 1:00000800 21: 90 289 37648 2111 44 ADJACE-N'.*O'.RYLPARLAN pRo PERTY OWNER epl� I herf-by certify that I own property adjacent to 5614 6ZA7'F h6zCJ,*71"6 - �111)s of Property Owner) property lcy-atedat 5eA _ ;r 5::� &JAJ e)14 2, (Lot, Block, Road, etc.) on ro N c L (Town and4c Criuuty) -P ',- 13,; s riPzt-r;'hF-A 1. 11 1J - - me— shown. below, the deveIopni,.,,,f. b-, Oy,r+ I k4vtsmo 0hjierAions to his proposal. ,r,T,, - " - —�-TJMON AND/OR DRAW)f.dG OFPRr)'7 h:'',_" (To he filled in by i7z di P i a va 1 p 2% P-1 7, ce 'S i gn a - F R C T73',L' Print cr Type Name 7Z,3 - - 57 73 Te' leahone Number Date: - L19, - 0 � 7.?o S64 7t -4� 4,PT / 6- 5q K S+t �'�„"'�- Y" ,,.3�'�y"arn.'�47j' . ,�.__. c +.'x 2's"f• ;fir* rL e`"'�' :..}� Illat I � . v' , s" v ; 3 } t , i � �✓r : 'r^,.�'t' own property adjacent to I hereby certify �, ._ s (Novo of Property Owner) property lcxatedatAeAO,'A M 716 ,f 1. ?. ��i� �A), 61. I g,. 9�'S- (Lot, Block, Road, etc.) on _ .. in 6W4 4644ke% N.C. (Town and/or-- crjuty) V described to me as shown below, the developnir A hF: i.so�os at that ar,6. t have.1v ob;er.dons to his proposal. JUN 10 2002 '-'' S r—R=ON AND/OR DRAW I.'TO OF PRO) - coy (To be failed in by indzvi ivaZ p, 11 .2 %L QL` SlgnatI.L Print er Type Nal;,e 2:S -7304-/ Telephone Numme- Date: 6 -- ( _0 2, Sea Gate Marina r z� 6/6/02 - Sea wall replacement ONE w lie a,L ` t SECTION.1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS AIND THE PLACElY1ENT OF RIPRAP FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS 1SA NCAC 07H .1101 PURPOSE This permit will allow the construction of bulkheads and the placement of riprap for shoreline protection in the public trust waters and estuarine waters AECs according to authority provided in Subchapter 7J .1100 and according to the following guidelines. This permit will not apply to shoreline protection within the ocean hazard AEC. HistoryMote: Authority G.S. 113A-10"(a); 113A-107(b); 113A-113(b); 113A-118.1; 1134-124; Ef _ ,?vfarch 1, 1984. 15A NCAC 07H.1102 APPROVAL PROCEDURES (a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for development. The applicant shall provide information on site location. dimensions of the project area, and his name and address. (b) The applicant must provide: (1) confumadon that a written statement has been obtained signed by the adjacent riparian property owners indicating that thev have no objections to the proposed work: or (2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed work. Such notice should instruct adjacent property owners to provide anv comments on the proposed development in writing for consideration by permitting officials to the Division of Coastal Management within ten days of receipt of the notice; and, indicate that no response will be interpreted as no objection. DCM staff will review all comments and determine, based on their relerancao the potential impacts of the proposed project, if the proposed project can be approved by a General Permit. L{DCM staff finds that the comments are worthy of more in-depth review, the applicant will be notified that he must submit an application for a major development permit (c) No work shall begin until an on -site meeting is held with the applicant and appropriate Division of Coastal Management representative so that the proposed bulkhead alignment can be appropriately marked. Wrirtea authorization to proceed with the proposed development may be issued during this visit_ Construction of the bulkhead or riprap structure must bed 90 days of this visit or the general authorization expires and it will be necessan_- to re-examine the atignmerrb deter--_,-,e if the gene. -al authorization can be reissued. Histor✓Vote: Authority G.S. 113.4-10-(a); 113A-10i(b); 113A-113(b); 113.1-118.1; 113a-124; , 7ff . March 1, 1984; Amended Eff. January 1, 1990; December 1, 1987 14A NCAC 07H. 1103 PERMIT FEE The applicant must pay a permit fee of one hundred dollars (S100.00) by check or mope.: order payable to the Department, History Vote: Author-itvG.S. 113.4-10 113A-113(b); 113,4-118.1; 113A-119; 113419.1; 113.4-I2"; EtJ-: March 1, 1984; Amended Ef. August], 2000; March 1, 1991. ISA NCAC 07H .1104 GENERAL CONDITIONS (a) This permit authorizes only the construction of bulkheads and the placement of riprap conforming to the standards herein- (b) Individuals shall allow authorized representatives of the Department of Environment, Health. and Natural Resou-es to make periodic inspections at any time deemed necessary in order to be sure that the activity being performed under authority_ of this general permit is in accordance with the terms and conditions prescribgd herein. (c) There shall be no significant interference with navigation or use of the waters by the public by the existence of the bulkhead or the riprap authorized herein. (d) This permit will not be applicable to proposed construction where the Department has determined, based on an initial ruview of the application. that notice and review pursuant to G.S. 113A-119 is necessary because there are unresolved questions concerning the proposed activity's impact on adjoining properties or on water quality; air qualirv: coastal wetlands: cultural or historic sites; wildlife; fisheries resources; or public trust rights. (e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization. (f) DeveIopment carried out under this permit must be consistent with all local requirements. AEC rules. and local land use plans current at the time of authorization - History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124' Eff. March 1, 1984; Amended Eff. May 1, 1990; December 1, 1987; RRC Objection due to ambiguity Eff May 19, 1994; Amended Eff. August 1, 1998; JuIv 1, 1994. 15A NCAC 07H.1105 SPECIFIC CONDITIONS (a) This general permit is applicable only along shorelines void of wetland vegetation including marsh grass and wooded swamp, or where all constuction is to be accomplished landward of such vegetation (b) Along natural shorelines e.g. rivers. creeks. bays. sounds, etc., bulkheads and riprap material must be positioned as follows: (I) Bulkheads must be positioned so as not to exceed more than an average distance of 2 feet n•ate:-n'ard of the mean high water mark or the normal water level contour, whichever is applicable. In no case shall the bulkhead be positioned more than 5 feet waterward of the mean high water or normal water leV el contour at any point along its alignment. (2) Rpprap must be positioned so as not to exceed a maximum of 5 feet wate-ward of the mean him wate<, marl; or normal water level 'contour at any point alone itsalignmeat. This location standard also anoiies to riprap proposed waterward of the existing bulkheads. (c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap material must be positioned so as not to exceed more than an average distance of 5 feet waterward of the mean high water mark or the normal water level contour. whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 feet waterward of the mean high water or normal water level contour at any point along its alignment. For the purpose of these Rules, the Atlmtic Intracoastal Waterway (AIW-W) is considered a natural shoreline and development must occur as descnoed in 7H A 10-i o i. (d) Constriction authorized by this general permit will be limited to a maximum shoreline leng+h of 500 feet- (e) All backfrll material shall be obtained from an upland sour. (f) The bulkhead must be constructed. or the riprap must be in place prior to any backfilling activities. (e) The bulkhead or riprap must be structurally tight so as to prevent seepage of backfril materials through the structure. (h) Riprap mate ;al shall be fee from loose dirt or any other pollutant. It must be of a size satircieat to pre: ,t its movement from the site by wave or current action. (i) Rpprap material must consist of clean rock or masonry materials such as but not limited to unite or broken concrete. Materials such as tires. car bodies, scrap metal paper products. tree limbs. wood debris. organic mar :;a1 or similar material are not considered riprap. 0) The bulkhead must be solid and constructed of treated wood. concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the cor��uction of the bulkhead walL riprap, deadmen cables, etc. Tltis permit does not authorize any excavation waterward of the aotJroved alignment. (k) Bulkheads or riprap shall not extend beyond established alignments nor restrict the original width of the canal or basin (1) If one contiguous acre or more of properry is to be excavated or filled. an erosion and sedimentation control piaa must be filed with the Division of Land Resources, Land Quality Section or appropriate local government oveent having jurisdiction. Thisplanmust be approved prior to commencing the land -disturbing activity. History.Note: Authority G.S. 113A-107(a); 113,4-107(b); 113A-113(b); 113A-118.1; 113.4-124.- 4or March 1, 1984; Amended Eff.December 1, 1991; January 1, 1989; December 1, 19817. History:Vote: AuthoritvG.S. 113A-10-; 113A-118.I, Temporary Adoption Eff. October 1, 1999.