HomeMy WebLinkAbout32039_SEAGATE ASSOCIATION, INC_20020611l Vi/
CAMA / ❑ DREDGE & FILL 32039
GENERAL PERMIT
Previous permit #
6inNew ❑Modification []Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
Applicant Name SFo &A Tf A S S C('A T (. N /I��•
Address 7il 0 T-r n R
CiState �Ji ZIP 2'�- S-f 0
Phone # O , , ��'� /, Fax # ( )
Authorized Agent Ar r 'el
Affected ❑ CW ll EW XPTA ?9 ES P�PTS
AEC(s): ❑ OEA ❑ HHF ❑ IH ❑ UBA ❑ N/A
F PWS: ❑FC:
ORW: yes / no PNA yes / Crit. Hab. yes / no
Type of Project/ Activity
_1 ri '( C r
Pier (dock) length
Platform(s)_
Finger pier(s)
Groin length
number
Bulkhead/ Riprap length 1 C,
avg distance offshore
max distance offshore
Basin, channel
cubic yards �` u
Boat ramp _
Boathouse/ Boatlift 1 V
Beach Bulldozing
Other
Project Location: County (Gi lIrI ; +<'
Street Address/ State Road/ Lot #(s)
Subdivision ,• ; ,rz
City /V`iw a ZIP ZfS?o
Phone # () River Basin✓��
Adj. Wtr. Body IN k at man /unkn
Closest Maj. Wtr. Body
J r e (ar f►afN¢ rJ i� rr ti 11
%rY� rFs mall
(Scale: N rNC )
— 7---1-
I � _
t�
Shoreline LengthI /JIl}
M
SAV: not sure yes
Sandbags: not sure yes
Moratorium: n/a yes P-47IN fit - 1
Photos: no
Y i
Waiver Attached: yes
A building permit maybe required by: iu r Jr i < i { v vt ❑ See note on back regarding River Basin rules.
Notes/ Special Conditions Y 16A 11Nd i(1 ,,I me J rid'd 41-*.
1 j�Ii(,du: j tl; io. V'10tf 1kt rEu lJt+'1l4 c IV, Ivt l
f�
Agent or Applicant Printed Name
Signature Please read compliance statement on back of permit
�I CC.04
Application Fee(s) Check #
Permit Officer's Signature
Issuing Date Expiration Date
Local Planning Jurisdiction Rover File Name
io�l
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to complywith thesebuffer rules.
Division of Coastal Management Offices
Central Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888ARCOAST
Fax:919-733-1495
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax:910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 10/05/01
L.._. POSTAL
STATES POSTAL MONEY ORDER 15 0
�POST/JL SERVICEc� POSTAL ►—� 000
is.`a�.od�eSvi��uca��a��a��:.u,., ,- ,,: ; .. ., ., .• : • ,,.� . � ,.,5>sar»u;,,:•rr��a�.•�eaycc�ti
90289276482 0aM:1, ! 28a' r•o0 * 100* 0 0
SERIAL NUMBER YEAR MONTH DAV POST OFFICE - -" U.S.DOLLARSAND CENTS
CHECKWRITER ►
PAY TO IMPRINT AREA
ADDRESS FRO.
Cry} // /• �t�.
USED FOR OCT/�" . , LT 1. d f�l/T� ily� 1M 7 AIVU 1�iIC
JLY IN-TAE..U.S. AND POSSESSIONS
1:00000800 21: 90 289 37648 2111
44
ADJACE-N'.*O'.RYLPARLAN pRo
PERTY OWNER epl�
I herf-by certify that I own property adjacent to 5614 6ZA7'F h6zCJ,*71"6
- �111)s
of Property Owner)
property lcy-atedat 5eA _ ;r 5::� &JAJ e)14 2,
(Lot, Block, Road, etc.)
on ro
N c
L
(Town and4c Criuuty)
-P ',- 13,; s riPzt-r;'hF-A 1. 11 1J -
- me— shown. below, the deveIopni,.,,,f. b-,
Oy,r+ I k4vtsmo 0hjierAions to his proposal.
,r,T,, - " - —�-TJMON AND/OR DRAW)f.dG OFPRr)'7
h:'',_"
(To he filled in by i7z di P i a va 1 p
2%
P-1 7,
ce
'S i gn a -
F R C T73',L'
Print cr Type Name
7Z,3 - - 57 73
Te' leahone
Number
Date: - L19, - 0 �
7.?o S64 7t -4�
4,PT / 6- 5q
K
S+t �'�„"'�- Y" ,,.3�'�y"arn.'�47j'
. ,�.__. c +.'x 2's"f• ;fir* rL e`"'�' :..}�
Illat I � . v' , s" v ; 3 } t , i � �✓r : 'r^,.�'t'
own property adjacent to
I hereby certify �, ._
s
(Novo of Property Owner)
property lcxatedatAeAO,'A
M 716 ,f 1. ?. ��i� �A), 61. I g,. 9�'S-
(Lot, Block, Road, etc.)
on _ .. in 6W4 4644ke% N.C.
(Town and/or-- crjuty)
V described to me as shown below, the developnir A hF: i.so�os at that
ar,6. t have.1v ob;er.dons to his proposal.
JUN 10 2002
'-'' S r—R=ON AND/OR DRAW I.'TO OF PRO) - coy
(To be failed in by indzvi ivaZ p,
11
.2 %L
QL`
SlgnatI.L
Print er Type Nal;,e
2:S -7304-/
Telephone Numme-
Date: 6 -- ( _0 2,
Sea Gate Marina
r
z�
6/6/02 -
Sea wall replacement
ONE w
lie
a,L `
t
SECTION.1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS AIND THE PLACElY1ENT OF
RIPRAP FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS
1SA NCAC 07H .1101 PURPOSE
This permit will allow the construction of bulkheads and the placement of riprap for shoreline protection in the public trust waters
and estuarine waters AECs according to authority provided in Subchapter 7J .1100 and according to the following guidelines.
This permit will not apply to shoreline protection within the ocean hazard AEC.
HistoryMote: Authority G.S. 113A-10"(a); 113A-107(b); 113A-113(b); 113A-118.1; 1134-124;
Ef _ ,?vfarch 1, 1984.
15A NCAC 07H.1102 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for
development. The applicant shall provide information on site location. dimensions of the project area, and his name and address.
(b) The applicant must provide:
(1) confumadon that a written statement has been obtained signed by the adjacent riparian property owners
indicating that thev have no objections to the proposed work: or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice should instruct adjacent property owners to provide anv comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management within
ten days of receipt of the notice; and, indicate that no response will be interpreted as no objection. DCM staff
will review all comments and determine, based on their relerancao the potential impacts of the proposed
project, if the proposed project can be approved by a General Permit. L{DCM staff finds that the comments
are worthy of more in-depth review, the applicant will be notified that he must submit an application for a
major development permit
(c) No work shall begin until an on -site meeting is held with the applicant and appropriate Division of Coastal Management
representative so that the proposed bulkhead alignment can be appropriately marked. Wrirtea authorization to proceed with the
proposed development may be issued during this visit_ Construction of the bulkhead or riprap structure must bed 90 days
of this visit or the general authorization expires and it will be necessan_- to re-examine the atignmerrb deter--_,-,e if the gene. -al
authorization can be reissued.
Histor✓Vote: Authority G.S. 113.4-10-(a); 113A-10i(b); 113A-113(b); 113.1-118.1; 113a-124;
, 7ff . March 1, 1984;
Amended Eff. January 1, 1990; December 1, 1987
14A NCAC 07H. 1103 PERMIT FEE
The applicant must pay a permit fee of one hundred dollars (S100.00) by check or mope.: order payable to the Department,
History Vote: Author-itvG.S. 113.4-10 113A-113(b); 113,4-118.1; 113A-119; 113419.1; 113.4-I2";
EtJ-: March 1, 1984;
Amended Ef. August], 2000; March 1, 1991.
ISA NCAC 07H .1104 GENERAL CONDITIONS
(a) This permit authorizes only the construction of bulkheads and the placement of riprap conforming to the standards herein-
(b) Individuals shall allow authorized representatives of the Department of Environment, Health. and Natural Resou-es to make
periodic inspections at any time deemed necessary in order to be sure that the activity being performed under authority_ of this
general permit is in accordance with the terms and conditions prescribgd herein.
(c) There shall be no significant interference with navigation or use of the waters by the public by the existence of the bulkhead
or the riprap authorized herein.
(d) This permit will not be applicable to proposed construction where the Department has determined, based on an initial ruview
of the application. that notice and review pursuant to G.S. 113A-119 is necessary because there are unresolved questions
concerning the proposed activity's impact on adjoining properties or on water quality; air qualirv: coastal wetlands: cultural or
historic sites; wildlife; fisheries resources; or public trust rights.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization.
(f) DeveIopment carried out under this permit must be consistent with all local requirements. AEC rules. and local land use plans
current at the time of authorization -
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124'
Eff. March 1, 1984;
Amended Eff. May 1, 1990; December 1, 1987;
RRC Objection due to ambiguity Eff May 19, 1994;
Amended Eff. August 1, 1998; JuIv 1, 1994.
15A NCAC 07H.1105 SPECIFIC CONDITIONS
(a) This general permit is applicable only along shorelines void of wetland vegetation including marsh grass and wooded swamp,
or where all constuction is to be accomplished landward of such vegetation
(b) Along natural shorelines e.g. rivers. creeks. bays. sounds, etc., bulkheads and riprap material must be positioned as follows:
(I) Bulkheads must be positioned so as not to exceed more than an average distance of 2 feet n•ate:-n'ard of the
mean high water mark or the normal water level contour, whichever is applicable. In no case shall the
bulkhead be positioned more than 5 feet waterward of the mean high water or normal water leV el contour at
any point along its alignment.
(2) Rpprap must be positioned so as not to exceed a maximum of 5 feet wate-ward of the mean him wate<, marl; or
normal water level 'contour at any point alone itsalignmeat. This location standard also anoiies to riprap
proposed waterward of the existing bulkheads.
(c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap material must be positioned so as not to
exceed more than an average distance of 5 feet waterward of the mean high water mark or the normal water level contour.
whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 feet waterward of the mean high water or normal water level contour at any point along its alignment. For the purpose of these Rules, the Atlmtic Intracoastal
Waterway (AIW-W) is considered a natural shoreline and development must occur as descnoed in 7H A 10-i o i.
(d) Constriction authorized by this general permit will be limited to a maximum shoreline leng+h of 500 feet-
(e) All backfrll material shall be obtained from an upland sour.
(f) The bulkhead must be constructed. or the riprap must be in place prior to any backfilling activities.
(e) The bulkhead or riprap must be structurally tight so as to prevent seepage of backfril materials through the structure.
(h) Riprap mate ;al shall be fee from loose dirt or any other pollutant. It must be of a size satircieat to pre: ,t its movement
from the site by wave or current action.
(i) Rpprap material must consist of clean rock or masonry materials such as but not limited to unite or broken concrete.
Materials such as tires. car bodies, scrap metal paper products. tree limbs. wood debris. organic mar :;a1 or similar material are not considered riprap.
0) The bulkhead must be solid and constructed of treated wood. concrete slabs, metal sheet piles or other suitable materials
approved by department personnel. No excavation is permitted except for that which may be required for the cor��uction of the
bulkhead walL riprap, deadmen cables, etc. Tltis permit does not authorize any excavation waterward of the aotJroved alignment. (k) Bulkheads or riprap shall not extend beyond established alignments nor restrict the original width of the canal or basin (1) If one contiguous acre or more of properry is to be excavated or filled. an erosion and sedimentation control piaa must be filed
with the Division of Land Resources, Land Quality Section or appropriate local government oveent having jurisdiction. Thisplanmust
be approved prior to commencing the land -disturbing activity.
History.Note: Authority G.S. 113A-107(a); 113,4-107(b); 113A-113(b); 113A-118.1; 113.4-124.-
4or March 1, 1984;
Amended Eff.December 1, 1991; January 1, 1989; December 1, 19817.
History:Vote: AuthoritvG.S. 113A-10-; 113A-118.I,
Temporary Adoption Eff. October 1, 1999.