HomeMy WebLinkAbout27581_NC DOT_20010223Your project is subject to the NC: Division oT
Water Quality Neuse River Buffer Rules due
CAMA and DREDGE AND FILL to its location within the Neuse River Basin.
Please contact Deborah Sawyer at 27581 '
GL N L K A L 252-946-6481
PERM I T
as authorized by the State of North Carolina
Department of Environment and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC
Applicant Name Phone Number t
Address
City State zip
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
PROJECT DESCRIPTION SKETCH
Pier (dock) Length
Groin Length
number
Bulkhead Length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other
This permit is subject to compliance with this application, site drawing
and attached general and specific conditions. Any violation of these terms
may subject the permittee to a fine, imprisonment or civil action; and
may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit of-
ficer when the project is inspected for compliance. The applicant certi-
fies by signing this permit that 1) this project is consistent with the local
land use plan and all local ordinances, and 2) a written statement has
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work.
In issuing this permit the State of North Carolina certifies that this project
is consistent with the North Carolina Coastal Management Program.
(SCALE: i,, )
applicant's signature
permit officer's signature
issuing date expiration date
attachments
application fee
DEPARTMENT OF TRANSPORTATION
DIVISION 02 OFFICE
P. O. BOX 1587
GREENVILLE, NC 27835
Pay
DATE 01/24/2001
66-1059 STATE TREASURER, RALEIGH. NORTH CAROLINA
531 PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM
,r y,.,.,.,errrrr* y,.,�•rr r♦,.,.♦,...r•s♦v��s,• v♦
f��10-0-
Pay N.C.D.E.N.R.
the GREENVILLE, NC 27835
Order of
nuuunirusuani nt
ii'000084 3 711' j:0 S 3 L LO S94i: E01000-61, 2110
tSOP.O.T
10+00 P, p .T,
rlA
42' DOE
4-- TO SR- 14:.2 1
CCASS.II
R1P RAP
PF-R►\17 STATuS
FILL IN WATERS
= NONE
FILL IeJ WETLANDS
= NONE
4VG DAILY FLOw
= 14.85
C.O. E. NATiOv11ofIDE
03
C. A. M. A . AP,o/go(/Az
RFQ .' D
rE%
n
2 ® 35 ' PRE S-00- GORED 5L A8
CL.A55 jr
/1 R,PRAP
S1.9 P0.T.
(P K)
124-00 P. i CP0
BURIED jVALT&A L.IAO
Z
—
TO SR- /Oo3 ---Op
CRRVeN CovNTY
gR%DGE NO. Cil
5R- NO, 14024
SwIFr GREE/<
SCAL.— ", SO E10121Z
srA . 10-t 33 , 90*sK9w
2 ® 3S' PRE57'REsSeD S4AI3
CR. GR. EL. 99.5
0
0
rn
w
Ex. GR.�
N. G .tom
Nw2SEc.. 9�.4
5 6PF
I o BPF
44 6PF
200 13P>:
CRAVEN COUNTY
6R. 3c 1'1 5R 1 b24
3 SPA>a Ex i sT.
Z-
o.a.
CRE0, 71 M
EX iSz . AREA - 322. SQ. FT.
PROP. AP -EA = 404 5Q.F1.
1"=1�V6RT.
/Ezi5riN4 IooYR. E)-, I0C>
1 rPRop. YR. EL. /00.8
t �
LRMW9T.i�. DP-SiGr,1 HW,oEt.98.0
OVERT-ap wc, SCOUR
12 81P�
I OVER TOPPI�4 G INFO •
35 6PF
e L 99.5
FREQ 25 YR
bo ePc D'S. 1450 C.F.S•
200 BPF
3 4 5
6
r0
zs
}L �, B F A U F O R T C O U N T Y
100
17_
1
v! ry 162,
\
1 n79, e 1 —\, f
(RAUEAJ Cvv t ,5
29
Z 23 ] \
C63
r
.\ <, a7y P 6
22 ='
\ 161
INe'p 'oaf �� B I G P 0 C 0 s I N 1024 t� ` a.
^ 1472 = ti /
-16
1,- C56 ` ,6 Op]
bad \`13L�y le
35 _ 1 —'ply ""
38
P102 Ar ,'7 7
rOL
v�OR 7� a IAM
�N- O/
1�e1 iaw HolyOL
Hitl'T
P 39
1.1 14=3
f,S
Perfection ?-a
5 .9
T—Y c u_rter
C51�
`1_al
18
1
-6
Prle Tras
c
yA Ie]] P 213 I,\
27 26
P25 ,1 I 16H f(f
20
) ,,�
1631
la]v 7,i '`� Fan1A
62 0�
low
16lo
r
I r '?�
1a] /7
i.7
E
1.7 b
rsz
21
20
�A
5
It,
64
oil
/ lle7 1t�
a
( 1a�
~ --- /
Hope ti
96 Isle cl' - S i
m, '•4
:i^_
a•
44—
o'
I ! 117 183
A.kel Kit Swmep -
11 1620
1
7�
Ck
0
INSET
r209
13
" ,.
La e'��!' �
vll�e
f 1 1f
H
�•' Zo
1G13
I
'S . 1611
—
Rory
13
a!.7
1 �. -
,.IN, 207
1.{.
Corner
� ^
17 �O
1613
1.z l:mo
34_'s���
w
124" X
e' lase
14W
� por.sl
loo
RIVER N 1.6
_ a
o ss
,
$ROG
�o
Upper
Uvv<r
N
�t� ae
'
� �� ����
� D8O028 F�
� 8RIDGE MAINTENANCE UNIT RUN DATE 05/20'r`'�.
DATA ON EXISTING STRUCTURE
� '-�-------------'_--'---------------------------------
� .| DI ---------------------
COUNTY: DIV ST./ STRUCTURE NUM8ERi
CRAVEN LENGTH:
52 FEET
02 2 24�17
--------______________________________________________--_
� ROUTE CARRIED: FEATURE INTERSECTED: ----- ----------------
SR1624
LITTLE SWIFT CREEK
LOCATED: ------------------------------
' BRIDGE NAME: -----------------------------
------------------
--------------------------
BUILT! BY: PRO& FED -AID PROJ: DESIGN LOAD:
TIMBER FLOOR ON TIMBER JOIShr.;
---------------------------------------------------------------------
---------------------------------------------------------------
BEAMS OR GIRDERS:
10LINES 6X16TIMBER JOISTS @ VARYING CTS.
___________
---------------------------
FLOOR: ENCROACHMENTS/ DECK (-----------------
4X8 TTM/NO AWS u»| /O OUT):
-------------------------- ___________________________'__________ 020.2
CLEAR ROADWAY: BETWEEN RAILS/ SIDEWALK OR CURB: --------------
O19.2__. . � 019_.8_______LT_O0.3 RT 00.3
� VERT.CL.OVERi VERT.CL' UNDER/ HOR CL UNDER -----SPECIAL------PERMIT----:--
�
99 FT 99 IN 00 FT OO IN --'
L_______________________________ �O'0 FT C-1
_r--------------------------------
INV.RTS.: OPE.RTG.i CONTR.iMEM8ER: POSTED/ -----------
------
HS-_15----_HS-______ __
_____
20.'JOIST INT.SV29TTST38_DATE 03 18 1997
-_-- ---------------
SYSTEM:
GREEN LINE ROUTE:
5 SECONDARY
NO
------------------ ------------------------------------------------
_�ND OPENING� 3RD OPENIMG� 4TH OPENING/ 5TH---
OPENING/ -------
----_--- ---- -------- ---- _------- '--- --------
|- ------'--------'----------------------------------___
� REMARKC� ----------------------
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major h
Permit, Form DCM-MP-l. Be sure to complete all i.
other sections of the Joint Application that relate to this
proposed project.
1. BRIDGES
a. Public X Private
b. Type of bridge (construction material)
Concrete and Steel
c. Water body to be crossed by bridge
Little Swift Creek
d. Water depth at the proposed crossing at MLW or
NWL 5'
e. Will proposed bridge replace an existing bridge?
X Yes No
If yes,
(1) Length of existing bridge 52'
(2) Width of existing bridge 20.2'
(3) Navigation clearance underneath existing
bridge 7'
(4) Will all, or a part of, the existing bridge be
removed? (Explain) Entire Bridge will be
removed and replaced. Existing bulkhead
will be cut at NWL and left to contain Rip
Rap that will be placed at each end.
f. Will proposed bridge replace an existing culvert(s)?
Yes X No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
g. Length of proposed bridge 70'
r-E8 0 5 2009
Width of proposed bridge 30'
Height of proposed bridge above wetlands
7'
j. Will the proposed bridge affect existing water flow?
X Yes No
If yes, explain Bridge will be longer to allow more
water to pass at higher water
levels.
k. Navigation clearance underneath proposed bridge
7'
1. Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? Yes X No
If yes, explain
m. Will the proposed bridge cross wetlands containing
no navigable waters? Yes X No
If yes, explain
n. Have you contacted the U.S. Coast Guard
concerning their approval?
Yes X No
If yes, please provide record of their action.
2. CULVERTS
a. Water body in which culvert is to be placed
b. Number of culverts proposed
c. Type of culvert (construction material, style)
d. Will proposed culvert replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge N/A
(2) Width of existing bridge N/A
Revised 03/95
Form DCM-MP-5
F F$ 0 5 2 0 01
(3) Navigation clearance underneath existing
(3) Amount of material to be excavated in cubic
bridge N/A
yards
(4) Will all, or a part of, the existing bridge be
removed? (Explain) N/A
c. Will the placement of the proposed bridge or culvert
require any highground excavation?
e.
Will proposed culvert replace an existing culvert?
X Yes No
Yes No
If yes,
If yes,
(1) Length of area to be excavated 18'
(1) Length of existing culvert
(2) Width of area to be excavated 24'
(2) Width of existing culvert
(3) Amount of material to be excavated in cubic
(3) Height of the top of the existing culvert above
yards 112 cu. Yds.
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
d. If the placement of the bridge or culvert involves
removed? (Explain)
any excavation, please complete the following:
(1) Location of the spoil disposal area
f.
Length of proposed culvert'
Temporary spoil area is existing road bed
g.
Width of proposed culvert
(2) Dimensions of spoil disposal area
20' x 20'
h.
Height of the top of the proposed culvert above the
(3) Do you claim title to the disposal area?
MHW or NWL
X Yes No
If no, attach a letter granting permission from
i.
Will the proposed culvert affect existing water flow?
the owner.
Yes No
(4) Will the disposal area be available for future
If yes, explain
maintenance? X Yes No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
j.
Will the proposed culvert affect existing navigation
Yes X No
potential? Yes No
If yes, give dimensions if different from (2)
If yes, explain
above.
(6) Does the disposal area include any area below
the MHW or NWL? Yes X No
3.
EXCAVATION AND FILL
If yes, give dimension if different from No. 2
above.
a.
Will the placement of the proposed bridge or culvert
e. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
result in any fill (other than excavated material
X No
described in Item d. above) to be placed below
_ _Yes
If yes,
MHW or NWL? Yes X No
(1) Length of area to be excavated
If yes,
(2) Width of area to be excavated
(1) Length of area to be filled
(3) Depth of area to be excavated
(2) Width of area to be filled
(4) Amount of material to be excavated in cubic
(3) Purpose of fill
yards
b. Will the placement of the proposed bridge or culvert
require any excavation within:
Coastal Wetlands SAVs Other Wetlands
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
f. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
Coastal Wetlands SAVs X Other
Wetlands If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
Revised 03/95
Form DCM-MP-5
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? Yes X No
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
4. GENERAL
a. Will the proposed project involve any mitigation?
Yes X No
If yes, explain in detail
b. Will the proposed project require the relocation of
any existing utility lines? Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes X No
If yes, explain in detail
d. Will the proposed project require any work
channels? Yes X No
If yes, complete Form DCM-MP-2
e. How will excavated or fill material be kept on site
and erosion controlled? Silt fence
f. What type of construction equipment will be used
(for example, dragline, backhoe or hydraulic
dredge)? Typical Bridge construction equipment
g. Will wetlands be crossed in transporting equipment
to project site? Yes X No
If yes, explain steps that will be taken to lessen
environmental impacts.
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
X Yes No
If yes, explain in detail RipRap will be placed at
the ends of the bridge
NCDOT-Craven # 17
Applicant or Project Name
Signature
/ /o /
Date
FLES 0 5 2001
Revised 03/95
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
_ 1 /24/2001 (Date)
Thurman & Paulette Guion Smith
_311 Bragg St. NE_
Wilson, N.C. 27893
Dear Mr. Smith
F ES 0 5 2001
This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation
plans to construct a _2 @ 35' Prestr. Cored slab ( Replace existing bridge)
onsite of his/her property located SR 1624
in Craven
County. The sketch attached accurately depicts the proposed construction.
Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and
return as soon as possible to:
Mr. Scott Jones
N.C. Dept. of Environment and Natural Resources
Morehead City District
Division of Coastal Management
151-B Hwy 24 Hestron Plaza II
Morehead City, City N.C. 28557
Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice.
NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION.
Sincerely,
I have no objection to the proposed project as described in this correspondence.
I have objection to the project as presently proposed and have enclosed comments.
(Signature)
(Date)
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
_ 1 /24/2001
_Jerry T. & Joanne Norman
3230 Hillneck Road
Ernul, N.C. 28527
Dear _Mr. Norman
(Date)
FEB 0 5 2001
This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation
plans to construct a _2 @ 35' Prestr. Cored slab ( Replace existing bridge)
onsite of his/her property located SR 1624
in _Craven County. The sketch attached accurately depicts the proposed construction.
Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and
return as soon as possible to:
Mr. Scott Jones
N.C. Dept. of Environment and Natural Resources
Morehead City District
Division of Coastal Management
151-13 Hwy 24 Hestron Plaza II
Morehead City, City N.C. 28557
Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice.
NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION.
Sincerely,
I have no objection to the proposed project as described in this correspondence.
I have objection to the project as presently proposed and have enclosed comments.
(Signature)
(Date)
SENDER:
■ Complete it. 1 and/or 2 for additional services.
M - ■ Complete 'items 3, 4a, and 4b.
■ Print your name and address on the reverse of this form so that we can return this
card to yyou.
■ A�ttaatchh tltia torn to the front of the mailplece, or on the back if space does not
Perry*
■ Write "Retum Receipt Requested'on the mailpiece below the article number.
t ■ The Return Receipt will show to whom the article was delivered and the date
delivered.
3. Article Addressed to: 4a. Article Number
i'C'C' - f li
4b. Service Type
S Thurman and Paulette Guion Smith ❑ Registered
4 3 I I Bragg Street, NE
Wilson, NC 27893
W 6. Signature:
� I
or
❑ Express Mail
❑ Return Receipt for Merchandise
7. Date of Deljver�
l L— -
I also wish to receive the
following services (for an
extra fee):
1. ❑ Addressee's Address
2. ❑ Restricted Delivery
Consult postmaster for fee.
0 Certified
❑ Insured
❑ COD
8. Addressee's Address (Only if requested
and fee is paid)
-n Receipt
UNITED STATES POSTAL SERVICE �! First -Class Mail
'1 Postage & Fees Paid
M usPs
O
Permit No. G40-
................__...._._...._............_ � _.�.;...,6pa1.... _. _,___ ., ...... _..�.....,.._.._,_, _,..,.
I
• Print your he addrs, and ZIP Code in this box
}
i
N. C. Dept. of Transportation }
s
P. O. Box 1587
Greenville, NC 27835-1587
�s, a113��1it,t,ts11,�4�I„�IIIIItill III till till{�t�til�ll�li�
SENDER:
■ Complete Remo 1 and/or 2 for additional services.
f M ■ Complete items 3, 4a, and 4b.
■ Print your name and address on the reverse of this form so that we can return this
card to you.
■ pAtttacchh this torn to the front of the mailpiece, or on the back if space does not
m ■ write 'Retum Receipt Requested' on the mailplace below the article number.
■ The Return Receipt will show to whom the article was delivered and the date
delivered.
I also wish to receive the
following services (for an
extra fee):
1. ❑ Addressee's Address
2. ❑ Restricted Delivery
Consult postmaster for fee. ty ?
a 3. Article Addressed to:
4a. Article Number
v9qPMZ
j4b.
Robbie Howard Toler
Service Type
S 3075 Auroa Road
❑ Registered
Emul, NC 28527
❑ Express Mail
P-RRwn Receipt for Merchandise
(
Date of elivery
PS Form
By: (Print Name) _ 18. Addressee's Ad
and fee is paid)
or
7 U . i
11, December 1994
3 %9 E ';
4 Certified 'J
0 Insured V y
to2595-9a-a-o2-- Domestic Return Receipt
UNITED STATES POSTAL
• Print
rOER
First-Class Mail
Postage & Fees Paid
USPS
Permit No. G-10
and ZIP Code in this box •
N. C. Dept. of Transportation
P. O. Box 1587
Greenville, NC 27835-1587
l�
5(Z� to q
w' i ;'�� 1��1f11��►11��l„ll��i�i���,11�i,l,I,�Li<<�li�►I�t�Ii f I I i
SENDER:
I also wish to receive the
■ Complete items 1 and/or 2 for additional services.
■ Complete items 3, 4a, and 4b.
fOIIOWIn services for an
g
■ Print your name and address on the reverse of this form so that we can return this
extra fee):
card to you.
■ this form to the front of the mailpiece, or on the back if space does not
1. ❑ Addressee's Address
pAttach
■ Wen el t"Return Receipt Requested'on the mailpiece below the article number.
2. El Restricted Delivery
■ The Return Receipt will show to whom the article was delivered and the date
delivered.
Consult postmaster for fee.
a
3. Article Addressed to:
Robbie Howard Toler
3075 Aurora Road
Emul, NC 28527
5. eceived By: (Print Name) _r
6. lgnature: (Addressee or Agent)
x
PS Form 3811, December 1994
4a. Article Number 9
.70r9 g1j)j.,'sgy6
4b. Service Type E
❑ Registered Certified 9 )
❑ Express Mail ❑ Insured c
❑ ceipt for Merchandise TEIC7 \ I �
7. ate of elivery
8. Addressee's Address (Only if re ested Y
and fee is paid)
102595-98-B-0229 uomestic Heturn Hecelpt
UNITED STATES POSTAL SERVICE
• Print your
N N�
PMr� II II
driEw nd ZIP
N. C. Dept. of Transportation
P. O. Box 1587
Greenville, NC 27835-1587
8-: S+i Fa,`
--f [ Permit No._GV--
SENDER:
I also wish to receive the
■ Complete items 1 and/or 2 for additional services.
■ Complete items 3, 4a, and 4b.
following services (for an
■ Print your name and address on the reverse of this form so that we can return this
extra fee):
card to you.
• Attach this form to the front of the malipiece, or on the back if space does not
1. ❑ Addressee's Address
Zino
■Write "Return Receipt Requested"on the mailpiece below the article number.
2. ❑ Restricted Delivery
■ The Return Receipt will show to whom the article was delivered and the date
Consult postmaster for fee.
delivered.
3. Article Addressed to:
4a. Article Number
C'q j )UD CDO _Z of �555-3
4b. Service Type
Jerry T. and Joanne Norman
3230 Hillneck Road
❑ Registered] Certified
❑ Express Mail ❑ Insured
Ernul, NC 28527
❑ Return Receipt for Merchandise ❑ COD
7. Date of Delivery
5. Received By: (Print Name)
8. Addressee's Address (Only if requested
and fee is paid)
6. Si ture: (Adore see gent)
PS Fo 3811 December 114194 10259e-98-13-0229 Domestic Return Receipt
UNITED STATES POSTAL SERVICE �G
U,
1 .• .��
f • Print your name, address, and ZIP Cod i�, is bb1
JvWSJ S%,I le
N. C. Dept. of Transportation
P. O. Box 1587
Greenville. NC 27835-1587
I{IIlII11lIIIIIt11IIIIIII11fIIIIIiIiI1lIlIlIlII11IlIi11IIFI1tI
Mail
Fees Paid
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
_ 1 /24/2001
Robbie Howard Toler
_3075 Aurora Road
_Ernul, N.C. 28527
(Date)
FFQ 0 5 2001
Dear Mr. Toler
This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation
plans to construct a _2 @ 35' Prestr. Cored slab ( Replace existing bridge)
onsite of his/her property located SR 1624
in _Craven County. The sketch attached accurately depicts the proposed construction.
Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and
return as soon as possible to:
Mr. Scott Jones
N.C. Dept. of Environment and Natural Resources
Morehead City District
Division of Coastal Management
151-B Hwy 24 Hestron Plaza II
Morehead City, City N.C. 28557
Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice.
NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION.
Sincerely,
9X;� ���
I have no objection to the proposed project as described in this correspondence.
I have objection to the project as presently proposed and have enclosed comments.
(Signature)
(Date)