Loading...
HomeMy WebLinkAbout27581_NC DOT_20010223Your project is subject to the NC: Division oT Water Quality Neuse River Buffer Rules due CAMA and DREDGE AND FILL to its location within the Neuse River Basin. Please contact Deborah Sawyer at 27581 ' GL N L K A L 252-946-6481 PERM I T as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Applicant Name Phone Number t Address City State zip Project Location (County, State Road, Water Body, etc.) Type of Project Activity PROJECT DESCRIPTION SKETCH Pier (dock) Length Groin Length number Bulkhead Length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. (SCALE: i,, ) applicant's signature permit officer's signature issuing date expiration date attachments application fee DEPARTMENT OF TRANSPORTATION DIVISION 02 OFFICE P. O. BOX 1587 GREENVILLE, NC 27835 Pay DATE 01/24/2001 66-1059 STATE TREASURER, RALEIGH. NORTH CAROLINA 531 PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM ,r y,.,.,.,errrrr* y,.,�•rr r♦,.,.♦,...r•s♦v��s,• v♦ f��10-0- Pay N.C.D.E.N.R. the GREENVILLE, NC 27835 Order of nuuunirusuani nt ii'000084 3 711' j:0 S 3 L LO S94i: E01000-61, 2110 tSOP.O.T 10+00 P, p .T, rlA 42' DOE 4-- TO SR- 14:.2 1 CCASS.II R1P RAP PF-R►\17 STATuS FILL IN WATERS = NONE FILL IeJ WETLANDS = NONE 4VG DAILY FLOw = 14.85 C.O. E. NATiOv11ofIDE 03 C. A. M. A . AP,o/go(/Az RFQ .' D rE% n 2 ® 35 ' PRE S-00- GORED 5L A8 CL.A55 jr /1 R,PRAP S1.9 P0.T. (P K) 124-00 P. i CP0 BURIED jVALT&A L.IAO Z — TO SR- /Oo3 ---Op CRRVeN CovNTY gR%DGE NO. Cil 5R- NO, 14024 SwIFr GREE/< SCAL.— ", SO E10121Z srA . 10-t 33 , 90*sK9w 2 ® 3S' PRE57'REsSeD S4AI3 CR. GR. EL. 99.5 0 0 rn w Ex. GR.� N. G .tom Nw2SEc.. 9�.4 5 6PF I o BPF 44 6PF 200 13P>: CRAVEN COUNTY 6R. 3c 1'1 5R 1 b24 3 SPA>a Ex i sT. Z- o.a. CRE0, 71 M EX iSz . AREA - 322. SQ. FT. PROP. AP -EA = 404 5Q.F1. 1"=1�V6RT. /Ezi5riN4 IooYR. E)-, I0C> 1 rPRop. YR. EL. /00.8 t � LRMW9T.i�. DP-SiGr,1 HW,oEt.98.0 OVERT-ap wc, SCOUR 12 81P� I OVER TOPPI�4 G INFO • 35 6PF e L 99.5 FREQ 25 YR bo ePc D'S. 1450 C.F.S• 200 BPF 3 4 5 6 r0 zs }L �, B F A U F O R T C O U N T Y 100 17_ 1 v! ry 162, \ 1 n79, e 1 —\, f (RAUEAJ Cvv t ,5 29 Z 23 ] \ C63 r .\ <, a7y P 6 22 =' \ 161 INe'p 'oaf �� B I G P 0 C 0 s I N 1024 t� ` a. ^ 1472 = ti / -16 1,- C56 ` ,6 Op] bad \`13L�y le 35 _ 1 —'ply "" 38 P102 Ar ,'7 7 rOL v�OR 7� a IAM �N- O/ 1�e1 iaw HolyOL Hitl'T P 39 1.1 14=3 f,S Perfection ?-a 5 .9 T—Y c u_rter C51� `1_al 18 1 -6 Prle Tras c yA Ie]] P 213 I,\ 27 26 P25 ,1 I 16H f(f 20 ) ,,� 1631 la]v 7,i '`� Fan1A 62 0� low 16lo r I r '?� 1a] /7 i.7 E 1.7 b rsz 21 20 �A 5 It, 64 oil / lle7 1t� a ( 1a� ~ --- / Hope ti 96 Isle cl' - S i m, '•4 :i^_ a• 44— o' I ! 117 183 A.kel Kit Swmep - 11 1620 1 7� Ck 0 INSET r209 13 " ,. La e'��!' � vll�e f 1 1f H �•' Zo 1G13 I 'S . 1611 — Rory 13 a!.7 1 �. - ,.IN, 207 1.{. Corner � ^ 17 �O 1613 1.z l:mo 34_'s��� w 124" X e' lase 14W � por.sl loo RIVER N 1.6 _ a o ss , $ROG �o Upper Uvv<r N �t� ae ' � �� ���� � D8O028 F� � 8RIDGE MAINTENANCE UNIT RUN DATE 05/20'r`'�. DATA ON EXISTING STRUCTURE � '-�-------------'_--'--------------------------------- � .| DI --------------------- COUNTY: DIV ST./ STRUCTURE NUM8ERi CRAVEN LENGTH: 52 FEET 02 2 24�17 --------______________________________________________--_ � ROUTE CARRIED: FEATURE INTERSECTED: ----- ---------------- SR1624 LITTLE SWIFT CREEK LOCATED: ------------------------------ ' BRIDGE NAME: ----------------------------- ------------------ -------------------------- BUILT! BY: PRO& FED -AID PROJ: DESIGN LOAD: TIMBER FLOOR ON TIMBER JOIShr.; --------------------------------------------------------------------- --------------------------------------------------------------- BEAMS OR GIRDERS: 10LINES 6X16TIMBER JOISTS @ VARYING CTS. ___________ --------------------------- FLOOR: ENCROACHMENTS/ DECK (----------------- 4X8 TTM/NO AWS u»| /O OUT): -------------------------- ___________________________'__________ 020.2 CLEAR ROADWAY: BETWEEN RAILS/ SIDEWALK OR CURB: -------------- O19.2__. . � 019_.8_______LT_O0.3 RT 00.3 � VERT.CL.OVERi VERT.CL' UNDER/ HOR CL UNDER -----SPECIAL------PERMIT----:-- � 99 FT 99 IN 00 FT OO IN --' L_______________________________ �O'0 FT C-1 _r-------------------------------- INV.RTS.: OPE.RTG.i CONTR.iMEM8ER: POSTED/ ----------- ------ HS-_15----_HS-______ __ _____ 20.'JOIST INT.SV29TTST38_DATE 03 18 1997 -_-- --------------- SYSTEM: GREEN LINE ROUTE: 5 SECONDARY NO ------------------ ------------------------------------------------ _�ND OPENING� 3RD OPENIMG� 4TH OPENING/ 5TH--- OPENING/ ------- ----_--- ---- -------- ---- _------- '--- -------- |- ------'--------'----------------------------------___ � REMARKC� ---------------------- Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major h Permit, Form DCM-MP-l. Be sure to complete all i. other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public X Private b. Type of bridge (construction material) Concrete and Steel c. Water body to be crossed by bridge Little Swift Creek d. Water depth at the proposed crossing at MLW or NWL 5' e. Will proposed bridge replace an existing bridge? X Yes No If yes, (1) Length of existing bridge 52' (2) Width of existing bridge 20.2' (3) Navigation clearance underneath existing bridge 7' (4) Will all, or a part of, the existing bridge be removed? (Explain) Entire Bridge will be removed and replaced. Existing bulkhead will be cut at NWL and left to contain Rip Rap that will be placed at each end. f. Will proposed bridge replace an existing culvert(s)? Yes X No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge 70' r-E8 0 5 2009 Width of proposed bridge 30' Height of proposed bridge above wetlands 7' j. Will the proposed bridge affect existing water flow? X Yes No If yes, explain Bridge will be longer to allow more water to pass at higher water levels. k. Navigation clearance underneath proposed bridge 7' 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes X No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes X No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes X No If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert is to be placed b. Number of culverts proposed c. Type of culvert (construction material, style) d. Will proposed culvert replace an existing bridge? Yes No If yes, (1) Length of existing bridge N/A (2) Width of existing bridge N/A Revised 03/95 Form DCM-MP-5 F F$ 0 5 2 0 01 (3) Navigation clearance underneath existing (3) Amount of material to be excavated in cubic bridge N/A yards (4) Will all, or a part of, the existing bridge be removed? (Explain) N/A c. Will the placement of the proposed bridge or culvert require any highground excavation? e. Will proposed culvert replace an existing culvert? X Yes No Yes No If yes, If yes, (1) Length of area to be excavated 18' (1) Length of existing culvert (2) Width of area to be excavated 24' (2) Width of existing culvert (3) Amount of material to be excavated in cubic (3) Height of the top of the existing culvert above yards 112 cu. Yds. the MHW or NWL (4) Will all, or a part of, the existing culvert be d. If the placement of the bridge or culvert involves removed? (Explain) any excavation, please complete the following: (1) Location of the spoil disposal area f. Length of proposed culvert' Temporary spoil area is existing road bed g. Width of proposed culvert (2) Dimensions of spoil disposal area 20' x 20' h. Height of the top of the proposed culvert above the (3) Do you claim title to the disposal area? MHW or NWL X Yes No If no, attach a letter granting permission from i. Will the proposed culvert affect existing water flow? the owner. Yes No (4) Will the disposal area be available for future If yes, explain maintenance? X Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? j. Will the proposed culvert affect existing navigation Yes X No potential? Yes No If yes, give dimensions if different from (2) If yes, explain above. (6) Does the disposal area include any area below the MHW or NWL? Yes X No 3. EXCAVATION AND FILL If yes, give dimension if different from No. 2 above. a. Will the placement of the proposed bridge or culvert e. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? result in any fill (other than excavated material X No described in Item d. above) to be placed below _ _Yes If yes, MHW or NWL? Yes X No (1) Length of area to be excavated If yes, (2) Width of area to be excavated (1) Length of area to be filled (3) Depth of area to be excavated (2) Width of area to be filled (4) Amount of material to be excavated in cubic (3) Purpose of fill yards b. Will the placement of the proposed bridge or culvert require any excavation within: Coastal Wetlands SAVs Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: Coastal Wetlands SAVs X Other Wetlands If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill Revised 03/95 Form DCM-MP-5 g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? Yes X No If yes, (1) Length of area to be filled (2) Width of area to be filled (3) Purpose of fill 4. GENERAL a. Will the proposed project involve any mitigation? Yes X No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes X No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes X No If yes, explain in detail d. Will the proposed project require any work channels? Yes X No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Silt fence f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Typical Bridge construction equipment g. Will wetlands be crossed in transporting equipment to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? X Yes No If yes, explain in detail RipRap will be placed at the ends of the bridge NCDOT-Craven # 17 Applicant or Project Name Signature / /o / Date FLES 0 5 2001 Revised 03/95 CERTIFIED MAIL RETURN RECEIPT REQUESTED _ 1 /24/2001 (Date) Thurman & Paulette Guion Smith _311 Bragg St. NE_ Wilson, N.C. 27893 Dear Mr. Smith F ES 0 5 2001 This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation plans to construct a _2 @ 35' Prestr. Cored slab ( Replace existing bridge) onsite of his/her property located SR 1624 in Craven County. The sketch attached accurately depicts the proposed construction. Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to: Mr. Scott Jones N.C. Dept. of Environment and Natural Resources Morehead City District Division of Coastal Management 151-B Hwy 24 Hestron Plaza II Morehead City, City N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Sincerely, I have no objection to the proposed project as described in this correspondence. I have objection to the project as presently proposed and have enclosed comments. (Signature) (Date) CERTIFIED MAIL RETURN RECEIPT REQUESTED _ 1 /24/2001 _Jerry T. & Joanne Norman 3230 Hillneck Road Ernul, N.C. 28527 Dear _Mr. Norman (Date) FEB 0 5 2001 This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation plans to construct a _2 @ 35' Prestr. Cored slab ( Replace existing bridge) onsite of his/her property located SR 1624 in _Craven County. The sketch attached accurately depicts the proposed construction. Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to: Mr. Scott Jones N.C. Dept. of Environment and Natural Resources Morehead City District Division of Coastal Management 151-13 Hwy 24 Hestron Plaza II Morehead City, City N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Sincerely, I have no objection to the proposed project as described in this correspondence. I have objection to the project as presently proposed and have enclosed comments. (Signature) (Date) SENDER: ■ Complete it. 1 and/or 2 for additional services. M - ■ Complete 'items 3, 4a, and 4b. ■ Print your name and address on the reverse of this form so that we can return this card to yyou. ■ A�ttaatchh tltia torn to the front of the mailplece, or on the back if space does not Perry* ■ Write "Retum Receipt Requested'on the mailpiece below the article number. t ■ The Return Receipt will show to whom the article was delivered and the date delivered. 3. Article Addressed to: 4a. Article Number i'C'C' - f li 4b. Service Type S Thurman and Paulette Guion Smith ❑ Registered 4 3 I I Bragg Street, NE Wilson, NC 27893 W 6. Signature: � I or ❑ Express Mail ❑ Return Receipt for Merchandise 7. Date of Deljver� l L— - I also wish to receive the following services (for an extra fee): 1. ❑ Addressee's Address 2. ❑ Restricted Delivery Consult postmaster for fee. 0 Certified ❑ Insured ❑ COD 8. Addressee's Address (Only if requested and fee is paid) -n Receipt UNITED STATES POSTAL SERVICE �! First -Class Mail '1 Postage & Fees Paid M usPs O Permit No. G40- ................__...._._...._............_ � _.�.;...,6pa1.... _. _,___ ., ...... _..�.....,.._.._,_, _,..,. I • Print your he addrs, and ZIP Code in this box } i N. C. Dept. of Transportation } s P. O. Box 1587 Greenville, NC 27835-1587 �s, a113��1it,t,ts11,�4�I„�IIIIItill III till till{�t�til�ll�li� SENDER: ■ Complete Remo 1 and/or 2 for additional services. f M ■ Complete items 3, 4a, and 4b. ■ Print your name and address on the reverse of this form so that we can return this card to you. ■ pAtttacchh this torn to the front of the mailpiece, or on the back if space does not m ■ write 'Retum Receipt Requested' on the mailplace below the article number. ■ The Return Receipt will show to whom the article was delivered and the date delivered. I also wish to receive the following services (for an extra fee): 1. ❑ Addressee's Address 2. ❑ Restricted Delivery Consult postmaster for fee. ty ? a 3. Article Addressed to: 4a. Article Number v9qPMZ j4b. Robbie Howard Toler Service Type S 3075 Auroa Road ❑ Registered Emul, NC 28527 ❑ Express Mail P-RRwn Receipt for Merchandise ( Date of elivery PS Form By: (Print Name) _ 18. Addressee's Ad and fee is paid) or 7 U . i 11, December 1994 3 %9 E '; 4 Certified 'J 0 Insured V y to2595-9a-a-o2-- Domestic Return Receipt UNITED STATES POSTAL • Print rOER First-Class Mail Postage & Fees Paid USPS Permit No. G-10 and ZIP Code in this box • N. C. Dept. of Transportation P. O. Box 1587 Greenville, NC 27835-1587 l� 5(Z� to q w' i ;'�� 1��1f11��►11��l„ll��i�i���,11�i,l,I,�Li<<�li�►I�t�Ii f I I i SENDER: I also wish to receive the ■ Complete items 1 and/or 2 for additional services. ■ Complete items 3, 4a, and 4b. fOIIOWIn services for an g ■ Print your name and address on the reverse of this form so that we can return this extra fee): card to you. ■ this form to the front of the mailpiece, or on the back if space does not 1. ❑ Addressee's Address pAttach ■ Wen el t"Return Receipt Requested'on the mailpiece below the article number. 2. El Restricted Delivery ■ The Return Receipt will show to whom the article was delivered and the date delivered. Consult postmaster for fee. a 3. Article Addressed to: Robbie Howard Toler 3075 Aurora Road Emul, NC 28527 5. eceived By: (Print Name) _r 6. lgnature: (Addressee or Agent) x PS Form 3811, December 1994 4a. Article Number 9 .70r9 g1j)j.,'sgy6 4b. Service Type E ❑ Registered Certified 9 ) ❑ Express Mail ❑ Insured c ❑ ceipt for Merchandise TEIC7 \ I � 7. ate of elivery 8. Addressee's Address (Only if re ested Y and fee is paid) 102595-98-B-0229 uomestic Heturn Hecelpt UNITED STATES POSTAL SERVICE • Print your N N� PMr� II II driEw nd ZIP N. C. Dept. of Transportation P. O. Box 1587 Greenville, NC 27835-1587 8-: S+i Fa,` --f [ Permit No._GV-- SENDER: I also wish to receive the ■ Complete items 1 and/or 2 for additional services. ■ Complete items 3, 4a, and 4b. following services (for an ■ Print your name and address on the reverse of this form so that we can return this extra fee): card to you. • Attach this form to the front of the malipiece, or on the back if space does not 1. ❑ Addressee's Address Zino ■Write "Return Receipt Requested"on the mailpiece below the article number. 2. ❑ Restricted Delivery ■ The Return Receipt will show to whom the article was delivered and the date Consult postmaster for fee. delivered. 3. Article Addressed to: 4a. Article Number C'q j )UD CDO _Z of �555-3 4b. Service Type Jerry T. and Joanne Norman 3230 Hillneck Road ❑ Registered] Certified ❑ Express Mail ❑ Insured Ernul, NC 28527 ❑ Return Receipt for Merchandise ❑ COD 7. Date of Delivery 5. Received By: (Print Name) 8. Addressee's Address (Only if requested and fee is paid) 6. Si ture: (Adore see gent) PS Fo 3811 December 114194 10259e-98-13-0229 Domestic Return Receipt UNITED STATES POSTAL SERVICE �G U, 1 .• .�� f • Print your name, address, and ZIP Cod i�, is bb1 JvWSJ S%,I le N. C. Dept. of Transportation P. O. Box 1587 Greenville. NC 27835-1587 I{IIlII11lIIIIIt11IIIIIII11fIIIIIiIiI1lIlIlIlII11IlIi11IIFI1tI Mail Fees Paid CERTIFIED MAIL RETURN RECEIPT REQUESTED _ 1 /24/2001 Robbie Howard Toler _3075 Aurora Road _Ernul, N.C. 28527 (Date) FFQ 0 5 2001 Dear Mr. Toler This correspondence is to notify you as an adjacent riparian landowner that the North Carolina Department of Transportation plans to construct a _2 @ 35' Prestr. Cored slab ( Replace existing bridge) onsite of his/her property located SR 1624 in _Craven County. The sketch attached accurately depicts the proposed construction. Should you have objections to the proposed construction, please check the appropriate statement below, sign, date, and return as soon as possible to: Mr. Scott Jones N.C. Dept. of Environment and Natural Resources Morehead City District Division of Coastal Management 151-B Hwy 24 Hestron Plaza II Morehead City, City N.C. 28557 Written comments must be received by the Division of Coastal Management within 10 days of receipt of this notice. NO RESPONSE WITHIN 10 DAYS of receipt of the correspondence will be INTERPRETED AS NO OBJECTION. Sincerely, 9X;� ��� I have no objection to the proposed project as described in this correspondence. I have objection to the project as presently proposed and have enclosed comments. (Signature) (Date)