HomeMy WebLinkAbout27582_NC DOT_20010223your project is subject to the NC Division of 1N '
Ater r� r Qualtty Neuse Rive B ff R 1
r u er u es due
CAMA and DREDGE AND FILL to its location within the Neuse River Basin. 275$2.
G
E
N
E R
A Please contact Deborah Sawyer at
P
E
R
M
252-946-6481 r .;
IT
as authorized by the State of North Carolina
Department of Environment and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC
Applicant Name
Address
City State
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
Phone Number
zip
PROJECT DESCRIPTION SKETCH
Pier (dock) Length
L
s'L
_
(SCALE:
"
(. ._
)
L
Groin Length
number
Bulkhead Length
max. distance offshore
N
.t
i
l i
v
aL
i 4
-
s;
I
I
—
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other
„
(�
�.
i
-
I
This permit is subject to compliance with this application, site drawing
and attached general and specific conditions. Any violation of these terms
may subject the permittee to a fine, imprisonment or civil action; and
may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit of-
ficer when the project is inspected for compliance. The applicant certi-
fies by signing this permit that 1) this project is consistent with the local
land use plan and all local ordinances, and 2) a written statement has
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work.
In issuing this permit the State of North Carolina certifies that this project
is consistent with the North Carolina Coastal Management Program.
issuing date
applicant's signature
permit officer's signature
expiration date
attachments
application fee
DEPARTMENT OF TRANSPORTATION
DIVISION 02 OFFICE
P. O. BOX 1587
GREENVILLE, NC 27835
Pay
Pay N.C.D.E.N.R.
tothe GREENVILLE, NC 27835
Order of
6R P � 2 76A-a
DATE 01/23/2001
66-1059 STATE TREASURER, RALEIGH, NORTH CAROLINA
531 PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM
» r r» r r rt r r r» r rt»» r»» r» rt r rt» rt r r» r» rt» r» r»
116000084 3 Silo j:0 S 3 L j0 S94i: 911100011164 21"
A1i111OH LI: 11 SIGNATURE
Form DCM-MP-5
BRIDGES AND
CULVERTS
Attach this form to Joint Application for CAMA Major h.
Permit, Form DCM-MP-1. Be sure to complete all i.
other sections of the Joint Application that relate to this
proposed project.
1. BRIDGES
a. Public X Private
b. Type of bridge (construction material)
Concrete and Steel
c. Water body to be crossed by bridge
Little Swift Creek
d. Water depth at the proposed crossing at MLW or
NWL 7'
e. Will proposed bridge replace an existing bridge?
X Yes No
If yes,
(1) Length of existing bridge 71'
(2) Width of existing bridge 20.1'
(3) Navigation clearance underneath existing
bridge 6'
(4) Will all, or a part of, the existing bridge be
removed? (Explain) Entire Bridge will be
removed and replaced. Existing bulkhead
will be cut at NWL and left to contain Rip
Rap that will be placed at each end.
f. Will proposed bridge replace an existing culvert(s)?
Yes X No
If yes,
(1) Length of existing culvert
(2) Width of existing culvert
(3) Height of the top of the existing culvert above
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
removed? (Explain)
g. Length of proposed bridge 95'
FED 0 5 2001
Width of proposed bridge 30'
Height of proposed bridge above wetlands
6'
j. Will the proposed bridge affect existing water flow?
X Yes No
If yes, explain Bridge will be longer to allow more
water to pass at higher water
levels.
k. Navigation clearance underneath proposed bridge
6'
I. Will the proposed bridge affect navigation by
reducing or increasing the existing navigable
opening? Yes X No
If yes, explain
m. Will the proposed bridge cross wetlands containing
no navigable waters? Yes X No
If yes, explain
n. Have you contacted the U.S. Coast Guard
concerning their approval?
Yes X No
If yes, please provide record of their action.
2. CULVERTS
a. Water body in which culvert is to be placed
b. Number of culverts proposed
c. Type of culvert (construction material, style)
d. Will proposed culvert replace an existing bridge?
Yes No
If yes,
(1) Length of existing bridge N/A
(2) Width of existing bridge N/A
Revised 03/95
Form DCM-MP-5
(3) Navigation clearance underneath existing (3) Amount of material to be excavated in cubic
bridge N/A yards
(4) Will all, or a part of, the existing bridge be
removed? (Explain) N/A c. Will the placement of the proposed bridge or culvert
require any highground excavation?
e. Will proposed culvert replace an existing culvert? r200X Yes No
Yes No If yes,
If yes, (1) Length of area to be excavated 12'
(1) Length of existing culvert (2) Width of area to be excavated 24'
(2) Width of existing culvert (3) Amount of material to be excavated in cubic
(3) Height of the top of the existing culvert above yards 75 cu. Yds.
the MHW or NWL
(4) Will all, or a part of, the existing culvert be
d. If the placement of the bridge or culvert involves
removed? (Explain)
any excavation, please complete the following:
(1) Location of the spoil disposal area
f.
Length of proposed culvert'
Temporary spoil area is existing road bed
g.
Width of proposed culvert
(2) Dimensions of spoil disposal area
20' x 20'
h.
Height of the top of the proposed culvert above the
(3) Do you claim title to the disposal area?
MHW or NWL
X Yes No
If no, attach a letter granting permission from
i.
Will the proposed culvert affect existing water flow?
the owner.
Yes No
(4) Will the disposal area be available for future
If yes, explain
maintenance? X Yes No
(5) Does the disposal area include any coastal
wetlands (marsh), SAVs, or other wetlands?
j.
Will the proposed culvert affect existing navigation
Yes X No
potential? Yes No
If yes, give dimensions if different from (2)
If yes, explain
above.
(6) Does the disposal area include any area below
the MHW or NWL? Yes X No
3.
EXCAVATION AND FILL
If yes, give dimension if different from No. 2
above.
a.
Will the placement of the proposed bridge or culvert
e. Will the placement of the proposed bridge or culvert
require any excavation below the MHW or NWL?
result in any fill (other than excavated material
X No
described in Item d. above) to be placed below
_ _Yes
If yes,
MHW or NWL? Yes X No
(1) Length of area to be excavated
If yes,
(2) Width of area to be excavated
(1) Length of area to be filled
(3) Depth of area to be excavated
(2) Width of area to be filled
(4) Amount of material to be excavated in cubic
(3) Purpose of fill
yards
b. Will the placement of the proposed bridge or culvert
require any excavation within:
Coastal Wetlands _ SAVs _ Other Wetlands
If yes,
(1) Length of area to be excavated
(2) Width of area to be excavated
f. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed within:
Coastal Wetlands SAVs X Other
Wetlands If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
Revised 03/95
Form DCM-MP-5
g. Will the placement of the proposed bridge or culvert
result in any fill (other than excavated material
described in Item d. above) to be placed on
highground? Yes X No
If yes,
(1) Length of area to be filled
(2) Width of area to be filled
(3) Purpose of fill
4. GENERAL
a
Will the proposed project involve any mitigation?
Yes X No
If yes, explain in detail
If yes, explain in detail RipRap will be placed at
the ends of the bridte
NCDOT-Craven # 20
Applicant or Pro' Name
Signature
Date
b. Will the proposed project require the relocation of -
any existing utility lines? Yes X No
If yes, explain in detail
c. Will the proposed project require the construction of
any temporary detour structures?
Yes X No
If yes, explain in detail
d. Will the proposed project require any work
channels? Yes X No
If yes, complete Form DCM-MP-2
e. How will excavated or fill material be kept on site
and erosion controlled? Silt fence
f. What type of construction equipment will be used
(for example, dragline, backhoe or hydraulic
dredge)? Typical Bridge construction equipment
g. Will wetlands be crossed in transporting equipment
to project site? Yes X No
If yes, explain steps that will be taken to lessen
environmental impacts.
h. Will the placement of the proposed bridge or culvert
require any shoreline stabilization?
X Yes No
FE$ 0 5 2001
Revised 03/95
5�A• S+ pD P.O.T.
JosePH £ L1NDP, M. Thor As
P.O. Sox 337
CRgVEsIJ '(.o�NTY
$R►DCa� �o. 020
SR No. 162.1
SCOvLE l"=SO' NoRLZ.
�•_ �o' vtszt
syA, ofS3 7
5P14,us = /0 a6- s11sj i��srCo'rej
��.LEA . 8
flRfl
E.0. R. S7P- , ID ' i I.70 PAo Egos 2852-�
P K. NAI LUt�
STA.12+5C
&NI FT
CREEK
�35—�
SR 1(o27 0BST ' i S 30" E 7
T- —' =--� - 5q-la
To S R 1611
' `� �Cr`_1yCL R,D RA
a5Fit i
TgPI�
/ / THom4,s �uGENE
N
t?.D.B.rTA:(0�-00 1; �RUut., N.C. 2SS2i
PK � A1`
a
N
Ln
C1
LJ
L
EX 15TIIAca 0RI AG!"
CRpwF-tj Country
Bp a),a i,a Flo. ao
N,v L
Etc 15T I N CG L NC-.fr"
41 G HT CPOW,�..r . 6 tR.,p.7.J
P/ofmAL T12
GNU°
SeA LZ
R2oPO5Ep 02%E>eE
IVOA
PROPOSED t e vj aT �A : ()5' I
SPANS', I®25'; 1045', 1025'
su?Eesrkucru,eF : Pms-nee5scn
SJ'gS7i@VCT'UfeC- ' 5rEEL ~H "lo/CE ; f>E'EST,eFs�ED CAP
Ne- I G7 C1'OWN 7-6 ITT : /31
WArt- Z-DEPTr,i ; 7�
F,--3 0 5 2001
L; ,!:,c0 V/P-,eAP
Fxlsr"V(s i uLk'If6 y b
CRAVEN Cou"TY
ap1nc� uo. 20
Sp -.No. UO2-q
L1TTLJ& Swi FT CL3FSK
L.W-AT Io►o: p, to M I. S. SCT, SR- I1621
a CA LE ; E ".r C�10'
alll6t P?-
3
4
5
'c
.
$
B
E A U F O R T C O U
N T Y
L
\
73
- 100----
__ __
C=)____--
Wes.,
17
/
Ll
J
23
C63
u]
�iCN c�UNT7
22
! b
�
�
�Z
B ! C P 0 C O S ! :V
lal
t�
16 �
lC.r—
I
/
-
o
♦
1003
/
la
a
CJ 56
7
17 16
r
31
35 ,,.
J"tt
I
1424'�
I
its
P102
1453
♦. 1.,I A 1 � � IIo1M 1117'T'
a` P,
P 213 -27 26 �25
64
'
..1183
9�
1�
205 ) ..
INSE
r4.MSa1.n
1 �4 11.1
�/— _
) J� I i•
!i£ —
B
1.6
as
1614
1617 13
L
cu
207
.`�, .9
Row
/
f\\
I.ian
"`muse
17
14-M
'""°°I a,.
9 - � 65 i
�
po
7.
, 14
�
�
Pt f 55
:.:
k� Ycrf°r
- -
I a . < •]]
12
124 `
161
uCOR •-' • BIOatI/
~I
6 .S . y 7,6 C4!
Ia Fast
/ .6 14
f/ /l 49
et
vf«,;rn l., 1..: s , 60 -
�' ` �
i'1 +
t`y
,
ll//•.i/ SS •9
.'
RIVER-
a 1y
34 ']
q Y
_ C51
1
V 14P
f
•
/
i
M
xuN uo/t o4/1j/YY
DATA ON EXISTING STRUCTURE
---------------------------------------------------------'-------------------
. COUNTY: DIV.: DIST.: STRUCTURE NUMBER: LENGTH:
CRAVEN0222402071FEET
______________________________________________________----
ROUTE CARRIED: FEATURE INTERSECTED:
SR1627
LITTLESWIFTCREEK
________________________________--____________________________
LOCATED:
BRIDGE NAME:
0.6 MI.S.JCT.OF SR1621 ------------------------
'----------------------------------------------------------------------------
FUNC. CLASS: SYST.ON: SYST.UNDER: ADT & YR; RAIL TYPE:
LR
_______________________NONFA-----90 96LT227RT227
___________________________
--
BUILT: BY: PROJFED.AID PROJ, DESIGN LOAD:
1954 BMU ---------
------------ OTH-UNKN
----------------------------------------------------------------------------
REHAB: BY: PROJ: ALIGNMENTi SKEWi LANES/
---- —'--- --------- TAN 090 ON 02 UNDER 00
------------------------------------ ---_------_---_--------_------_------_-
NAVIGATION: HT, CRN.TO 8ED: WATER DEPTH:
VC --- FT I. -IC .... -.... - FT 13 FT 7 FT
---- -------- ----- ------- -------------------------------------------------- --
SUPERSTRUCTURE:
TIMBER FLOOR ON I-BEAMS(STD.8MD-8)
----------------------------------------------------------------------------
SUBSTRUCTURE/
E8TS&I8T:TIM8ER CAPS ON TIMBER PILES @ VAR. CENTERS
--------- ----__-_'----------_----_------------------_-----------------------
SPANS:
1@35'7'1035'5
-------_----------_-------------------------_----_-----------------���������
BEAMS OR GIRDERS:
8 LINES 7X16 I -BEAMS @VAR.CENTERS
---_----------------------------------------------------__--------_---------
FLOOR: ENCROACHMENTS: DECK (OUT TO OUT)/
4X8 TIM/NO AWS --�
------------- 02O.1
----_--
---_-----_-_--_--_
--------_---------------------------------_--------
CLEAR ROADWAYi BETWEEN RAILS: SIDEWALK OR CURB:
019.1 019 .8 LT 00.4 RT 00.4
------- --------------- ----------- -------------'-----------------------------
VERT.CL.OVER/ VERT.CL.UNDER/ HOR.CL.UNDER: SPECIAL PERMIT:
99 FT 99 IN OO FT OO IN 00.0 FT 8-2
'---------------'-----------------------------------------------------------
JNV.RTG.OPE.RTG.CONTR.MEMBER: POSTED/
HS- 8 HS--- 13 BEAM INT. SV 16 TTST 20 DATE 10 01 1981
'---------------------------------------------------------------------------
SYSTEM/
GREEN LINE ROUT[:
5 SECONDARY '
NO
-------------------- ------------------------------------------------ ------- -
2ND OPENING: 3RD OPENING: 4TH OPENING: 5TH OPENING:
---- -------- ---- -------- ---- -------- ---- --------
'------------------------------- -------------------------------------------
REMARKS:
------------------------------------- .......
----- ----------------- --
-`—`----- ------`------------`----------' ----------- -----------
---------------------------------------------------------------------'-----
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
r p'eIL. 23 , 1999 (DATE)
MR, AND MR�, Tpa6,PH T"DMAS
P. 0. T6QK FEB 0 5 2001
UQNCE 3oRo N.(' 2g58�
DEAR MR. THDMAS
This correspondence is to notify you as an adjacent riparian landowner
that Mr./Mrs. ,C, ,O,T. plan(s) to construct a 3SPPN CoN�.R-Tf
property located' 4� I®2S� COREO SLAB onsite of is her
P P Y �R�DGE GR6AT SWAMP RoAD
in CRAVEN County. T e sKetch attached accurately depicts the
proposed construction.
Should you have no objections to the proposed construction, please check
the appropriate statement below, sign, date and return as soon as possibly
to.
MR. H.K.HARRISON
P•0. Box 721
WiUiNMSToo , N.0 2'1a92
Should you have objections to this proposal please send your written
comments to MR. SCdTT TONES Division of Coastal Management at
STRow R_AZ 11 51 B H .jy, 24 MDREH A CITY, N.C, 28 55 1
Written comments must be received by the Division of Coastal Manage-
ment within 10 days of receipt of this notice.
NO RESPONCE WITHIN 10 DAYS of receipt of the correspondence will be
INTERPRETED AS NO OBJECTION.
Sincerely,
e,e7c;E 7 S
I have no objection to the porposed project as described in
this correspondence.
I have objections to the project as presently proposed and
have enclosed comments.
(Signature)
(Date)
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
u
MAY 14) 1')q9 (DATE) �Qw
V�
MR. T"ompe E,uG 1E ToLER
Z WIND - ZV,MMeV_ L_P, NE FEB 0 5 2001
-- (S19,EENV%u_e 5. C. 29(,IN
DEAR MR. ToLER
This correspondence is to notify you as an adjacent riparian landowner
that Mr./Mrs. N,C.D.O.T. plan(s) to construct a -3SPPN G MP,PeTE
BVk1VC'T_-• 1® 25', 104S'J0z5' CORED Suqg SPANS onsite of his/her
property located -BRIDGE NUMBER 020 ON SR- 162-7 GREAT ',;WA"P RpAo
in CRAVr.'TJ County. The sketch attached accurately depicts the
proposed construction.
Should you have no objections to the proposed construction, please check
the appropriate statement below, sign, date and return as soon as possible
to:
R. IF, BPIRNETTE-
P.O. ?__'O I
NEW bERtJ , N.0 . ZSS63
Should you have objections to this proposal please send your written
comments to MR. SCUTT SptJ=S Division of Coastal Management at
PL LA -B Hwy. 24 MO E EA CiT N . C. 2,165Si
Written comments must be received by the Division of Coastal Manage-
ment within 10 days of receipt of this notice.
NO RESPONCE WITHIN 10 DAYS of receipt of the correspondence will be
INTERPRETED AS NO OBJECTION.
Sincerely,
SRIDyE.TRANS. SvpsRV►soRl-
I have no objection to the porposed project as described in
this correspondence.
I have objections to the project as presently proposed and
have enclosed comments.
(Signature)
(Date)
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
'41D21L. 23., 1999 (DATE)
_MR. `THoMR UG&-NE `rQLP-1 , F'E8 05 200,
US "Wy, 11 N
F-RNy L N. C. 2 8 5 2-rl
DEAR MR . 70 LE-2
This correspondence is to notify you as an adjacent riparian landowner
that Mr./Mrs. N,0, ,D,T, plan(s) to construct a 3SPAN (ANCRE-rT-
5' 1 ® 2S' CORED SLAB onsite of his/her
property located R1DG t�vN SR- 2'1 SWAMP ROAD
in CRAVE N County. The sketch attached accurately depicts the
proposed construction.
Should you have no objections to the proposed construction, please check
the appropriate statement below, sign, date and return as soon as possibl!
to:
MR. N,k•NARR►SON
P Box 12.1
WiLLINMSTON , N,C. 27892
Should you have objections to this proposal please send your written
comments to MR. SCOTT \Jc)t, F_c, Division of Coastal Management at
STRC)w Pt.AZ 11 , 151 • 8 14 wY. 24 MDREH AD CITY, N.C, 28 55 r7
Written comments must e receive y t e Division o Coasta hIanage-
ment within 10 days of receipt of this notice.
NO RESPONCE WITS{IN 10 DAYS of receipt of the correspondence will be
INTERPRETED AS NO OBJECTION.
Sincerely,
8,e cv; r S.
I have no objection to the porposed project as described in
this correspondence.
I have objections to the project as presently proposed and
have enclosed comments.
(Signature)
(Date)
SENDER:
I also wish to receive the
■ Complete items 1 and/or 2 for additional services.
- ■ Complete items 3, 4a, and 4b.
following (for an
0Wg services 1
■ Print your name and address on the reverse of this form so that we can return this
extra fee):
card to you.
■ Attach this form to the front of the mailpiece, or on the back if space does not
1. ❑ Addressee's Address
peun t.
■ Write 'Retum Receipt Requested'on the mailpiece below the article number.
2. ❑ Restricted Delivery
■ The Retum Receipt will show to whom the article was delivered and the date
delivered.
Consult postmaster for fee.
3. Article Addressed to:
Mr. James Alton Whitford
PO Box 3
Ernul, NC 28527
5. Received By:
— T
PS Form 3811, December 1994
4a. Article Number
4b. Service Type
El Registered Certified
❑ Express Mail ❑ Insured
❑ Return Receipt for Merchandise ❑ COD
7. Date of Delivery
8. Addressee's Address
and fee is paid)
,o2595-98-6-o2-�s Domestic Return Receipt
UNITED STATES POSTAL SERVICE fP.S'g'
A(py�n-1 & Fula
• Print your name, address, and ZIP Code in this
N �
1 � 7o"s&\ 5P,)Icao
N. C. Dept. of Transportation
P. O. Box 1587
Greenville. NC 27835-1587
1 1-ff 11 1 11 1 1 fl' 1 1 1 1 11 1 f 11 1 1
11111111111111tIIti11111111111111111111111111111111111 i 1111111
d SENDER:
■ Complete items 1 and/or 2 for additional services.
IA v Complete iterns 3, 4a, and 4b.
■ Print your name and address on the reverse of this form so that we can return this
card to you.
( ■ Attach this form to the front of the mailpiece, or on the back if space does not
PPermit.
■ W rite "Return Receipt Requested on the mallpiece below the article number.
1 O ■ The Return Receipt will show to whom the article was delivered and the date
delivered.
C
I also wish to receive the
following services (for an
extra fee):
1. ❑ Addressee's Address
2. ❑ Restricted Delivery
Consult postmaster for fee.
0 3. Article Addressed to:
4a. Article Number
0O9 3 oZ;ZD tbeA Y o3 55-?
4b. Service Type
Mr. Thomas Eugene Toler
❑ Registered XCertified
S 2 Wind -Jammer Lane
❑ Express snail ❑ Insured
Greenville, SC 29611
❑ Return Receipt for Merchandise ❑ COD
� _
7. Date of Delivery
C�L�i�
�
5. Re eived By: (Print Name)
8. Addressees Address (Only if requested
and fee is paid)
6. Signature: (Addressee or Agent)
X
a PS Form 3811, December 1994 102595-98-B-0229 Domestic Return Receipt
UNITED STATES POSTAL SERVICE First -Class Mail
Q n � C 2 vS[a fees.Ra+'
• Print your t4Wof ac-Wre and ZIPS o In • "`'�
20G\ i
J A4 -j-a kWVS&V. 5 e 16 1,!)
N. C. Dept. of Transportation
P. O. Box 1587
Greenville, NC 27835-1587
SENDER:
I also wish to receive the
■ Complete items 1 and/or 2 for additional services.
followin services for an
g
■ Complete items 3, 4a, and 4b.
■ Print your name and address on the reverse of this form so that we can return this
extra fee):
card to you.
■ Attach this form to the front of the mailpiece, or on the back if space does not
1. ❑ Addressee's Address
permR.
• Write 'Return Receipt Requested"on the mailpiece below the article number.
2. ❑ Restricted Delivery
• The Return Receipt will show to whom the article was delivered and the date
delivered.
Consult postmaster for fee.
3. Article Addressed to:
4a. Article Number
Mr. and Mrs. Joseph Thomas
PO Box 337
Vanceboro, NC 28586
5. Received By: (Print Name)
X
PS Form 381 December 1994
4b. Service Type
❑ Registered Certified
❑ Express Mail ❑ Insured
❑ Return Receipt for Merchandise ❑ COD
7. Date of Delivery
.-) S —C
requested
and fee is paid)
tozeas-se-B-o-q Domestic Return Receipt
3
UNITED STATES POSTAL SERVICE
First -Class Mail
Postage & Fees Paid
USPS
Permit No. G-10 7
• Print your name, address, and ZIP Code in this box •
J Ay TotJ�So,^
N. C. Dept. of Transportation
P. O. Box 1587
Greenville_ NC 27835-1587
1
fl „ !!t1
f i l l( l!!i i f I I I I I!! i f!! f!f!!
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
XPRIL 23 , 1999 (DATE)
M� • SflM6s AL.To N WN tTFORp
P, FE-3 U 5 2001
FR NU L- , N. C. 28�21
DEAR MR, WHITFORD
This correspondence is to notify you as an adjacent riparian landowner
that Mr./Mrs. ,(D,D,T. plan(s) to construct a 3SPP►N N16pr--Tf
BR ►D 1 +5 , 10 2S' CORP-0 Si.NZ onsite o his/her
property located RtDG T S JANiP RoAb
in CRAVE N County. I' e SKetch attached accurate y epicts the
proposed construction.
Should you have no objections to the proposed construction, please check
the appropriate statement below, sign, date and return as soon as possible
to.
MR. H,K.NARR►son�
P-O' BOx 121
InWiUiAMSTON , N C Z7592...
Should you have objections to this proposal please send your written
comments to MR. SCOT-T `SONES Division of Coastal Management at
sTRON PI.Az �t 1 .24 M E Cif N.C, 285-5
Written comments must ���t �e receivea oy the Division of Coastal Manage-
ment within 10 days of receipt of this notice.
NO RESPONCE WITHIN 10 DAYS of receipt of the correspondence will be
INTERPRETED AS NO OBJECTION.
Sincerely,
82ibc� r. S. ,JT-
I have no objection to the pooposed project as described in
this correspondence.
I have objections to the project as presently proposed and
have enclosed comments.
(Signature)
(Date)