Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
28014_NC DOT_20010615
CAMA and DREDGE AND FILL ,t G E N E R A L� �y.:� . P E R M I T as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC' Applicant Name L]CJ % i Phone Number �: - �'� - 77� © A ? c_ �" Address r /, City: �t.lc . State V' Zip78 Project Location (County, State Road, Water Body, etc.) hTvtl� <-0., /3 1��-- " t/1,i�C;r✓%1 �O [: J'I G. 1 jr i � ` � lt� � � / ti. Y' /� Type of Pro ectActivit t4 ) I� c.;�'� ��; ''�'t:�� d� c� �C y i r. � PROJECT DESCRIPTION SKETCH (SCALE: �t /A t%, ) Pier (dock) Length Groin Length �- number V e 1,�' f I -; C• f r Bulkhead Length max. distance offshore / .. , i_ ✓-71 iJ 1, 4 i!.1 11 1 4 . J Basin, channel dimensions cubic yards Boat ramp dimensions Other rP f�' 4F r I I& � 1 � � i! �•"t t I U 6 This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. / applicant's signature / permit officer's signature r issuing date expiration date attachments ! application fee DEPARTMENT OF TRANSPORTATION DIVISION 01 OFFICE P. O, BOX 850 EDENTON, NC 27932 Pay Pay NCDENR to the 943 WASHINGTON SQUARE MALL Order of WASHINGTON, NC 27889 DATE 03/23/2001 68-1059 STATE TREASURER, RALEIGH, NORTH CAROLINA 531 PAYABLE AT PAR THROUGH FEDERAL RESERVE SYSTEM ♦ r♦ M M I M Y y M M I M I I M I♦ M M M♦ M M M M M M I M M M I q� 11'0000 7 3 2 111- is0 5 3 1 10 5941: L..I0 0 0,,� 6 4 Lii' STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY June 5, 2001 Division of Coastal Management NC Division of Coastal Management N.C. Department of Natural Resources and Community Development 3411 Amedell Streeet P.O Box 769 Morehead City, NC 28557 ATTENTION: Mr. Bill Arrington, Coastal Field Representative SUBJECT: Request for Authorization of Bridge Replacement #4 on New Loop Road (SR 1302) in Hyde County under a General Permit .2300 The North Carolina Department of Transportation proposes to replace the aging Hyde bridge structure # 4 on New Loop Road (SR 1302) at Old State canal crossing with three 40 feet x 9.33 feet high x 6.25 feet wide corrugated aluminum pipe arches with headwalls (see figure 1 for example) The Old State Canal, a Public Trust Area of Environmental Concern, is typically a slow flowing stream 30-feet wide and about 3 feet deep. It is a potential secondary nursery area, but not a primary nursery area or outstanding resource waters. The replacement structure will be constructed along the existing alignment and would take about two weeks to complete. Based on the proposed design, the new road structure will be wider (+11.2 feet) with a more narrow canal channel (-10.05 feet) but will be able to allow for the same amount of water flow as the existing bridge (Q10=540 cubic feet/second). Department of Transportation plans to remove the old concrete abutements and pilings. The existing bridge bulkheads will remain in place. Sixty feet of shoreline will be widened a maximum of ten feet in order to provide better flow from one of the pipes. The pipes and headwall will be submerged about 2 feet below the original streambed. This widening and submerging the pipes will require excavation below the waterline of about 127 cubic yards of soil. 160 feet of shoreline will be stabilized with P.O. Box 850, Edenton, NC 27932 — Phone: (252) 482-7977 Fax: (252) 482-8722 Class II rip -rap and will extend no more than 10 feet waterward of the mean normal water contour. No wetlands will be impacted. Sincerely, Don Conner, PE Division Engineer -Division One l�ii��✓J� J Knsten Shacochis Division Environmental Officer Cc: Keith Harrison, Bridge Maintenance Mr. David Cox, NCWRC Ms. Sarah Winslow, NC DMF Mr. Ron Sechler, NMFS Mr. Tom McCartney, USFWS Mr. John Hennessy, NC DWQ Mr. Ted Sampson, NCDCM Ms. Gretchen Byrum, PE, NCDOT P.O. Box 850, Edenton, NC 27932 — Phone: (252) 482-7977 Fax: (252) 482-8722 Form DCM-MP-S BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES N/A a. Public Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at MLW or NWL e. Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? Yes No If yes, explain k. Navigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert is to be placed Old State Canal b. Number of culverts proposed 3 c. Type of culvert (construction material, style) Aluminum d. Will proposed culvert replace an existing bridge? x Yes No If yes, (1) Length of existing bridge 46 feet 9 inches (2) Width of existing bridge 28.8 feet (3) Navigation clearance underneath existing bridge 3 feet Revised 03/95 Form DCM-MP-5 (4) Will all, or a part of, the existing bridge be (3) Amount of material to be excavated in cubic removed? (Explain) all yards e. Will proposed culvert replace an existing culvert? c. Will the placement of the proposed bridge or culvert Yes x No require any highground excavation? If yes, x Yes No (1) Length of existing culvert If yes, (2) Width of existing culvert (1) Length of area to be excavated 4 feet (3) Height of the top of the existing culvert above (2) Width of area to be excavated 3 feet the MHW or NWL (3) Amount of material to be excavated in cubic (4) Will all, or a part of, the existing culvert be yards 10 cubic yards removed? (Explain) d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area f. Length of proposed culvert % authorized NC DOT disposal area (upland site) g. Width of proposed culvert -75-inches- L..• 5� / (2) Dimensions of spoil disposal area h. Height of the top of the proposed culvert above the (3) Do you claim title to the disposal area? MHW or NWL 3 feet x Yes No If no, attach a letter granting permission from i. Will the proposed culvert affect existing water flow? the owner. Yes x No (4) Will the disposal area be available for future If yes, explain maintenance? x Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? j. Will the proposed culvert affect existing navigation Yes x No potential? Yes x No If yes, give dimensions if different from (2) If yes, explain above. (6) Does the disposal area include any area below the MHW or NWL? Yes x No 3. EXCAVATION AND FILL If yes, give dimension if different from No. 2 above. a. Will the placement of the proposed bridge or culvert e. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? result in any fill (other than excavated material x Yes No described in Item d. above) to be placed below If yes, MHW or NWL? Yes x No (1) Length of area to be excavated 45 feet If yes, (2) Width of area to be excavated 38!feet0\�) (1) Length of area to be filled 45 feet (3) Depth of area to be excavated 2(2) Width of area to be filled 20 feet (4) Amount of material to be excavatecubic(3) Purpose of fill backfdl for culverts yards 127 cubic ards b. Will the placement of the proposed bridge or culvert require any excavation within: no Coastal Wetlands no SAVs no Other Wetlands If yes, (1) Length of area to be excavated (2) Width of area to be excavated f. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed within: n Coastal Wetlands n SAVs n_ Other Wetlands If yes, (1) Length of area to be filled (2) Width of area to be filled Revised 03/95 Form DCM-MP-5 (3) Purpose of fill rip -rap placement on shorebank g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? x Yes No If yes, (1) Length of area to be filled 45 feet (2) Width of area to be filled 30 feet (3) Purpose of fill backfill for culverts 4. GENERAL a. Will the proposed project involve any mitigation? Yes x No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes x No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes x No If yes, explain in detail d. Will the proposed project require any work channels? Yes x No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? NC DOT best management practices f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? excavator, dumptrucks, crane g. Will wetlands be crossed in transporting equipment to project site? Yes x No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? x Yes No rip rap along shorebank Kristen Shacochis, Environmental Officer Applicant or Project Name Signature (Q1 /'/i, I Date Revised 03/95 o' .,� ',J Xl, ,y Aft Olive N35'i34.5, " eli Otd .State cinm l ,� / r Al �i--. �FJ35°84' /r 91 / �V![}7 of •�•� r '�L` � '..��' .I �� �' -_,1 ' I - - US 26 UM 41 Bag -T \ -7-rr }xi i72 f 1111igA.'! � � i0�� r "�'s •'� -' - n �«IZ�� r',,� Gt - .�'� r•.% ver NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY: 1-lyde PROJECT: Bridge #4 replacement DATE: April 25, 2001 QUAD MAP: Ponzer SUBJECT: Vicinity Map LAT/LONG: N 35 34.301, W 76 26.501 i Rt / 0 Yin 3 00,01 �i tr i f p 'Ws —0/- 0,0 11 l NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SJ� DIVISION OF HIGHWAYS COUNTY: Hyde PROJECT: Bridge #4 replacement DATE: June 7, 2001 s<-A /I: "i" kc SUBJECT: Profile view of headwall (looking NW & SE) I -X....7 .:CN�1 t7 w�' Nesit'u»/is l r i I � i Pi. A0o r, J LL, SOO.S n=1303 I. ! Ti j n/G R 41( ..v� } ! I I I ! ! I 1 � i NORTH CAROLINA I I i I DEPARTMENT OF TRANSPORTATION ' f DIVISION OF HIGHWAYS �$S �r,e� e%Qvgl•o�= S—DO COUNTY: Hyde PROJECT: Bridge #4 replacement S DATE: June 7, 2001 SUBJECT: Profile view (looking NE & SW) a / WALL C41 T•. F- lzcQ 9 )ve..,- �pp,, ,vim V. 104 RK, NAIL v1 1Iy I p u/oojt Pei I ' f) Z I A \ Z 0,3 6 O I 1 eA!Lom I V `-p, —\hL . • 1 u„:�s �p.sJ`f, / I NORTH CAROLINA ��?L,� (S. �SI,,� Q s�,..-�i-" FDATE: MENT OF TRANSPORTATION /Alm IVISION OF HIGHWAYS ^/cam Gr+•'�- '� gas poT gtOO /IcllLi+ vim^ p y� NAIL_ PK NA1L Hyde Za fl b Bridge #4 replacement 7,2001 Plan Drawing ZejoLJi%/A/n% •N�S'O ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Gurnwood L. Radcliff, Jr. 1269 New Lake Road Belhaven, NC 27810 A. R ei ed by ( e e ri t le y) B. Date of Delivery .l . Signature / O-Agett X�.14 ❑ Addressee D. Is delivery address different from Wnk4h ❑ Yes If YES, enter delivery address below: , ❑ No 3. Service Type 1 Certified Mail ❑ Express Mail ❑ Registered Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from service label) 7099 3400 0007 3650 0126 PS Form 3811, July 1999 Domestic Return Receipt + ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery Is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Lawrence G. Blake 875 New Lake Road Belhaven, NC 27810 102595-00-M-0952 Received by (Please Pr' Clef (ly) B. Date 7re)w0vtL- e-(r 41) gI X,Signature /' ,' /1 �/ / 417J r, /r,Cl/' iL/y�❑Agent /f yjt,"(Xi►tti(.� El Addressee D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. S rvice Type Certified Mail ❑ Express Mail ❑ Registered 0 Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from servicelabel) 7099 3400 0007 3650 0133 PS Form 3811, July 1999 Domestic Return Receipt 102595-00-M-0952 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR April 25, 2001 Division of Coastal Management NC Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 ATTENTION: Ms. Tracy Wheeler, Coastal Field Representative LYNDO TIPPETT SECRETARY SUBJECT: Request for Authorization of Bridge Replacement #4 on New Loop Road (SR 1302) in Hyde County under a General Permit .2300 The North Carolina Department of Transportation proposes to replace the aging Hyde bridge structure # 4 (built 1962) on SR 1302 (New Loop Road, 0.01 miles west of SR 1303) at the Old State Canal crossing with three 40 feet x 9.33 feet high x 6.25 feet wide corrugated aluminum pipe arches with headwalls (see figure 1 for example). The Old State Can, (Public Trust Area of Environmental Concern, is typically a slow flowing stream 5.0 to 0 feet wide and about 3 feet deep. 1t is not a designated primary nursery area, • _co rse area, or outstanding resource water. The replacement structure will be constructed along the existing alignment and would take about two weeks to complete. Based on the proposed design, the new road structure will be wider (+11.2 feet) with a more narrow canal channel (-10.05 feet) but will be able to allow for the same amount of water flow as the existing bridge (Q,,,= 540 cubic feet/second). Department of Transportation plans to remove the old concrete abutements and pilings. The existing bridge bulkheads will remain in place. Submerging the pipes will require excavation below the waterline of about 127 cubic yards Pf The shoreline will be stabilized with rip -rap, which will impact abou 280 gquare feet (0.006 acres) of a fringe, non -coastal wetland consisting of a small emergent community of cattail (Ti pha spp.). fl(kL ic6,3 :rr N P.O. Box 850, Edenton, NC 27932 - Phone: (252) 482-7977 Fax: (252) 482-8722 I have enclosed a vicinity map, plat drawings, landowner signatures, and a check to cover all permit costs. If you have any questions about this project, please contact me immediately. Sincerely, Don Conner, PE Division Enginee -Division One Kristen Shacochis Division Environmental Officer Cc: Keith Harrison, Bridge Maintenance Mr. David Cox, NCWRC Ms. Sarah Winslow, NC DMF Mr. Ron Sechler, NMFS Mr. Tom McCartney, USFWS Mr. John Hennessy, NC DWQ Mr. Ted Sampson, NCDCM Ms. Gretchen Byrum, PE, NCDOT P.O. Box 850. Edenton, NC 27932 - Phone: (252) 482-7977 Fax: (252) 482-8722 Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all j. Will the proposed bridge affect existing water flow? other sections of the Joint Application that relate to this Yes No proposed project. If yes, explain 1. BRIDGES N/A k. Navigation clearance underneath proposed bridge a. Public Private b. Type of bridge (construction material) 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes No c. Water body to be crossed by bridge If yes, explain 0 e f. Water depth at the proposed crossing at MLW or NWL Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) Will proposed bridge replace an existing culvert(s)'? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands m. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert is to be placed Old State Canal b. Number of culverts proposed 3 c. Type of culvert (construction material, style) Aluminum d. Will proposed culvert replace an existing bridge? x Yes No If yes, (1) Length of existing bridge 46 feet 9 inches (2) Width of existing bridge 28.8 feet (3) Navigation clearance underneath existing bridge 3 feet Revised 03/95 Form DCM-MP-5 (4) Will all, or a part of, the existing bridge be (3) Amount of material to be excavated in cubic removed? (Explain) all yards e. Will proposed culvert replace an existing culvert? c. Will the placement of the proposed bridge or culvert Yes x No require any highground excavation? If yes, x Yes No (1) Length of existing culvert If yes, (2) Width of existing culvert (1) Length of area to be excavated 4 feet (3) Height of the top of the existing culvert above (2) Width of area to be excavated 3 feet the MHW or NWL (3) Amount of material to be excavated in cubic (4) Will all, or a part of, the existing culvert be yards 10 cubic ards removed? (Explain) d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area f. Length of proposed culvert 112 inches authorized NC DOT disposal area (upland site) g. Width of proposed culvert 75 inches (2) Dimensions of spoil disposal area h. Height of the top of the proposed culvert above the (3) Do you claim title to the disposal area? MHW or NWL 3 feet x Yes No If no, attach a letter granting permission from i. Will the proposed culvert affect existing water flow? the owner. Yes x No (4) Will the disposal area be available for future If yes, explain maintenance? x Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? j. Will the proposed culvert affect existing navigation Yes x No potential? Yes x No If yes, give dimensions if different from (2) If yes, explain _ above. (6) Does the disposal area include any area below the MHW or NWL? Yes x No 3. EXCAVATION AND FILL If yes, give dimension if different from No. 2 above. a. Will the placement of the proposed bridge or culvert e. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? result in any fill (other than excavated material x Yes No described in Item d. above) to be placed below If yes, z MHW`or NWL? x Yes No (1) Length of area to be excavated 4545 f�71D If yes, (2) Width of area to be excavated 38 feet (1) Length of area to be filled 45 feet (3) Depth of area to be excavated 2 feet (2) Width of area to be filled 20 feet (4) Amount of material to be excavated in cubic (3) Purpose of fill backfill for culverts yards 127 cubic yards b. Will the placement of the proposed bridge or culvert f. Will the placement of the proposed bridge or culvert require any excavation within: result in any fill (other than excavated material no Coastal Wetlands no SAVs no Other described in Item d. above) to be placed within: Wetlands Coastal Wetlands SAVs x Other If yes, Wetlands (1) Length of area to be excavated If yes, (2) Width of area to be excavated (1) Length of area to be filled 70 feet (2) Width of area to be filled 4 feet Revised 03/95 Form DCM-MP-5 (3) Purpose of fill rip rap placement on shorebank g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? x Yes No If yes, (1) Length of area to be filled 45 feet (2) Width of area to be filled 30 feet (3) Purpose of fill backfill for culverts 4. GENERAL a. Will the proposed project involve any mitigation? Yes x No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes x No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes x No If yes, explain in detail d. Will the proposed project require any work channels? Yes x No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? NC DOT best management practices f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? excavator, dumptrucks, crane g. Will wetlands be crossed in transporting equipment to project site? Yes x No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? x Yes No rip rap along shorebank Kristen Shacochis. Environmental Officer Applicant or,project N e a Signature Date Revised 03/95 Figure 2: Hyde Bridge N4 Wetland Fringe consists of Typha spp. Figure 1 A bridge replaced with a corrugated aluminum pipe arch (CAPA) in Pasquotank County. Nit Olive <j ,N35•0345' al banBridge #4� I' 7 Signal Pt US. 2W EWrn ,P, 1r�i1 I ?t. t ' )r±^t' Ponzer Back Lu aatN Bay... �- Th islands 1z hgo River'-- ��• 11 Light NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY: Ffyde PROJECT: Bridge ✓#4 replacement DATE: April 25, 2001 QUAD MAP: Ponzer SUBJECT: Vicinity Map LAT/LONG: N 35 34.301, W 76 26.501 `11y N 51 ha I a� ;roo(17 ar�1-C I iN/r.0PbfN1 ay •P,y M0NS1-8 -J i VN `,1 d -72 —i ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Gurnwood L. Radcliff, Jr. 1269 New Lake Road Belhaven, NC 27810 A. R4 e ed by ( eye n, t le ) B. Date of Delivery J/1 U , /1�-'t, �i•lJ % v V D. Is delivery address different from r ❑ Yes it YES, enter delivery address below: ❑ No 3. Service Type X Certified Mail ❑ Express Mail ❑ Registered Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from service labey 7099 3400 0007 3650 0126 PS Form 3811, July 1999 Domestic Return Receipt 102595.00-M-0952 f ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the maiipiece or on the front if space permits. 1. Article Addressed to: Lawrence G. Blake 875 New Lake Road Belhaven, NC 27810 aayy Received by (Please P � j Cg+rly) 8. Date of Delivery /n #A) r-O vll C (r 15Id 0---/�Wh/-01-- C. S' ature X - ❑ Agent -Cri►(tiC ❑ Addressee D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. rvice Type 2 Certified Mail ❑ Express Mail ❑ Registered 0 Return Receipt for Merchandise ❑ insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from service label) 7099 3400 0007 3650 0133 F'S Fenn 3811, July 1999 Domestic Re►um Receipt 102595-00-M-0952 p4 p ff- "►s gr°tka SC �IA or o c.w� uc/i5 0 X 0.0 S o 00 Abe. vk- �, i 0 D� 500.0 -•W � �� ! 5�9C. S j ,�4?0, 0. ! D up - pa e wee 9r u EL Wit -s P L�e� NORT11 CAROLINA DI?PAIL"I'Nlt,'N"I' Oh "f ItANSI'OR'1'ATION DIVISION OFF 111GHVVAYS COUNTY: It) de PROJECT. Bridge N 4 replacement DATE: April 25, 2001 . StAk SU13.1LCT aerial view UrwAS'tvt i Sr. to t X. 7,T C Ap uv,A Ilertl'u�.:/is { Pimp. /11 r. EL, SSOo.S Y'S YV4 EIE� • i ' I I ou.e- 6 u51 U� �r 1�lpri Ver-tic�2 i j l NOIZTII CAROLINA ' UI:I'AItTi�II:N'I' OF'rRANSPORTATION DIVISION OF HIGHWAYS E� Z6 I11110JECT: COUNTY: I lyde Bridge ii 4 replacement DATE April 25, 2001 pfrs a►, vrkw! SUBJECT: profile vic%� STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR April 25, 2001 Division of Coastal Management NC Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 ATT ENT ION. Ms. Tracy Wheeler, Coastal Ficld Representative APR 2 6 2tir91 LYNDO TIPPETT SECRETARY SUBJECT: Request for Authorization of Bridge Replacement #4 on New Loop Road (SR 1302) in Hyde County under a General Permit .2300 The North Carolina Department of Transportation proposes to replace the aging Hyde bridge structure # 4 (built 1962) on SR 1302 (New Loop Road, 0.01 miles west of SR 1303) at the Old State Canal crossing with three 40 feet x 9.33 feet high x 6.25 feet wide corrugated aluminum pipe arches with headwalls (see figure 1 for example). The Old State Canal, a Public Trust Area of Environmental Concern, is typically a slow flowing stream 50 to 70 feet wide and about 3 feet deep. It is not a designated primary nursery area, secondary nursery area, or outstanding resource water. The replacement structure will be constructed along the existing alignment and would take about two weeks to complete. Based on the proposed design, the new road structure will be wider (+11.2 feet) with a more narrow canal channel (-10.05 feet) but will be able to allow for the same amount of water flow as the existing bridge (Q,o 540 cubic feet/second). Department of Transportation plans to remove the old concrete abutements and pilings. The existing bridge bulkheads will remain in place. Submerging the pipes will require excavation below the waterline of about 127 cubic yards of soil. The shoreline will be stabilized with rip -rap, which will impact about 280 square feet (0.006 acres) of a fringe, non -coastal wetland consisting of a small emergent community of cattail (Typha spp.). P.O. Box 850, Edenton, NC 27932 — Phone: (252) 482-7977 Fax: (252) 482-8722 I have enclosed a vicinity map, plat drawings, lando.Lmer signarures, and a check to cover all permit costs. If you have any questions about this project, please contact me immediately. Sincerely, Don Conner, PE Division Enginee Division One Kristen Shacochis Division Environmental Officer Cc: Keith Harrison, Bridge Maintenance Mr. David Cox, NCWRC Ms. Sarah Winslow, NC DIF Mr. Ron Sechler. NMFS Mr. Tom McCartney, USFWS Mr. John Hennessy, NC DWV Mr. Ted Sampson. NCDC-Ni Ms. Gretchen Byrum, PE, NCDOT P.O. Box 850, Edenton, NC 27932 - Pione: (25= 482--977 Fax: k252) -'82-8722 Mt Olive N36'4:5'S �, �- � ,1 '� t., �-QWtad �-; t r'r k7 kuey.f�Cf' r :vl — �' ' � � , { �',;, -'`•'`,•. - •� � ,j s y j' ,BaGk�:I;�tad/an ) ' N35°33-5e. t ---- - \ • �' n� • :? -2 %. )• f'\., "` 1 la�Q '`; �. ��, � " � ;r Pu ngo ,•River,.` • . ►�, . Ni �. �`�.1 ,�• � _ " �. s�'�`"_.�Y;'1 .�, -'� -' Eight' .. . r9 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY: Hyde PROJECT: Bridge #4 replacement DATE: April 25, 2001 QUAD MAP: Ponzer SUBJECT: Vicinity Map LAT/LONG: N 35 34.301, W 76 26.501 Vi z UZ lj _o G4 O - oc o IVI,- I A � U P � UFF I I I W S oic Pei Fh A v� � r�ivr�E pJ /G II cSoo d -- ! P/0 a 1- PA L- A ► O e-15t, Be Il�A�ILMI /SIC. , -a-79JV PL I i GL ll lii A,qp woodL ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Gurnwood L. Radcliff, Jr. 1269 New Lake Road Belhaven, NC 27810 A. XRei/e d by ( e e=t/e B3Date of Delivery . Signature L G} {went X,��-,g ❑Addressee D. Is delivery address different from i ❑ Yes If YES, enter delivery address below: ❑ No 3. Service Type XI Certified Mail ❑ Express Mail ❑ Registered Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from service label) 7099 3400 0007 3650 0126 PS Form 3811, July 1999 Domestic Return Receipt 102595-00-M-0952 ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Lawrence G. Blake 875 New Lake Road Belhaven, NC 27810 qq Received by (Please PrClrly) ,I B.Date� Delivery ��a XSi ature gn/' `' /1 �/ Of7J❑Agent yjt,L ❑ Addressee D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No 3. S rvice Type 2Certified Mail ❑ Express Mail ❑ Registered i9 Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (Copy from service label) 7099 3 400 0007 3650 0133 PS Form 3811, July 1999 Domestic Return Receipt 102595-00-M-0952 tI) -3 0ll u.5 ��raed // e�r 1I! L(l S�� IT KraeGC D te,,,- age- or- V i 1,14 , /� - �.CI Lpc/QG �17G6 /01 0 LJ (J. i _...3h . -W..A 90 __.. I A i✓; % 1.164...... .... oy". ro I / p y,', lii ., E'!..S- 77!'S 00, 0 1 [3 /rL Id.0 an 0,0 NOIt'1'll ('AltOI,INA DEPARTMENT OF TRANSPORTATION MVISION OF HIGHWAYS COU Nl'Y: I lyde PROJECT: Bridge # 4 replacement DATE: April 25, 2001 SUBJECT: aerial view j .:..ST ,...loth_._._........ I. j Cr Pi: . /00 �. � Ec, soo.s__. y ._i0 rvs U'u' I H11..4l�' I C15 I6 P,ItiI NORTH CAROLINA DEPARTMENT OF TRANSPORTATION — ._._..-.---...._r—......i DIVISION OF HIGHWAYS COUNTY: flyde _......_ _ .... _.......... ...... PROJECT: Bridge f# 4 replacement DATE: April 25, 2001 SUBJECT: profile view