HomeMy WebLinkAbout30527_MCNAMARA, WALTER_20011204L-1 CAMA DREDGE & FILL
GENERAL PERMIT
Previous permit #
L7New LIModification L7Complete Reissue LIPartial Reissue
Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant
to 15A N&C21L 2 0c)
E] Rules attached.
Applicant Name OJ�E11 t Yl C 0 a mo re,
Project Location: County 5 (0 1 1` -
I— F
Address—, - P\ Morlom" k1l
Street Address/ State Road/ Lot #(s)
City -,..State t\ ZIP
Phone # Fax # O
Subdivision
Authorized Agent rvi 12��
City —L:�- ZIP
Affected El Cw U EW Ej;,"A El ES D PTS
Phone# River Basin g Vic.
AEC(s): El OEA E HHF El 1H El UBA ED NIA
Adj. Wtr. Body C r (nat /man /unkn)
❑ Pws: DFC:
ORW: yes / no PNA yes /,,—no Crit. Hab. yes no
Closest Maj. Wtr. Body
Type of Project/ Activity
(Scale:
Pier (dock) length__
Platform(s)
Finger pier(s)
L-J
Groin length
number
Bulkhead/ Riprap length
avg distance offshore
max distance offshore
Basin, channel
cubic yards
x,
Boat ramp
Boathouse/ Boatlift '2
Beach Bulldozing
w Other dL-
r.
Shoreline Length'
", 0i;
SAM not sure yes no
Sandbags: not sure yes no
n/a yes n
Moratorium: 0
ro r
Photos: yes no
qrL -K L —i VIN
Waiver Attached: yes no
A building permit may required by: Laver, cr, See note on back regarding River Basin rules.
Notes/ Special Conditions e r—,Xi 4, 1, )ik 'ne-1 rr� k,
I
Agent or Applicant Prin'ted Name
Signature Please read compliance statement an back of permit
Application Fee(s)l Check #
rf --Permit 641C-elr's Signu6re'
Issuing Date Expiration Date
JI/
1,6i:al Planning jurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certifythat this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ T - Pamlico River Basin Buffer Rules ❑ Other:
Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District
Mailing Address: 1367 U.S. 17 South
1638 Mail Service Center Elizabeth City, NC 27909
Raleigh, NC 27699-1638 252-264-3901
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888ARCOAST
Fax: 919-733-1495
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
15 I -B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax: 910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 10/05/01
FOLEY & FOLEY CONTRACTORS, INC.
1810 OLD AIRPORT ROAD PH. 252-636-2516
P.O. BOX 3482
NEW BERN, NC 28564
3473
. 1 66-85/531
PAY DATE
TO THE
ORDER OF
$�
A= -----_-_DOLLARS
6 7 I= Centura Bank®
New Bem, NC 28560
ivp
II'0000 34 7 3118 1:0 s 3 100a 501:0 3 cjooL G SOUR
0
11/30/01 08:51 FAX
N
TO: Tracey Wheeler (Cams)
Fax#: 247-3330
Date: November 29, 2001
Page#: 3
From: Foley & Foley (Sandy)
Phone#: 636-2515
Customer Work Sheet
Customer Name: Walter McNamara Date: November 29, 2001
Mailing Address: _710 A Madame Moores Ln. New Bern. NC 28560
Job Address: Phone: 252-634-9534
Adiacent ProRerty Owners
Left Side: Frank Bender Right Side:
Job Type Description
Bulkhead
Dock/Walkway
Platform end of dock
Boathouse Roof Only 12' x 24'
Boatlift/j et ski
Piling
Ramp/Jetty
Dredge_
Rip Rap_
11/30/01 08:51 FAX 002
NOv-29-2001 a9:55 FROM BENDER BURKOT EAST COAST fu �3jt!03-2'(
_b
'WAcwrRUARIAIV pROPm`i'Y 0Wm
grATEWWr
TA4tTS
(p A A Plgle/A�t7 WW P
e ��
card that 1 Own ptgzM adjacent W
I benby �l (Kame of Properxi Owner)
p mp " kened at
U
N N.Ca
an (Town apd/or County)
(Woterbody)
He hm de=ibed to me, as shown below, the des►ok)pmatt he is PmPa iftg at that
IM arbd. I hive no objeet;i= to his proposAL I uoderabnd that a Octlmosrrin
�ilia�tJbodtlift/bmthouse must be set back a minimum distanvo oEfifieen fat (IS') from my area
uE ' prim waived by me.
I 1h apt wish to waive the xtback raquirem=L
T d4 wish to waive that adbatk regviremmt.
DESCRIPTION ANWOR MAWING OF FROPOM ULvLLAPM'm'&=
(Po be fi d in 6y lndividud PMDMxt deter Woent)
>� � ';T
� p1
�fSA l.,
Signature
FRA Kd e r- J�2
Print or Type Name
\� Tielephrft Nwntyer
�. 2
h�
�-
TJiR� P.01
11/30/01 08:51 FAX
FROM FAX NQ,
E
Nov. 29 2M1 09:0E3PM P1
AXACEM RIPARIAN PROOWNMt STATEMENT
(FOR A PMRIMOORJNO PHJNG 0A7UF71B0ATH0VSJU
I hereby certify that I own property ad)x=t to 1A)A1 /At )M;VA&sA4W6'a
ofame of Property Owner)
pivperty looted at
an 1 RFLu` R, -0 sri . in 4J PeAu41i N.C.
(Watebody) {Town and/or Cuunty)
He has described to men as shown below, the devetopn=t he is prvpce tg at that
Iccadoa0 and, I have no objections to his proposal. f undaratand that a piertmooft
must be set back a minimum distanca of fife ► feet (15') from my area
of riparian suss unless waived by me.
I Wish to waive the setback requirement.
I A4 wish to waive that setback requirement.
DESCRIMON ANDtOR DRAWING OF FRGK*ED DEVEL O MEN T:
(To be JW#d in by bdWud pmpo ing devrkpmeni)
o�
cQ�4�
T
h�
pL
5iT0
G'"Cf 1 J;001 4,4(.r u -'r
Print or Tie Name
952 6-9 ;�: S �
Tatepbow Number
Date: ��? o
SECTION .1200 - GENERAL PERN11T FOR CONSTRUCTION OF PIERS: DOCKS: AND BOAT HOUSES IN
ESTUARINE AND PUBLIC TRUST WATERS
15A NCAC 07H .1201 PURPOSE
This permit will allow the construction of new piers, docks; and boat housein the estuarine and public trust waters AECs and
construction of new piers and docks within coastal wetlands AECs according to the authority provided in Subchapter 7J .1100 and
according to the following guidelines. This permit will not apply to the Ocean Hazard AEC.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984.
15A NCAC 07H .1202 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for
development. The applicant shall provide information on site location, dimensions of the project area, and his name and address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian propertyowners
indicating that they have no objections to the proposed work: or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work. Such notice shall instruct adjacent property owners to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management within
10 days of receipt of the notice, and, indicate that no response will be interpreted as no objection. DCM staff
shall review all comments and determine, based on their relevance to the potential impacts of the proposed
project, if the proposed project can be approved by a General Permit. If DCM staff finds that the comments
are worthy of more in-depth review, the applicant shall be notified that he must submit an application for a
major development permit.
(c) Approval of individual projects shall be acknowledged in writing by the Division of Coastal Management and the applicant
shall be provided a copy of this Section.
(d) Construction must be completed within 90 days of the approval of the permit or the permit expires.
(e) Any modification or addition to the approved project shall require prior approval from the Division of Coastal Management
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 1134-124;
Eff. March 1, 1984;
Amended Eff. August 1, 1998; January 1, 1990.
15A NCAC 07H .1203 PERNUT FEE
The applicant must pay a permit fee of one hundred dollars ($100.00) by check or money order payable to the Department.
History Note: Authority G.S. 113A-107; 113A-113(b); 113A-118.1; 113A-119; 113-119.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. August 1, 2000; March 1, 1991.
15A NCAC 07H .1204 GENERAL CONDITIONS
(a) Piers authorized by this general permit shall be for the exclusive use of the land owner, or occupant and shall not provide
either leased or rented docking space or any other commercial services. Piers designed to provide docking space for more than
two boats shall, because of their greater potential for adverse impacts, be reviewed through the major permitting process and,
therefore, are not authorized by this general permit.
(b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to make periodic
inspections at any time deemed necessary in order to be sure that the activity being performed under the authority of this general
permit is in accordance with the terms and conditions prescribed herein.
__J
(c) There shall be no unreasonable interference with navigation or use of the waters by the public by the existence of piers, docks
and boat houses.
(d) This permit will not be applicable to proposed construction where the Department believes that the proposed activity might
unnecessarily endanger adjoining properties; significantly affect historic, cultural, scenic, conservation or recreation values.
identified in G.S. 113A-102 and G.S. 113A-I 13(b)(4), nor that might significantly affect the quality of the human environment.
(e) This permit does not eliminate the need to obtain any other required state, locaL or federal authorization.
(f) Development carried out under this permit must be consistent with all local requirements, AEC Guidelines, and local land use
plans current at the time of authorization.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff' Mqv 1, 1990;
RRC Objection due to ambiguity Eff. May 19, 1994;
Amended Eff. August], 1998; July 1, 1994.
15A NCAC 07H .1205 SPECIFIC CONDITIONS
(a) Piers, docks, and boat houses may extend or be located up to a maximum of 400 feet from the normal high water line, or the
normal water level, whichever is applicable.
(b) Piers, docks, and boat houses shall not extend beyond the established pier length along the same shoreline for similar use.
This restriction shall not apply to piers 100 feet or less in length unless necessary to avoid unreasonable interference with
navigation or other uses of the waters by the public. The length of piers shall be measured from the waterward edge of any
wetlands that border the water body.
(c) Piers longer than 200 feet shall be permitted only if the proposed length gives access to deeper water at a rate of at least one
foot at each 100 foot increment of pier length longer than 200 feet. or if the additional length is necessary to span some
obstruction to navigation. Measurements to determine pier lengths shall be made from the waterward edge of any coastal wetland
vegetation which borders the water body.
(d) Piers and docks shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland substrate as
measured from the bottom of the decking.
(e) Any portion of a pier (either fixed or floating) extending from the main structure and six feet or less in width shall be
considered either a "T" or a finger pier.
(f) Any portion of a pier (either fixed or floating) greater than six feet wide shall be considered a platform or deck.
(g) "T"s. finger piers, platforms, and decks of piers on lots with shorelines 100 feet or greater in length shall not exceed a
combined total area of 400 square feet. The combined total area for lots less than 100 feet shall not exceed four square feet per
linear foot of shoreline.
(h) Platforms and decks shall have no more than six feet of any dimension extending over coastal wetlands.
(i) Boathouses shall not exceed 400 square feet and shall have sides extending n&rther than one-half the height of the walls and
only covering the top half of the walls. Measurements of square footage shall be taken of the greatest exterior dimensions.
Boathouses shall not be allowed on lots with less than 75 linear feet of shoreline.
0) Areas enclosed by boat lifts shall not exceed 400 square feet.
(k) Piers, docks, decks, platforms and boat houses shall be single story. They may be roofed but shall not be designed to allow-
second story use.
(1) Pier alignments along federally maintained channels must also meet Corps of Engineers regulations for pier construction
pursuant to Section 10 of the Rivers and Harbors Act.
(m) Piers. docks, and boat houses shall in no case extend more than 1/4 the width of a natural water body. human -made canal or
basin. Measurements to determine widths of the water body, human -made canals or basins shall be made from the waterward
edge of any coastal wetland vegetation which borders the water body. The 1/4 length limitation shall not applywhen t*posed
pier is located between longer piers within 200 feet of the applicant's property. However, the proposed pier shall not be longer
than the pier head line established by the adjacent piers, nor, longer than Ir the width of the water body.
(n) Piers. docks and boat houses shall not interfere with the access to any riparian property, and shall have a minimum setback of
15 feet between any part of the pier and the adjacent property lines extended into the water at the points that they intersect the
shoreline. The minimum setbacks provided in the rule may be waived by the written agreement of the adjacent riparian owner(s),
or when two adjoining riparian owners are co -applicants. Should the adjacent property be sold before construction of the pier
commences. the applicant shall obtain a written agreement with the new owner waiving the minimum setback and submit it to the
Division of Coastal Management prior to initiating any development of the pier, dock, or boat house. The line of division of areas
of riparian access shall be established by drawing a line along the channel or deep water in front of the property, then drawing a
line perpendicular to the line of the channel so that it intersects with the shore at the point the upland property line meets the
water's edge. Application of this Rule may be aided by reference to the approved diagram in Paragraph (q) of this Rule
illustrating the rule as applied to various shoreline configurations. Copies of the diagram may be obtained from the Division of
Coastal Management. When shoreline configuration is such that a perpendicular alignment cannot be achieved, the pier shall be
aligned to meet the intent of this Rule to the maximum extent practicable.
(o) Piers, and mooring facilities shall be designed to provide docking space for no more than two boats.
(p) Applicants for authorization to construct a dock or pier shall provide notice of the permit application to the owner of any part
of a shellfish franchise or lease over which the proposed dock or pier would extend. The applicant shall allow the lease holder the
opportunity to mark a navigation route from the pier to the edge of the lease.
(q) The diagram shown below illustrates the various shoreline configurations.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. December 1, 1991; May 1, 1990; ,March 1, 1990;
RRC Objection due to ambiguity Eff. March 18, 1993;
Amended Eff. August 1, 1998; April 23, 1993.