HomeMy WebLinkAbout32343_MANNING, ROBERT_20020715CAMA / DREDGE & FILL
GENERAL PERMIT y
Previous permit
New Modification Complete Reissue Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 1( (,,
Q Rules attached.
Applicant Name_ kt %6 a Afsp ,r Project Location: County / , 1 t ,.I
Address ,3Cb A• V n f44t-
A vt T C
-
City � -1 as
�'aI),
State 04
ZIP 1 �• Sty
Phone # O
Fax # O
Authorized Agent
1, rl E
S
Affected D CW
ZIEW
® PTA ®-ES
Z PTS
AEC(s): OEA
❑ HHF
❑ IH ❑ USA
C N/A
❑ PWS:
❑FC:
ORW: yes / no
PNA
yes / IF Crit. Hab. yes / nc
Street Address/ State Road/ Lot #(s)
Subdivision
City /i /�0 ✓f ,�S'nt� -- _ ZIP ? V 2.
Phone # (—�) River Basin ^✓�'' �' C�k
Adj. Wtr. Body .van&Idd( /,O fo (nat / iani/unkn)
Closest Maj. Wtr. Body hlcrV11 fcuNd
Type of Project/ Activity l c r t (F ] r � by V r , !Vow,
(Scale: ,41(. N C )
Pier (dock) length
Platform(s)_
Finger pier(s) -
Groin length
number
Bulkhead/ Riprap length_(
avg distance offshore_ —
max distance offshore
Basin, channel
cubic yards
Boat ramp
Boathouse/ Boatlift
Beach Bulldozing
Other
cQ
_- -. - - I IV-"`.
Shoreline Length —_ —_ t C /
i
SAM not sure yes no
Sandbags: not sure yes no
Moratorium: n/a yes no L J n
Photos: yes no
Waiver Attached: yes no
A building permit may be required by: 11 r1c 0".0 L C' See note on back regarding River Basin rules.
Notes/ Special Conditions r
Agent or Applicant Printed Namj
Signature "Please read compliance statement on back of permit
Application Fee(s) Check #
Permit Officer's Signature
Issuing Date Expiration Date
Local Planning Jurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District
Mailing Address: 1367 U.S. 17 South
1638 Mail Service Center Elizabeth City, NC 27909
Raleigh, NC 27699-1638 252-264-3901
Location:
Parker -Lincoln Building
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293 / 1-888-4RCOAST
Fax: 919-733-1495
Fax: 252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Morehead City District
151-B Hwy. 24
Hestron Plaza II
Morehead City, NC 28557
202-808-2808
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-395-3900
Fax: 910-350-2004
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised I O/05/0 i
BBST 5490
OUTER BANKS MARINE CONSTRUCTION
BRANCH BANKING AND TRUST COMPANY
1501 FIRST AVE
MOREHEAD CITY, NC 28557 MOREHEAD CITY, NC 28557
66-1121531
(252) 240-2525 7/12/2002
PAY TO THE 1 $ ** 100.00
ORDER OF DEN R
DOLLARS 8
D.E.N.R.
MEMO
II'00549011' 1:053101120:123101529511'
ADJACENT RWARfAN PROPERTY OWNER STATEMENT
(FOR A PIERIUNC'OVERED BOAT LIFT)
I hereby certify that I own property adjacent to s
(?Name of Property Owner)
property located at
on
(Lot, Block, Road, etc.)
. u7
(Waterbody) (Town and/or County)
N (I
He has described to me, as shown below, the development he is proposing at that
location, and, I have no objections to his proposal. I understand that a pier/uncovered boat lift
must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless
waived by me.
I do not wish to waive the setback requirement.
I do wish to waive that setback requirement.
-------------------------------------------------------------------------------------------------------
DESCRIPTIO:N AND/OR DRAINING OF PROPOSED DEVELOPME-'N'T:
(To be filled in by individual proposing development)
------------------------------------------------------------------------------------------------------------
LA I 14'� I I � C,
Signature _
Print or Type Name /
Telephone Number
Date:
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
(FOR A PIER/UNCOVERED BO LIFT)
I hereby certify that I own property adjacent to s
(name o Pro wn
property located at _\-361
(Lot, B k, Road, etc.)
on in(Waterbody) (Town and/or County) N.C.
He has described to me, as shown below, the development he is proposing at that
location, and, I have no objections to his proposal. I understand that a pier/uncovered boat lift
must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless
waived by me.
I do not wish to waive the setback requirement.
!� I do wish to waive that setback requirement.
-----------------------------------------------------------------------------------------------------------------
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT:
(To be filled in by individual proposing development)
JUL 1:?2002
re
t or Type Name
Asa
Telephone Number
Date:
SECTION.1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS AND THE PLACEJMNT OF
RIPRAP FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS
1SA NCAC 07H.1101 PURPOSE
This permit will allow the construction of bulkheads and the placement of riprap for shoreline protection in the public trust waters
and estuarine waters AECs according to authority provided in Subchapter 7J A 100 and according to the foLowing guidelines.
This permit will not apply to shoreline protection within the ocean hazard AEC.
HistoryNote: Authority G.S. 113A-10"(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A424;
lff. March 1, 1984.
HA NCAC 07H .1102 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for
development. The applicant shall provide information on site location- dimensions of the project area, and his name and address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian prope ty owners
indicating that they have no objections to the proposed work: or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed
work Such notice should instruct adjacent property owns to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management within
ten days of receipt of the notice; and, indicate that no response will be interpreted as no 0biecuon. DCM staff
will review all comments and determine. based on their relevanceto the potential impac of the proposed
project, if the proposed project can be approved by a General Permit. Ir DCM staff finds that the comments
are worthy of more in-depth review. the applicant will be notified that he must submit an application for a
major development permit.
(c) No work shall bean until an on -site meeting is held with the applicant and appropriate .;, Division of Coaal Management
representative so that the proposed bulkhead alignment can be appropriately marked. Written authorization to proceed with the
proposed development may be issued during this visit. Construction of the bulkhead or ripe stricture mus bean within 90 days
of this visit or the general authorization expires and it will be necessan- to re-examine the aiisnme= dete ryine if the general
authorization can be reissued.
Histor✓ :\'ore: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113.4-118.1; 113A-124;
Eta.' March 1, 1984;
Amended Eff. January 1, 1990; December 1, 1987.
ISANCAC 07H.1103 PERMIT FEE
The applicant must pay a permit fee of one hundred dollars (S100.00) by check or money crier payable to the Dera:�meat.
History :fate: Authority G.S. 113.4-10-; 113A-113(b); 113.4-118.1; 113.4-119; 113-119.1; 113A-12-.':
'U. Afarch 1, 1984;
Amended E,f. August 1, 2000; March 1, 1991.
15A NCAC 07H .1104 GENERAL CONDITIONS
(a) This permit authorizes only the construction of bulkheads and the plan --•meat of riprap conforming to the standards herein.
(b) Individuals shall allow authorized representatives of the Department of Environment. health. and Natural Resour---s to make
periodic necessary odic inspections at any time deemed nessary in order to be sure that the activity_ being performed under authority of this
general permit is in accordance with the terms and conditions prescribgd herein-
(c) There shall be no significant interference with navigation or use of the waters by the pubic by the existence, of the bulkhead
or the riprap authorized herein.
(d) This permit will not be applicable to proposed construction where the Departmcat has Bete mined, based on an initial re,.lew
of the application. that notice and review pursuant to G.S. 113A-119 is necessary because there are uar--soh•ed questions
concerning the proposed activity's impact on adjoining properties or on water quality; air quality: coastal wetlands: cultural or
historic sites; wildlife; fisheries resources; or public trust rights.
(e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization
(f) Development carried out under this permit must be consistent with all local requirements. AEC rules. and local land use ply
current at the time of authorization -
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113/b); 113A-118.1; 113A-124;
Eff. March 1, 1984,
Amended Eft May 1, 1990; December 1, 1987,-
RRC Objection due to ambiguity E.tf. Mav 19, 1994;
Amended Eft August 1, 1998; Juhl 1, 1994.
15A NCAC 07H.1105 SPECIFIC CONDITIONS
(a) This general permit is applicable only along shorelines void of wetland vegetation including marsh. grass and wooded swamp,
or where all construction is to be accomplished landward of such vegetation
(b) Along natural shorelines e.g. rivers, creeks. bays. sounds_ etc., bulkheads and riprap material must bepositioned as follows:
(1) Bulkheads must be positioned so as not to exceed more than an average distance of 2 fee —ware -ward of the
mean high water mark, or the normal water level contour, whichever is applicable. In no case shall the
bulkhead be positioned more than 5 feet watermad of the mean high water or normal water level contour at
any point along its alignment.
(2) Riprap must be positioned so as not to exceed a maximum of 5 feet water -ward of the mean him watermark; or
normal water level contour at any point along itsalignment. This location standard also applies to riprap
proposed water -ward of the existing bulkheads.
(c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap material must be positioned so as not to
excmd more than an average distance of 5 feet water'•ard of the mean high water, mars- or the normal water level contour.
whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 fee: orate:ward of the mean high
water or normal water level contour at any point along its alignment For the purpose of these Rules. the Atlmric Intracoastal
Waterway (AIW-W) is considered a natural shoreline and development must occur as described in iH .110:i ol.
(d) Construction authorized by this general permit will be limited to a maximum shoreline lenzth of 500 fee;_
(e) All backf-rll material shall be obtained from an upland source.
(f) The bulkhead must be constructed, or the riprap must be in place prior to any backfrlling activities.
(g) The bulkhead or riprap must be structurally tight so as to prevent seepage of back fill materials throuo� the structure.
(h) Riprap material shall be free from loose dirt or any other pollutant. It must be of a size sutiucieat to pry.',. ,t its movement
from the site by wave or current action.
(i) Riprap material must consist of clean rock or masonry materials such as but not limired to gr ite or bncre
roken cote.
Materials such as tires, car bodies, scrap metal- page -products, tree limbs, wood debris. organic mate.;al or siraLar material - are
not considered riprap.
0) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal she--: piles or other suitable materials
approved by department personnel. No excavation is permitted except for that which may be required for the ;instruction of the
bulkhead wall- riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment.
(k) Bulkheads or riprap shall not extend beyond established alignments nor restrict the original width of the :anal or basin
(1) If one contiguous acre or more of prope-n• is to be excavated or filled, an erosion and sedimentation control plan must be filed
with the Division of Land Resources, Land Quality Section, or appropriate local government having jurisdiction This plan must
be approved prior to commencing the land -disturbing activity.
HistoryA'ote: Authority G.S. 113A-107(a); 113A-107 (b); 113A-113(b); 113A-118.1; 113.4-124:
4f March 1, 1984;
Amended Erf. December 1, 1991; January 1, 1989; December 1, 19817.
HistoryNote: Authority G.S. 113A-10-; 113A-118.1;
Temporary Adoption E.tf. October 2, 1999.
_.WROil
�t
y
l
'
1
u
It.
t�'� yam'
-
_ �../X' M �+•
IL
IL
�
`�'��,'
. 9 s, Apr L��!
• �...
_
r
>—i
p}
p * }
• r.4
IF14
i f
f
P
k i �.
, • • 1 k,
... i
».
7 • ,