Loading...
HomeMy WebLinkAbout32343_MANNING, ROBERT_20020715CAMA / DREDGE & FILL GENERAL PERMIT y Previous permit New Modification Complete Reissue Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 1( (,, Q Rules attached. Applicant Name_ kt %6 a Afsp ,r Project Location: County / , 1 t ,.I Address ,3Cb A• V n f44t- A vt T C - City � -1 as �'aI), State 04 ZIP 1 �• Sty Phone # O Fax # O Authorized Agent 1, rl E S Affected D CW ZIEW ® PTA ®-ES Z PTS AEC(s): OEA ❑ HHF ❑ IH ❑ USA C N/A ❑ PWS: ❑FC: ORW: yes / no PNA yes / IF Crit. Hab. yes / nc Street Address/ State Road/ Lot #(s) Subdivision City /i /�0 ✓f ,�S'nt� -- _ ZIP ? V 2. Phone # (—�) River Basin ^✓�'' �' C�k Adj. Wtr. Body .van&Idd( /,O fo (nat / iani/unkn) Closest Maj. Wtr. Body hlcrV11 fcuNd Type of Project/ Activity l c r t (F ] r � by V r , !Vow, (Scale: ,41(. N C ) Pier (dock) length Platform(s)_ Finger pier(s) - Groin length number Bulkhead/ Riprap length_( avg distance offshore_ — max distance offshore Basin, channel cubic yards Boat ramp Boathouse/ Boatlift Beach Bulldozing Other cQ _- -. - - I IV-"`. Shoreline Length —_ —_ t C / i SAM not sure yes no Sandbags: not sure yes no Moratorium: n/a yes no L J n Photos: yes no Waiver Attached: yes no A building permit may be required by: 11 r1c 0".0 L C' See note on back regarding River Basin rules. Notes/ Special Conditions r Agent or Applicant Printed Namj Signature "Please read compliance statement on back of permit Application Fee(s) Check # Permit Officer's Signature Issuing Date Expiration Date Local Planning Jurisdiction Rover File Name Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s) . The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief, certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: ❑ Tar - Pamlico River Basin Buffer Rules ❑ Other: ❑ Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office (910-395-3900) for more information on how to comply with thesebuffer rules. Division of Coastal Management Offices Central Office Elizabeth City District Mailing Address: 1367 U.S. 17 South 1638 Mail Service Center Elizabeth City, NC 27909 Raleigh, NC 27699-1638 252-264-3901 Location: Parker -Lincoln Building 2728 Capital Blvd. Raleigh, NC 27604 919-733-2293 / 1-888-4RCOAST Fax: 919-733-1495 Fax: 252-264-3723 (Serves: Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans Counties) Morehead City District 151-B Hwy. 24 Hestron Plaza II Morehead City, NC 28557 202-808-2808 Fax: 252-247-3330 (Serves: Carteret, Craven, Onslow -above New River Inlet- and Pamlico Counties) Washington District 943 Washington Square Mall Washington, NC 27889 252-946-6481 Fax: 252-948-0478 (Serves: Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties) Wilmington District 127 Cardinal Drive Ext. Wilmington, NC 28405-3845 910-395-3900 Fax: 910-350-2004 (Serves: Brunswick, New Hanover, Onslow -below New River Inlet- and Pender Counties) Revised I O/05/0 i BBST 5490 OUTER BANKS MARINE CONSTRUCTION BRANCH BANKING AND TRUST COMPANY 1501 FIRST AVE MOREHEAD CITY, NC 28557 MOREHEAD CITY, NC 28557 66-1121531 (252) 240-2525 7/12/2002 PAY TO THE 1 $ ** 100.00 ORDER OF DEN R DOLLARS 8 D.E.N.R. MEMO II'00549011' 1:053101120:123101529511' ADJACENT RWARfAN PROPERTY OWNER STATEMENT (FOR A PIERIUNC'OVERED BOAT LIFT) I hereby certify that I own property adjacent to s (?Name of Property Owner) property located at on (Lot, Block, Road, etc.) . u7 (Waterbody) (Town and/or County) N (I He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/uncovered boat lift must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. I do not wish to waive the setback requirement. I do wish to waive that setback requirement. ------------------------------------------------------------------------------------------------------- DESCRIPTIO:N AND/OR DRAINING OF PROPOSED DEVELOPME-'N'T: (To be filled in by individual proposing development) ------------------------------------------------------------------------------------------------------------ LA I 14'� I I � C, Signature _ Print or Type Name / Telephone Number Date: ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/UNCOVERED BO LIFT) I hereby certify that I own property adjacent to s (name o Pro wn property located at _\-361 (Lot, B k, Road, etc.) on in(Waterbody) (Town and/or County) N.C. He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/uncovered boat lift must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. I do not wish to waive the setback requirement. !� I do wish to waive that setback requirement. ----------------------------------------------------------------------------------------------------------------- DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by individual proposing development) JUL 1:?2002 re t or Type Name Asa Telephone Number Date: SECTION.1100 - GENERAL PERMIT FOR CONSTRUCTION OF BULKHEADS AND THE PLACEJMNT OF RIPRAP FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS 1SA NCAC 07H.1101 PURPOSE This permit will allow the construction of bulkheads and the placement of riprap for shoreline protection in the public trust waters and estuarine waters AECs according to authority provided in Subchapter 7J A 100 and according to the foLowing guidelines. This permit will not apply to shoreline protection within the ocean hazard AEC. HistoryNote: Authority G.S. 113A-10"(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A424; lff. March 1, 1984. HA NCAC 07H .1102 APPROVAL PROCEDURES (a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for development. The applicant shall provide information on site location- dimensions of the project area, and his name and address. (b) The applicant must provide: (1) confirmation that a written statement has been obtained signed by the adjacent riparian prope ty owners indicating that they have no objections to the proposed work: or (2) confirmation that the adjacent riparian property owners have been notified by certified mail of the proposed work Such notice should instruct adjacent property owns to provide any comments on the proposed development in writing for consideration by permitting officials to the Division of Coastal Management within ten days of receipt of the notice; and, indicate that no response will be interpreted as no 0biecuon. DCM staff will review all comments and determine. based on their relevanceto the potential impac of the proposed project, if the proposed project can be approved by a General Permit. Ir DCM staff finds that the comments are worthy of more in-depth review. the applicant will be notified that he must submit an application for a major development permit. (c) No work shall bean until an on -site meeting is held with the applicant and appropriate .;, Division of Coaal Management representative so that the proposed bulkhead alignment can be appropriately marked. Written authorization to proceed with the proposed development may be issued during this visit. Construction of the bulkhead or ripe stricture mus bean within 90 days of this visit or the general authorization expires and it will be necessan- to re-examine the aiisnme= dete ryine if the general authorization can be reissued. Histor✓ :\'ore: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113.4-118.1; 113A-124; Eta.' March 1, 1984; Amended Eff. January 1, 1990; December 1, 1987. ISANCAC 07H.1103 PERMIT FEE The applicant must pay a permit fee of one hundred dollars (S100.00) by check or money crier payable to the Dera:�meat. History :fate: Authority G.S. 113.4-10-; 113A-113(b); 113.4-118.1; 113.4-119; 113-119.1; 113A-12-.': 'U. Afarch 1, 1984; Amended E,f. August 1, 2000; March 1, 1991. 15A NCAC 07H .1104 GENERAL CONDITIONS (a) This permit authorizes only the construction of bulkheads and the plan --•meat of riprap conforming to the standards herein. (b) Individuals shall allow authorized representatives of the Department of Environment. health. and Natural Resour---s to make periodic necessary odic inspections at any time deemed nessary in order to be sure that the activity_ being performed under authority of this general permit is in accordance with the terms and conditions prescribgd herein- (c) There shall be no significant interference with navigation or use of the waters by the pubic by the existence, of the bulkhead or the riprap authorized herein. (d) This permit will not be applicable to proposed construction where the Departmcat has Bete mined, based on an initial re,.lew of the application. that notice and review pursuant to G.S. 113A-119 is necessary because there are uar--soh•ed questions concerning the proposed activity's impact on adjoining properties or on water quality; air quality: coastal wetlands: cultural or historic sites; wildlife; fisheries resources; or public trust rights. (e) This permit does not eliminate the need to obtain any other required state, local, or federal authorization (f) Development carried out under this permit must be consistent with all local requirements. AEC rules. and local land use ply current at the time of authorization - History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113/b); 113A-118.1; 113A-124; Eff. March 1, 1984, Amended Eft May 1, 1990; December 1, 1987,- RRC Objection due to ambiguity E.tf. Mav 19, 1994; Amended Eft August 1, 1998; Juhl 1, 1994. 15A NCAC 07H.1105 SPECIFIC CONDITIONS (a) This general permit is applicable only along shorelines void of wetland vegetation including marsh. grass and wooded swamp, or where all construction is to be accomplished landward of such vegetation (b) Along natural shorelines e.g. rivers, creeks. bays. sounds_ etc., bulkheads and riprap material must bepositioned as follows: (1) Bulkheads must be positioned so as not to exceed more than an average distance of 2 fee —ware -ward of the mean high water mark, or the normal water level contour, whichever is applicable. In no case shall the bulkhead be positioned more than 5 feet watermad of the mean high water or normal water level contour at any point along its alignment. (2) Riprap must be positioned so as not to exceed a maximum of 5 feet water -ward of the mean him watermark; or normal water level contour at any point along itsalignment. This location standard also applies to riprap proposed water -ward of the existing bulkheads. (c) Along shorelines within upland basins, canals, and ditches, bulkheads or riprap material must be positioned so as not to excmd more than an average distance of 5 feet water'•ard of the mean high water, mars- or the normal water level contour. whichever is applicable. In no case shall the bulkhead or riprap be positioned more than 10 fee: orate:ward of the mean high water or normal water level contour at any point along its alignment For the purpose of these Rules. the Atlmric Intracoastal Waterway (AIW-W) is considered a natural shoreline and development must occur as described in iH .110:i ol. (d) Construction authorized by this general permit will be limited to a maximum shoreline lenzth of 500 fee;_ (e) All backf-rll material shall be obtained from an upland source. (f) The bulkhead must be constructed, or the riprap must be in place prior to any backfrlling activities. (g) The bulkhead or riprap must be structurally tight so as to prevent seepage of back fill materials throuo� the structure. (h) Riprap material shall be free from loose dirt or any other pollutant. It must be of a size sutiucieat to pry.',. ,t its movement from the site by wave or current action. (i) Riprap material must consist of clean rock or masonry materials such as but not limired to gr ite or bncre roken cote. Materials such as tires, car bodies, scrap metal- page -products, tree limbs, wood debris. organic mate.;al or siraLar material - are not considered riprap. 0) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal she--: piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the ;instruction of the bulkhead wall- riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. (k) Bulkheads or riprap shall not extend beyond established alignments nor restrict the original width of the :anal or basin (1) If one contiguous acre or more of prope-n• is to be excavated or filled, an erosion and sedimentation control plan must be filed with the Division of Land Resources, Land Quality Section, or appropriate local government having jurisdiction This plan must be approved prior to commencing the land -disturbing activity. HistoryA'ote: Authority G.S. 113A-107(a); 113A-107 (b); 113A-113(b); 113A-118.1; 113.4-124: 4f March 1, 1984; Amended Erf. December 1, 1991; January 1, 1989; December 1, 19817. HistoryNote: Authority G.S. 113A-10-; 113A-118.1; Temporary Adoption E.tf. October 2, 1999. _.WROil �t y l ' 1 u It. t�'� yam' - _ �../X' M �+• IL IL � `�'��,' . 9 s, Apr L��! • �... _ r >—i p} p * } • r.4 IF14 i f f P k i �. , • • 1 k, ... i ». 7 • ,