HomeMy WebLinkAbout7398_BLAKER, ROBERT M_19910624'i.
CAMA AND DREDGE AND FILL,
GENERAL JUL 0 1 19 1-1
PERMIT
M- ------
1
�
as authorized by the State of North Carolina,
Department of Natural Resources and Community Development and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC 1 \A • \\v0
Applicant Name �v � �1 a���t Phone Number 426 U 33
Address I \ ,� — _\bc
City �_Z,5QA IN, State C.IX&I , zip --ag, c1ScU1�
Project Location (County, State Road, Water Body, etc.)
C.� R!
I
Type of Project Activity P CLI., pc,c uti`%�� �c c. 5\\o h \�i• t ��. ,� c rc� ..r. �s� c o ,.c�
\C, c. 'k1U
PROJECT DESCRIPTION SKETCH LN 9 Z (SCALE: NON L
Pier (dock) length
(�
Groin length
en�5i ^�
��'\\�+�^ } `ia'
number
Bulkhead length
O S
max. distance offshore
Basin, channel dimensions'S�'�
cubic yards
Boat ramp dimensions
r+�
Other
Lke
This permit is subject to compliance with this application, site
drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine,
imprisonment or civil action; and may cause the permit to be-
come null and void.
This permit must be on the project site and accessible to the
permit officer when the project is inspected for compliance.
The applicant certifies by signing this permit that 1) this pro-
ject is consistent with the local land use plan and all local
ordinances, and 2) a written statement has been obtained from
adjacent riparian landowners certifying that they have no
objections to the proposed work.
applicant's signature
permit officer's signature
QI l)_NC ��,c) I LN\�6tA i i
issuing date expiration date
attachments , N \,cxi
In issuing this permit the State of North Carolina certifies that
this project is consistent with the North Carolina Coastal application fee 4'
Management Program.