Loading...
HomeMy WebLinkAbout26504_STOTESBERRY, BILLY RAY_20010320t Your project is subject to the Tar/Pamlic< River Basin Buffer Rules due CAMA and DREDGE AND FILL to its locati( within theTar/PamlicoBasin. Please ;�j G E N E R A L contact Deborah Sawyer at (252) 946- 6481. r ov, r;=, /c P E R M I T 1 as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Applicant Name Address City Project Location (County, State Road, Water Body, etc.) Type of Project Activity State Phone Number zip PROJECT DESCRIPTION SKETCH J (SCALE: �� ) Pier (dock) Length t Groin Length •r _ _ Fla 20 number _ Bulkhead Length max. distance offshore Basin, channel dimensions i cubic yards Boat ramp dimensions t7 other f __a 14 is.. nti I i f This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. issuing date applicant's signature permit officer's signature expiration date attachments application fee