Loading...
HomeMy WebLinkAbout27521_RICE, BRADFORD JR_20010216Your project is subject to the NC Division of Water Quality Neuse River Buffer Rules due to its location within the N —SeRivei Basin. CAMA and DREDGE AND FILL Please contact Deborah Sawyer at /.. s' 7 5` �— 252-946-6481 �7 � G E N E R A L PERMIT rs as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Applicant Name Phone Number Address City State Z i p Project Location (County, State Road, Water Body, etc.) Type of Project Activity PROJECT DESCRIPTION SKETCH { i (SEAL. Pier(dock)Length-[—,,:::;::::::'"',::"""I -_.... __. Groin Length number Bulkhead Length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other This permit is subject to compliance with this application, site drawing% - and attached general and specific conditions. Any violation of these terms --�I_ applicant's signature may subject the permittee to a fine, imprisonment or civil action; and 1 may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local issuing date expiration date land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. attachments In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. application fee North Carolina Department of Environment and Natural Resources 1 • Aa Division of Coastal Management ; Michael F. Easley, Governor RCDE�NR William G. Ross Jr., Secretary Donna D. Moffitt, Director February 19, 2001 Bradford Rice, Jr. 737 Country Club Drive Arapahoe, NC 28510 Dear Mr. Rice: Attached is General Permit ##C-27521 to maintain excavate a 70' x 20' x -2' NWL (not to exceed -4' NWL). Replace +/- 150' of bulkhead within existing alignment in Pamlico County adjacent to Lewis Branch off Neuse River at 737 Country Club Road off Hwy 306 in Minnesott Beach. In order to validate this permit, please sign all three (3) copies as indicated. Retain the white copy for your files and return the yellow and pink signed copies to us in the enclosed, self-addressed envelope. Your early attention to this matter would be appreciated. Sincerely, M. Scott Jones Coastal Management Representative MSJ/src Enclosures Morehead City District \ 151-B Hwy, 24, Hestron Plaza II Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: http://dcm2.enr,state.nc.us AN EQUAL OPPORTUNITY 1 AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMER PAPER Application for CAMA Minor Permit Feb. 5, 2001 Applicant Name: Brad Rice Phone: 252-249-0935 FEB Address: 737 Country Club Dr., Arapahoe, NC 28510 Project Location: Pamlico County, adjacent to Lewis Branch, tributary to the Neuse River off NC Hwy. 306 at 737 Country Club Dr. in the Minnesott Beach Community. Type of project activity: Install app. 150 feet of vinyl bulkhead landward of existing bulkhead (to be removed). Excavate app. 70 feet by 20 feet of sand in manmade canal. Construct app. 60 feet of sand FWD just west of existing rock jetty to limit frequency of excavation. Reference previous CAMA permit number 22276-C. Sketch: I UL IT 1eeRi. �IRaSlk7 j i%� a-4- I 01, II �w.lwrh �a �I fasT i MR's trlaMFy GAadrlt P,a�.T,aS j 1ru►,sha5 L I• I OF EytasTrn►§tsouu06Ok ^e_.c+—nu+aasiae7eT � j 1:2 DENR Waiver W. B. (Brad) Rice FEB 1 3 2001 737 Country Club Dr. Arapahoe, NC 28510 I hereby certify that I own property adjacent to the above reference property. The individual applying for this permit to do maintenance excavation, construct a sand fence, and replace a section of his bulkhead in Lewis Branch has shown me the permit request and discussed the current plan. I have no objections to this proposal. Sig ature Date Printed Name DENR Waiver W. B. (Brad) Rice FEB 2001 737 Country Club Dr. Arapahoe, NC 28510 I hereby certify that I own property adjacent to the above reference property. The individual applying for this permit to do maintenance excavation, construct a sand fence, and replace a section of his bulkhead in Lewis Branch has shown me the permit request and discussed the current plan. I have no objections to this proposal. /O d Signature �Q Da e Printed Name DENR Waiver W. B. (Brad) Rice 737 Country Club Dr. Arapahoe, NC 28510 FEB 13 Z001 I hereby certify that I own property adjacent to the above reference property. The individual applying for this permit to do maintenance excavation, construct a sand fence, and replace a section of his bulkhead in Lewis Branch has shown me the permit request and discussed the current plan. I have no objections to this proposal. 2 0 ignature ►� Da �/ I 1 1 CDa J-T'-7 Printed Name 02I07/2001 03:01 3366338515 FROM : BRAD AND LUCILLE RiCE uENERAL DYNAMICS ATS t HDgE f C, : 51 s 524 4063 PAGE 01 Feb. 07 2001 10:0-:>PM R'3 1 EWR Waiver W. B. (Brad) Rice 737 totviUy Club Dr. Arapahoe, NC 28510 I bareby cartify that I owh property adjacent to the above reference property. The individual applying For this permit to do ma; excavatiorr, construct a sand fence, and replace a section of his bulkhead in Lewis Branch has shown me the permit request and dWuased the Current plan. I have no objactions to this proposal, ignat i2� alt��1� Printed Name North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor William G. Ross Jr., Secretary Donna D. Moffitt, Director ITS/ 1:►�jP fjirl TO: Doug Huggett THROUGH: Ted Sampson DATE: February 19, 2001 SUBJECT: Charles W. Cook CAMA Major Permii .ire-`. �'"'• .�.. NCDENR fed u � ZdOI FROM: Dennis W. Hawthorn PIJ) Recommendations This proposal concerns the construction of 80 feet of bulkhead shoreline stabilization. The proposed bulkhead alignment location would be an average of 1 ft waterward of the NWL with a maximum distance waterward of 5 feet beyond the NWL. The maximum alignment is proposed in the location where the erosion escarpment is within 5 feet of the existing residential structure pilings. The southern 22 ft of the bulkhead alignment would be located behind all wetlands and connect to the neighboring lot. The remainder of the proposed bulkhead alignment, extending to the north, would follow a direct line to the bulkhead on the adjacent lot. For the next 45 feet, the alignment would cut through the wetland fringe, leaving approximately 2 feet of a 5 to 6 foot wetland fringe, waterward of the bulkhead. The bulkhead structure would result in the filling of approximately 160 sf of Public Trust Area, as well as the filling and associated loss of 400 sf of coastal wetland fringe habitat including Juncus roemerianus and Spartina alterniflora. This filling activity would remove that associated area of habitat and nutrient removal capacity along this waterway. The proposed shoreline stabilization and filling activity would result in an increase in turbidity levels, at least temporarily, along this portion of this waterway. The placement of a bulkhead structure along this shoreline would probably result in alteration of the shallow water habitat bottom adjacent to the existing shoreline. According to standards in the N. C. Administrative Code, Section 7H .0207, bulkheads are considered water dependent structures and their use to stabilize shorelines and prevent erosion is acceptable within Public Trust Areas. Shoreline stabilization has also been found to be consistent with the Division's current buffer rules. However, based upon 7H .0208(b)(7), bulkheads shall be constructed landward of significant marshlands or marsh grass fringes. According to 7H .0205 (d), existing Coastal Wetlands shall be afforded the highest priority of conservation and second priority shall be given to those types of development which provide water access and cannot function elsewhere. Elizabeth City District \ 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone:252-264-3901 \ FAX:252-264-3723 \ Internet: http://dcm2.enr.state.nc.us AN EQUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMER PAPER Doug Huggett Charles W. Cooke CAMA Major Permit Recommendations February 19, 2001 Page 2 Therefore, we must determine if the existing wetland fringe is significant. A wetland fringe might be considered significant if it is large enough to provide a food or habitat source for wildlife or have a vast enough root system to dissipate wave energy or receive enough regular/irregular flooding to provide nutrient removal benefits. Since this fringe is within an existing residential neighborhood where most of the adjacent lots or properties are developed, I believe it is unlikely this fringe would provide a significant habitat to local wildlife. An average 5 ft wide fringe might probably have a significant amount of root system remaining to provide some wave energy dissipation or nutrient removal benefits. However, the documented erosion escarpment is within 5 feet of the existing residential structure in one location and indicates that this fringe is not providing the necessary stabilization for the existing residential structure from shoreline erosion. Since it is unlikely that any remaining wetland fringe would provide any of the above referenced benefits associated with significant marshland fringes and the placement of the bulkhead landward of the NWL and this fringe would result in placing the wall within 5 feet of the residential structure, I conclude that it would be consistent with our rules to allow the placement of the bulkhead as proposed. In regard to these findings, I have no objection to the proposed development so long as the following conditions and Notes are incorporated in the subject permit. 11 Prior to the start of construction, the Permittee shall schedule and coordinate a pre - construction conference that will include DCM staff. The approved bulkhead alignment shall be staked within 30 days prior to the start of bulkhead construction, and this alignment shall be consistent with the approved platwork dated August 8, 2000. 2] No work, structures or fill materials will be placed at the work site or in any waters or wetlands, other than that work indicated on platwork dated August 8, 2000, and approved by this permit. The bulkhead structure will be constructed prior to any filling activity, shall be structurally tight, and shall be consistent with the approved, referenced platwork. All fill material must be free from debris or pollutants, and obtained from an upland source. NOTE Any future development on the permittee's property, other than that work authorized in this permit, may require modification of this permit or the issuance of a separate CAMA Permit. CC Raleigh Bland, US COE North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor William G. Ross Jr., Secretary Donna D. Moffitt, Director MEMORANDUM: NCDENR TO: Doug Huggett, DCM Major Permit Processing Coor inator N E-8 2 6 Z001 FROM: John A. Thayer Jr. AICP NE DCM District Planner Through: Ted Sampson, DCM Northern District Manager SUBJECT: Major Permit Request by William D. Bowling, A Proposal to Construct a Bulkhead & Fill 404 Wetlands, At Sunrise Court, Swan View Shores S/D, Colington Island, Dare County. DATE: February 23, 2001 Consistency: The proposal is consistent with and not in conflict w/the Dare County 1994 Land Use Plan certified by the CRC on July 29, 1994, amended January 23, 1998, and amended May 28, 1999. Overview: The applicant proposes to construct 86 ft. of bulkhead at NWL, plus return and fill about 4,400 sf. of 404 Jurisdictional Wetlands in the Swan View Shores Subdivision on Colington Island. LUP Policy: The Dare County Land Classification Map identifies the site area as "Limited Transition". Since the site also is within an Estuarine Shoreline AEC, it qualifies for the "Conservation" classification. The following policies are related to this request: Coastal Wetlands: Policy 2.1.2 (a) page 52. "Dare County advocates the use of existing state and federal regulatory programs as adequate measures for protecting and preserving coastal wetland areas of environmental concern." Estuarine Waters: Policy 2.1.2 (b), page 53. "Estuarine Shoreline development should continue to be managed to protect and preserve the natural resources of the estuarine waters. In addition, development located in estuarine waters shall be water -dependent, related to development on the estuarine shoreline, or an accessory use to a structure located on the estuarine shoreline." Estuarine Shoreline: Policy 2.1.2(d- 1), page 55. "Estuarine Shoreline development should continue to be managed to protect and preserve the natural resources along the Estuarine Shoreline". Freshwater Swamps and Marshes: Policy 2.1.2 (h-2), page 61 (as amended 1998) "Dare County supports the U.S. Army Corps of Engineers Nationwide Permit Program." Elizabeth City District \ 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \ FAX:252-264-3723 \ Internet: http://dcm2.enr.state.nc,us AN EQUAL OPPORTUNITY \ AFFIRMATWE ACTION EMPLOYER- 50% RECYCLED / 10% POST CONSUMER PAPER North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Sherri Evans -Stanton, Acting Secretary Donna D. Moffitt, Director January 10, 2001 TO: John A. Thayer, District Planner Division of Coastal Management A rn NCDENR FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: William D. Bowling Project Location: 104 Sunrise Court, Swan View Shores S/D, Colington Island in Dare County Proposed Project: Construct a bulkhead with return wall and fill Section 404 wetlands Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 31, 2001. If you have any questions regarding the proposed project, please contact Lynn W. Mathis at (252) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY: This office has no objection to the project as proposed. 4 This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This ice objects to the project for reasons described in the at comments. Al DATE / Elizabeth City District, 1367 U.S. Hwy. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \ FAX: 252-264-3723 \ Internet: http://dcm2.enr.state.nc.us/ AN EQUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED 110% POST CONSUMERPAPER North Carolina Department of Environment and Natural Resources 1jrt� Division of Coastal Management— — .MA Michael F. Easley, Governor NCDENR William G. Ross Jr., Secretary Donna D. Moffitt, Director MEMORANDUM: FES 2 6 2001 TO: Doug Huggett, DCM Major Permit Processing Coor i ator FROM: John A. Thayer Jr. AICP NE DCM District Planner. Through: Ted Sampson, DCM Northern District Manager SUBJECT: Major Permit Request by S. Thomas Hart & John Parker, A Proposal to Construct a Bulkhead, Boat Ramp, Boathouse & Maintenance Dredge A Manmade Canal, On Lots 11 & 12 Palmetto Drive In Frisco, Dare County. DATE: February 23, 2001 Consistency: The proposal is consistent with and not in conflict w/the Dare County 1994 Land Use Plan certified by the CRC on July 29, 1994, amended January 23, 1998, and amended May 28, 1999. Overview: The applicant proposes to place bulkhead along Lot 12, which will tie -into the bulkhead on Lot 11. Other improvements on Lot 12 include, boat ramp, dock, boathouse, and to maintenance dredge within the adjacent man-made canal. Anticipated impacts associated with request include: the filling of about 388 sf. of Coastal Wetlands, filling of 388 sf. of Public Trust Waters, about 400 sf. of shading, and the disturbance associated with dredging involving 1,900 sf. Public Trust Waters. Basis for Determinations: The Dare County Land Classification Map identifies the Frisco Village area within the "Limited Transition" Classification. County policy recognizes that all AEC areas also qualify for the "Conservation" Classification. Related County policy is as follows: Coastal Wetlands: Policy 2.1.2 (a) page 52. "Dare County advocates the use of existing state and federal regulatory programs as adequate measures for protecting and preserving coastal wetland areas of environmental concern." Estuarine Waters: Policy 2.1.2 (b), page 53. "Estuarine Shoreline development should continue to be managed to protect and preserve the natural resources of the estuarine waters. In addition, development located in estuarine waters shall be water -dependent, related to development on the estuarine shoreline, or an accessory use to a structure located on the estuarine shoreline." Estuarine Shoreline: Policy 2.1.2 (d-2), page 56. "Dare County supports the installation and maintenance of Estuarine bulkheads properly aligned and permitted by the U.S. Army Corps of Engineers and the Division of Coastal Management. Whenever possible, offshore estuarine beakwaters may be considered as an alternative to bulkhead construction. Elizabeth City District \ 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone:252-264-3901 \ FAX:252-264-3723 \ Internet: http://dem2.enr.state.nc.us AN FOUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMER PAPER North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor William G. Ross, Jr., Secretary Donna D. Moffitt, Director January 16, 2001 TO: John A. Thayer, District Planner Division of Coastal Management _ern NCDENR FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: S. Thomas Hart & John R. Parker Project Location: Lots 11 & 12 Palmetto Drive in Frisco, Dare County Proposed Project: Construct a bulkhead, boat ramp, boathouse and maintenance dredge a man-made canal Please indicate below your agency's position or viewpoint on the proposed project and return this form by February 6, 2001. If you have any questions regarding the proposed project, please contact Dennis W. Hawthorn at (252) 264-3901. When appropriate, in- depth comments with supporting data is requested. REPLY: o_ l This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. the project for reasons described in the DATE O �L 01,3 Elizabeth City District, 1367 U.S. Hwy. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \ FAX:252-264-3723 \ Internet: http://dcm2.enr.state.nc.us/ AN EQUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMERPAPER North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor William G. Ross Jr., Secretary Donna D. Moffitt, Director Mr. John Tyler 4745 Bayard Street Pittsburgh, Pennsylvania 15213 RE: Refinement of CAMA Major Permit #171-00 Dear Mr. Tyler: 0 A4 NCDENR FEB 2 6 2001 February 21, 2001 I have reviewed Environmental Professionals request to "Refine" CAMA Major Permit #171-00, issued to you for a bulkhead along the Currituck Sound in Monteray Shores PUD, in Currituck County. The request submitted extends the length of the permitted bulkhead from 51' to 64'. Division of Coastal Management has no objections to the change being requested, with one exception. The "Refinement" will not authorize any work beyond the lateral bounds of your property. The enclosed survey reveals that the adjacent bulkhead on Lot # 120 does not extend to your property as originally indicated. The proposed 64' bulkhead would include approximately three feet of encroachment onto the adjacent property, which cannot be authorized by this permit. This Refinement will not authorize any encroachment onto the adjacent property, and will result in the reduction of the bulkhead length from 64' to approximately 62'. A copy of this Permit Refinement should be kept with the original permit at all times. All conditions and stipulations of the original permit remain in force under this Refinement except as altered herein and shown on the attached plan, revised by Division staff and dated, February 21, 2001. The site plan revisions reflect the following changes: 1) deletes a two foot bulkhead encroachment onto the adjacent property; and, 2) adjusts the 30' buffer based on the location of normal water level, as flagged by the Division on February 21, 2001. If you have any questions, or I can be of any assistance, do not hesitate to contact me at (252) 264-3901. Sincer ly Ted Sampson District Manager TS/lm Enclosures Cc: George Wood, Environmental Professionals Charles S. Jones, Assistant Director Doug Huggett, Major Permit Coordinator Raleigh Bland, COE Elizabeth City District \ 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone:252-264-3901 \ FAX:252-264-3723 \ Internet: http://dcm2.enr.state.nc.us AN EOUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER - 50 % RECYCLED / 10% POST CONSUMER PAPER =Y ENVIRONMENTAL PROFESSIONALS INC. PLANNING FOR A BETTER ENVIRONMENT January 30, 2001 Ted Sampson Ms. Lynn Mathis Division of Coastal Management 1367 US 17 South Elizabeth City, NC 27909 RE: John Tyler, Lot 119, Monteray Shores, Currituck County CAMA Major Permit #171-00 Dear Mr. Sampson and Ms. Mathis, This letter is with reference to John Tyler's CAMA Major Permit #171-00. After the Normal Water Level Line (NWL) was staked by Ms. Mathis and surveyed, we realized the original bulkhead alignment approved through this CAMA Major Permit was not accurate. In order to proceed with an accurate survey, we would like to request a refinement to this permit to realign the proposed bulkhead along the shoreline (from permitted length of 51' to the refinement length of 64') with a maximum of 12'-15'of disturbance in the 30' buffer for placement of backfill and tiebacks, and a realignment of the retaining wall extending from the bulkhead (from permitted 45' to the refinement length of 68'). The total square footage of 404 wetland fill will change from 3,272 s.f. to 2,331 s.f. Enclosed is a revised plat with the realignment of the proposed bulkhead and return wall with the approval of this refinement letter. I appreciate your help and if you have any questions please do not hesitate to call 252-441-0239. Sincerely, Roxanne D. Dorman P.O. BOX 3368 • KILL DEVIL HILLS, NORTH CAROLINA 27948-3368 • 252-441-0239 MONTMA SHORE`W, YMALEHEAD Clue X ISLA14D I VICINITY MAP N.T.S. i EAST1NC, BULKHEAD CURRITUCK SOUND , '�� �"�' KiUSAP (p ACKFIL.L/TIE BACK FILL NOT TO EXCEED 12' . 30' CAMA BLFTER RETURN WAU RE(AW I NVt r WA."_ J. AppjZcx, 771 � L .5' ' r Z OD / 30; � 1 JLn / r - i'� elo 1 fL I p �ti8• LOT 120 f LOT 118 b Ym i it ` AREA OF 404 WETLAND FILL j;bbSSr t J NFW DDW- Al (E}__I1, oil C1 QQ W .. , �9�, .$OUTH . HARBOR VIEW' _ pf� N1Jl 0 CL. INT �.. SMMDSIDE Cy - . • . - 5- NAR90R vt�w PK .. 5 .ORfVE1Mto LAT.JIp Y''�'✓^ � '7 _ - ENVIRONMENTAL PROFESWONALa, INC. FUmrAng for a Better Bnvaronawnt 2810 N. CROATAN HIGHWAY P.O. BOX 3w KILL DEVIL EM-% NC 27948 44,40 (M)441-0239 (252)441-TM (PAN) BDSrA LOT 119 WNT'ERAY SHORES JOHN TYLER SEC'TEON 2 PHASE 1 COROLLA CURRMJCK CAUNTY NORTH CARO NA SCALEL 1-30' DAIS 1/29/01 REV.: 2/05/0l DRAWN 8Y: RW RUVIEWED BY: GW` "1: OUM At 1 /I<o o NOT FOR PERNW iING PiJXFCGES ONLY