HomeMy WebLinkAbout28814_REAVIS, DANNY_20010803Applicant Name
Address
CAMA and DREDGE AND FILL
G E N E R A L
PERM I T
as authorized by the State of North Carolina
Department of Environment and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC
Phone Number
City State zip
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity
IPROJECT DESCRIPTION
Pier (dock) Length
Groin Length
number
Bulkhead Length
max. distance offshore
Basin, channel dimensions
cubic yards
Boat ramp dimensions
Other
/r! A I -
This permit is subject to compliance with this application, site drawing
and attached general and specific conditions. Any violation of these terms applicant's signature
may subject the permittee to a fine, imprisonment or civil action; and _
may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit of- permit officer's signature
ficer when the project is inspected for compliance. The applicant certi-
fies by signing this permit that 1) this project is consistent with the local issuing date expiration date
land use plan and all local ordinances, and 2) a written statement has
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work. attachments
In issuing this permit the State of North Carolina certifies that this project _
is consistent with the North Carolina Coastal Management Program. application fee
5999
DANIEL A. REAVIS
KATHRYN REAVIS DL.3215296 .,
303 RAVEN RD. PH. 704-546-2607��r J r�l 66-112/531
HARMONY, NC 28634 2 45003
BUT mii8�
BRANCH BANKING AND TRUST COMPANY G O O
/MOCKSVILLE, NORTH CAROLINA
�nro biP��iPrY'�� ,f�iurtaro- - f�l/
1:0 5 3 LO L L 2 14 S 1 1 2898 L84ii' 5999
FIG. I
FIG. 2
FOUNDATION
SEAWALL
to
MAR
0
_ Raised Pour Foundation po+fjo�
0
A Raised Pour Foundation should u�QYll
be used it additional height is
needed for the boat to clear the p O.
seawall (i.e. deep hull boats).
1
/
_y
Y
e4
�,iv'z MX 19,?7"-,,, 1 S�51 C4) --7�5 1A
aP5
L-o%o-f"(gA1-
FIG.1
FIG.2
FOUNDATION it I itI
SEAWALL
.ate
I IZM R Q'
J
3.4 s�e 0
e e9.n4
/ � 4
/I Y�F p0 J
Raised Pour Foundation a tjo
A Raised Pour Foundation should ���J1
be used if additional height is ti ��
needed for the boat to clear the p o`•
seawall (i,e. deep hull boats). - o
I I
\
I
I /
\
/
II{1` \
/
_y
r : ►�ir�w r
LOCATION:
MONITORING & COMPLETION REPORT
[LAMA Major Development & State Dredge & Fill Permits]
PERMIT # % iJ ( d —
FIELD REP. ` r-�)
PHONE: �Joc�>f;4(o — � L-cq DATE REPORTEDLY COMPLETE: tI
DATE OF INSPECTION ) —A /("' J(� (
1) Do th 'Measured dimensions of the development differ from those indicated in the permit and workplat?
YES/ �[circle one].
COMMENT:
2) SEDIMENTATION & EROSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized all
disturbed areas? YES/NO [circle one]
COMMENT:
i
3) FUTURE MOKI`ORING & ENFORCEMENT ACTION: Is further investigation or enforcement action
needed? YES' O ircle one].
COMMENT: