Loading...
HomeMy WebLinkAbout28814_REAVIS, DANNY_20010803Applicant Name Address CAMA and DREDGE AND FILL G E N E R A L PERM I T as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Phone Number City State zip Project Location (County, State Road, Water Body, etc.) Type of Project Activity IPROJECT DESCRIPTION Pier (dock) Length Groin Length number Bulkhead Length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions Other /r! A I - This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms applicant's signature may subject the permittee to a fine, imprisonment or civil action; and _ may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- permit officer's signature ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local issuing date expiration date land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. attachments In issuing this permit the State of North Carolina certifies that this project _ is consistent with the North Carolina Coastal Management Program. application fee 5999 DANIEL A. REAVIS KATHRYN REAVIS DL.3215296 ., 303 RAVEN RD. PH. 704-546-2607��r J r�l 66-112/531 HARMONY, NC 28634 2 45003 BUT mii8� BRANCH BANKING AND TRUST COMPANY G O O /MOCKSVILLE, NORTH CAROLINA �nro biP��iPrY'�� ,f�iurtaro- - f�l/ 1:0 5 3 LO L L 2 14 S 1 1 2898 L84ii' 5999 FIG. I FIG. 2 FOUNDATION SEAWALL to MAR 0 _ Raised Pour Foundation po+fjo� 0 A Raised Pour Foundation should u�QYll be used it additional height is needed for the boat to clear the p O. seawall (i.e. deep hull boats). 1 / _y Y e4 �,iv'z MX 19,?7"-,,, 1 S�51 C4) --7�5 1A aP5 L-o%o-f"(gA1- FIG.1 FIG.2 FOUNDATION it I itI SEAWALL .ate I IZM R Q' J 3.4 s�e 0 e e9.n4 / � 4 /I Y�F p0 J Raised Pour Foundation a tjo A Raised Pour Foundation should ���J1 be used if additional height is ti �� needed for the boat to clear the p o`• seawall (i,e. deep hull boats). - o I I \ I I / \ / II{1` \ / _y r : ►�ir�w r LOCATION: MONITORING & COMPLETION REPORT [LAMA Major Development & State Dredge & Fill Permits] PERMIT # % iJ ( d — FIELD REP. ` r-�) PHONE: �Joc�>f;4(o — � L-cq DATE REPORTEDLY COMPLETE: tI DATE OF INSPECTION ) —A /("' J(� ( 1) Do th 'Measured dimensions of the development differ from those indicated in the permit and workplat? YES/ �[circle one]. COMMENT: 2) SEDIMENTATION & EROSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized all disturbed areas? YES/NO [circle one] COMMENT: i 3) FUTURE MOKI`ORING & ENFORCEMENT ACTION: Is further investigation or enforcement action needed? YES' O ircle one]. COMMENT: