Loading...
HomeMy WebLinkAbout26857_NC DOT_20010116Applicant Name CAMA and DREDGE AND FILL 1 268574 GENERAL DI PERMIT rJUN 0 7 2001� as authorized by the State of North Carolina COASTAL MANAGEMENT Department of Environment and Natural Resour es_arad-t-boQ9F-Resoafces Commission in an area of environmental concern pursuant to 15 NCAC : Phone Number Address & S0 �i � Zi? ''`�City r- 7 Project Location (County, State Road, Water Body, etc.) c _ `71 Type of Project Activity = P L �g c PROJECT DESCRIPTION Pier (dock) Length Groin Length number Bulkhead Length max. distance offshore Basin, channel dimensions cubic yards Boat ramp dimensions other" F `4 A; This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- ficer when the project is inspected for compliance. The applicant certi- fies by signing this permit that 1) this project is consistent with the local land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. applicant's signature permit officer's signature rt Yny issuing date expiration date „ o attachments application fee 3 @ 11;2"X 7 5 " 6APA (iy17 � e z 5 6' ►.3� f AVi TO 5 iS !13 0 U„ Q�YPf J,°zaG�7l� L: y 1V C, a 790", Ilia Sn� I/3l /IlLA n+, Hea�ws � 19 -V l A NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS COUNTY: PROJECT: DATE: /— >- 0� SUBJECT: Plan&X-sec SCALE:, SHEET: I of Form DCM-MP-5 BRIDGES AND CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. 1. BRIDGES a. Public Private b. Type of bridge (construction material) c. Water body to be crossed by bridge d. Water depth at the proposed crossing at MLW or NWL e. Will proposed bridge replace an existing bridge? Yes No If yes, (1) Length of existing bridge (2) Width of existing bridge (3) Navigation clearance underneath existing bridge (4) Will all, or a part of, the existing bridge be removed? (Explain) f. Will proposed bridge replace an existing culvert(s)? Yes No If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) g. Length of proposed bridge h. Width of proposed bridge i. Height of proposed bridge above wetlands j. Will the proposed bridge affect existing water flow? Yes No If yes, explain k. Navigation clearance underneath proposed bridge 1. Will the proposed bridge affect navigation by reducing or increasing the existing navigable opening? Yes No If yes, explain m. Will the proposed bridge cross wetlands containing no navigable waters? Yes No If yes, explain n. Have you contacted the U.S. Coast Guard concerning their approval? Yes No If yes, please provide record of their action. 2. CULVERTS a. Water body in which culvert is to be placed Halls Creek b. Number of culverts proposed 3 c. Type of culvert (construction material, style) Aluminum d. Will proposed culvert replace an existing bridge? x Yes No If yes, (1) Length of existing bridge 35 feet (2) Width of existing bridge 24.2 feet Revised 03/95 Form DCM-M -5 (3) Navigation clearance underneath existing bridge 2 feet (4) Will all, or a part of, the existing bridge be removed? (Explain) all e. Will proposed culvert replace an existing culvert? Yes x No f If yes, (1) Length of existing culvert (2) Width of existing culvert (3) Height of the top of the existing culvert above the MHW or NWL (4) Will all, or a part of, the existing culvert be removed? (Explain) Length of proposed culvert 112" (2) Width of area to be excavated (3) Amount of material to be excavated in cubic yards c. Will the placement of the proposed bridge or culvert require any highground excavation? x Yes No If yes, (1) Length of area to be excavated 10 feet (2) Width of area to be excavated 20 feet (3) Amount of material to be excavated in cubic yards + /- 30 cubic yards d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area authorized NC DOT disposal area (upland site) g. Width of proposed culvert 75" (2) Dimensions of spoil disposal area h. Height of the top of the proposed culvert above the (3) Do you claim title to the disposal area? MHW or NWL x Yes No If no, attach a letter granting permission from i. Will the proposed culvert affect existing water flow? the owner. Yes x No (4) Will the disposal area be available for future If yes, explain maintenance? x Yes No (5) Does the disposal area include any coastal wetlands (marsh), SAVs, or other wetlands? j. Will the proposed culvert affect existing navigation Yes x No potential? Yes x No If yes, give dimensions if different from (2) If yes, explain above. (6) Does the disposal area include any area below the MHW or NWL? Yes x No 3. EXCAVATION AND FILL If yes, give dimension if different from No. 2 above. a. Will the placement of the proposed bridge or culvert e. Will the placement of the proposed bridge or culvert require any excavation below the MHW or NWL? result in any fill (other than excavated material x Yes No described in Item d. above) to be placed below If yes, MHW or NWL? x Yes No (1) Length of area to be excavated 40 feet If yes, (2) Width of area to be excavated 60 feet (1) Length of area to be filled 40 feet (3) Depth of area to be excavated 1 foot (2) Width of area to be filled 60 feet (4) Amount of material to be excavated in cubic (3) Purpose of fill fill around culverts yards 89 Cubic yards b. Will the placement of the proposed bridge or culvert f. Will the placement of the proposed bridge or culvert require any excavation within: result in any fill (other than excavated material n Coastal Wetlands n SAVs n Other Wetlands described in Item d. above) to be placed within: If yes, n Coastal Wetlands n SAVs n Other Wetlands (1) Length of area to be excavated If yes, (1) Length of area to be filled Revised 03/95 Form DCM-MP-S (2) Width of area to be filled (3) Purpose of fill g. Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d. above) to be placed on highground? x Yes No If yes, (1) Length of area to be filled 40 feet (2) Width of area to be filled 60 feet (3) Purpose of fill fill over culverts 4. GENERAL a. Will the proposed project involve any mitigation? Yes x No If yes, explain in detail b. Will the proposed project require the relocation of any existing utility lines? Yes x No If yes, explain in detail c. Will the proposed project require the construction of any temporary detour structures? Yes x No If yes, explain in detail d. Will the proposed project require any work channels? Yes x No If yes, complete Form DCM-MP-2 e. How will excavated or fill material be kept on site and erosion controlled? Best management Practices f. What type of construction equipment will be used (for example, dragline, backhoe or hydraulic dredge)? Excavator, dumptrucks, crane g. Will wetlands be crossed in transporting equipment to project site? Yes x No If yes, explain steps that will be taken to lessen environmental impacts. h. Will the placement of the proposed bridge or culvert require any shoreline stabilization? x Yes No If yes, explain in detail aluminum headwall and Wings, erosion control stone on unstable slopes Kristen Shacochis Environmental Officer Applicant or Project 'e Signature Date Revised 03/95