Loading...
HomeMy WebLinkAbout28413_CALE, HATCHER_20010815CAMA and DREDGE AND FILL G E N E R A L OCT a Zoos ,>�13 � P E R M I T u I .�- as authorized by the State of North Carolina Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC 1 ,%e -t f Phone Number-� 2Address Applicant Name city 'If i lLl State Zip Project Location (County, State Road, Water Body, etc.) t `-' `L . =ely�' N k ,. + =• ':``r! CAA n �� + j Type of Project Activity 1'�' r PROJECT DESCRIPTION SKETCH FF\, (SCALE: Pier (dock) Length t A, . Groin Length 1 number Bulkhead Length max. distance offshore Basin, channel dimensions F cubic yards M.. ' ' y\ - (' Boat ramp dimensions i r s I •,� _3 Other � 1. 4� � a1 ..:_ f F+ This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms a licant's signature may subject the permittee to a fine, imprisonment or civil action; and — may cause the permit to become null and void. This permit must be on the project site and accessible to the permit of- permit officer's signature ficer when the project is inspected for compliance. The applicant certi- r' ' t /ji fies by signing this permit that 1) this project is consistent with the local issuing date expiration date land use plan and all local ordinances, and 2) a written statement has F ' been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. attachments In issuing this permit the State of North Carolina certifies that this project is consistent with the North Carolina Coastal Management Program. /I,, applicad' oo fee MONITORING & COMPLETION REPORT [CAMA Major Development & State Dredge & Fill Permits] PERMITTEE' S NAME: l 0 S PERMIT # LOCATION: II Cps - FIELD REP. PHONE: 2� DATE REPORTEDLY COMPLI✓TE: DATE OF INSPECTION 1) Do the7sured dimensions of the development differ from those indicated in the permit and workplat? YESNircle one]. COMMENT: 2) SEDIMENTATION & EROSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized all disturbed areas? YES/NO [circle one] COMMENT: 3) FUTURE MO ORING &ENFORCEMENT ACTION: Is further investigation or enforcement action needed? YES [circle one]. COMMENT: