Loading...
HomeMy WebLinkAbout25282_RTI TELECOMMUNICATIONS SERVICES_20000830CAMA and DREDGE AND FILL oil G E N E R A L In � t � � 25282 E P R MIT ° 2°°° as authorized by the State of North Carolina COAS MOREH A DEMENT Department of Environment and Natural Resources and t e oa Commission in an area of environmental concern pursuant to 15 NCAC -1 �4 L oC) Applicant Name � 1� f'=�nrva,^a��lLChi I h1�C S6,p= Phone Number (9 (q)— �&t D —2-700 Address C1t� '� �k t k: �► t� ec� 3, City ter. r State G- zip Project Location (County, State Road, Water Body, etc.) p �r�f� - oU -'` i! c Lc ,-�P �Ti-Ac C,N0-e r- , h 1 izu 6ba- © Type of Project Activity k Ir 71 C, CA Q t� PROJECT DESCRIPTION SKETCH (SCALE: ) This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine, imprisonment or civil action; and may cause the permit to become null and void. applicant's signature This permit must be on the project site and accessible to the permit of- permit officer's signature ficer when the project is inspected for compliance. The applicant certi- - j �. �' 61 fies by signing this permit that 1) this project is consistent with the local issuing date expiration date land use plan and all local ordinances, and 2) a written statement has been obtained from adjacent riparian landowners certifying that they have no objections to the proposed work. attachments In issuing this permit the State of North Carolina certifies that this project D is consistent with the North Carolina Coastal Management Program. application fee 0 cti sl 10' MnRA- MUM a BORE CONTINUES INTO BRUNSWICK COUNTY 1, 517 Fy-,,n cdSc ;6j 29;,%d52, c to ey� 0i2 I c-rt METHOD 1IF CONSTRUCTION ONE 5� 'NCH STEEL DRILL PIPE (HORIZONTAL UNDER :.HE RIVER BEYOND HIGHWATER LINE OK THE HL C, DOT R/V). DRILL E,!TRY AND EXIT WILL BE NO CLOSER THAN 7t, TO ANY BODIES OF WATER OR WETLANDS, CAPE FEAR MEMORIAL BRIDGE(LIFT SPAN) APPROX. DRILL LENGTH 1622' SURRY IT �.-217�—+-{ 1 B' A wta" 10' BORE EN IRY — 694' PLACING FIBER OPTIC CABLE AT THE CAPE FEAR RIVER MEMORIAL BRIDGE AT WILMINGTON, f HTI TELECOMMUNICATIONS SERVICES