HomeMy WebLinkAbout28200_TOWN OF ATLANTIC BEACH_20010806CAMA and DREDGE AND FILL #AP
G E. N E R A LQ�
bidPERM IT
as authorized by the State of North Carolina _j �g�-,QC,.1-7
Department of Environment and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC ; , ;
Applicant Name
Address
Phone Number ' f 1 s F t
City State ^Jc Zip i
Project Location (County, State Road, Water Body, etc.)
, r
Type of Project Activity ^ , - -1t Nan, I.rra uc. e • ` 1 1,; .Pr; .
PROJECT DESCRIPTION SKETCH f,((,
i J 1
(SCALE:
Vex/r.
)
Pier (dock) Length
_
Groin Length t•t
tt
` �(• a '»s
t
I
t
number fit
a
(� .. (lr ;
F
.
'
Bulkhead Length j
max. distance offshore a tl
r ;
J, f., F
{
!
?
Basin, channel dimensions
`
A
1
!p
r
14
i
cubic yards
_._.
..M ......... .........
.... ....._.
...._ ........_
Boat ramp dimensions
Other
t i
This permit is subject to compliance with this application, site drawing
and attached general and specific conditions. Any violation of these terms
may subject the permittee to a fine, imprisonment or civil action; and
may cause the permit to become null and void.
This permit must be on the project site and accessible to the permit of-
ficer when the project is inspected for compliance. The applicant certi-
fies by signing this permit that 1) this project is consistent with the local
land use plan and all local ordinances, and 2) a written statement has
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work.
In issuing this permit the State of North Carolina certifies that this project
is consistent with the North Carolina Coastal Management Program.
i• �, a w' . Jam. �o:'��
applicant's signature
permit officer's signature
issuing date expiration date
1ST'C:
attachments
application fee
BROOKS DREDGING &
MARINE CONSTRUCTION INC.
507 BAYVIEW DR., PH. 252-728-6886
HARKERS ISLAND, NC 28531
2317
66-152/531
DATE 7- YO-0 /
I
0-0
S—ity 1, tures
ftluda
o W'ls w Nm
OVIA
Wachovin Bank N.A.
shy., 2ttSN
NP
. LLFORPJO�
lie
11.0 3 '*S 0 IS 291: S1.1�13 D03D?Io
00000 2 17 1.0 31
/ i COASTALMANAGEMENT
MOREHEAD
' G �
r
l �.50
SoUKe((n�'35 7! o(llu w
'(03 i
he
aykicled offf �
u
ro t�-d
hWff 5
_10
L
�a�e c'Reef(
�_
Re: Hoop Hole Creek
Subject: Re: Hoop Hole Creek
Date: Wed, 01 Aug 2001 14:53:18 -0400
From: Mike Marshall <Mike.Marshall@ncmail.net>
To: Brad Shaver <Brad.Shaver@ncmail.net>
This looks like it fits under our typical, informal dredge moratorium
exemption: less than a thousand cubic yards of maintenance dredging in a
sandy substrate. If it doesn't begin until after August 15, so much the
better. Thanks for the inquiry. Please continue to call on these type of
projects even though we can usually work something out.
Thanks,
Mike
Brad Shaver wrote:
> Mike,
> Recently the Town of Atlantic Beach has requested to conduct
> maintenance dredging within Hoop Hole Creek. There was some questions
> raised as to whether this was ever dredged in the past but after looking
> through 16 years of aerials there appeared to be a man made connection.
> I attached a map showing the proximity of the project.
> My request from you is whether or not to place a moratorium on the
> project due to fisheries impact. I went out with the Town and contrctor
> last week and the bottom is sandy with nothing to indicate grass in the
> dredge area or just outside the proposed channel. Take a look at the map
> and please respond with any thoughts or possible conditions.
> Brad Shaver
> Field Rep., DCM-Morehead City
> ------------------------------------------------------------------------
> Name: HoopHole.ppt
> HoopHole.ppt Type: Powerpnt File (application/ppt)
> Encoding: base64
> Download Status: Not downloaded with message
1 of 1 8/1/01 3:18 PM
MONITORING & COMPLETION REPORT
[CAMA Major Development & State Dredge & Fill Permits]
PERMI=E' S NAME: Ivor of A f to H� i afa 4
PERMIT# Z,9L0o-(
LOCATION: M oy tt e 4 &ot No fe (,-PP �, du c, c 4,4 nG ( ; � FIELD REP. S�a ✓�^ r
gocut JPu�d
PHONE: 32b - /A b DATE REPORTEDLY COMPLETE:
1) Do the measured dimensions of the development differ from those indicated in the permit and workplat?
YEK90 circle one].
COMMENT:
2) SEDIMENTATION &EROSION CONTROL: Has Permittee seeded, grassed, or otherwise stabilized
all disturbed areas?��INO [circle one]
COMMENT:
3) FUTURE MONITORWQ & ENFORCEMENT ACTION: Is further investigation or enforcement
action needed? YES/ O circle one].
COMMENT: