HomeMy WebLinkAbout27771_ALSTON, PAUL_20010822Your project is subject to the Tar/Pamlico
CAMA and DREDGE AND FILL River Basin Buffer Rules due to its_ -
location within flijar/Painlico Bq'si .
G E N E R A L Please contact D' eborah SawVyer or of
4
PERMIT Steffens at (252) 9-tG-G481.
__ 3 1 2001
as authorized by the State of North Carolina„ �.
Department of Environment and Natural Resources ano tlt C� i 10"Ices
in an area of environmental concern pursuant to 15 N�AE-=� J
Applicant Name ! - ; ��� �� ��-, rca r-.., Phone Number D % a
,�r 1
Address ::4 � \ .•t.t\ k ,._4
27771-
Gi',�, �<.u, C,�&
WV
)mmission
City State tvs_ Zip
Project Location (County, State Road, Water Body, etc.)
Type of Project Activity , • ` • s I 3H t- �1 f �. ` a 'c
PROJECT DESCRIPTION SKETCH �L` i' '' (SCALE: (` w CJ :
Pier (dock) Length
Groin Length
number
11A.61-
Bulkhead Length
max. distance offshore i
f
Basin, channel dimensions
cubic yards
Boat ramp dimensions . 4
Other {
k.
TF
u
This permit is subject to compliance with this application, site drawing
and attached general and specific conditions. Any violation of these terms
I �� applicant's signature
may subject the permittee to a fine, imprisonment or civil action; and
may cause the permit to become null and void.
-`
This permit must be on the project site and accessible to the permit of-
permit officer's signature
ficer when the project is inspected for compliance. The applicant certi-
%s ua
fies by signing this permit that 1) this project is consistent with the local
issuing date expiration date
land use plan and all local ordinances, and 2) a written statement has
�` ��� �';
been obtained from adjacent riparian landowners certifying that they
have no objections to the proposed work.
r attachments
In issuing this permit the State of North Carolina certifies that this project,
LI1.3 `;+� .� '; ; C�
is consistent with the North Carolina Coastal Management Program.
application fee