Loading...
HomeSearchMy WebLinkAboutNCDOT 224-87 04/17/2017NCDOT 224-87 09/23/2016NCDOT 224-87 Berm Construction 11/28/2017NCDOT 224-87 Construction Ferry DivisionNCDOT 224-87 Dredge Request 03/26/2018NCDOT 224-87 Ferry Division 03/05/2020NCDOT 224-87 Intent to Dredge Ferry Division 2NCDOT 224-87 Intent to Dredge Ferry Division (5)NCDOT 224-87 Intent to Dredge Ferry Division (6)NCDOT 224-87 Intent to Dredge Ferry Division 04/18/22NCDOT 224-87 Intent to Dredge Ferry Division 1NCDOT 224-87 Intent to Dredge Ferry Division 3NCDOT 224-87 Intent to Dredge Ferry Division 4NCDOT 224-87 Intent to Dredge Ferry Division 5NCDOT 22487 Maintain Berm 01/12/2018NCDOT 224-87 Maintenance 08/19/2022NCDOT 224-87 Maintenance 10/04/2022NCDOT 224-87 Maintenance Derdging 09/07/2017NCDOT 224-87 Maintenance Dredging 01/11/2017NCDOT 224-87 Maintenance Dredging 01/27/2017NCDOT 224-87 Maintenance Dredging 02/23/2016NCDOT 224-87 Maintenance Dredging 04/01/2015NCDOT 224-87 Maintenance Dredging 05/11/2017NCDOT 224-87 Maintenance Dredging 07/08/016NCDOT 224-87 Maintenance Dredging 09/20/2016NCDOT 224-87 Maintenance Dredging 10/17/2016NCDOT 224-87 Maintenance Dredging 11/21/2016NCDOT 224-87 Maintenance Dredging 12/30/2015NCDOT 224-87 Maintenance Dredging Ferry Division 09/25/19NCDOT 224-87 Maintenance Dredging Ferry Division 10/12/2020NCDOT 224-87 Maintennce Dredging Ferry Division 04/03/20NCDOT 224-87 Moratorium - Southdock Maintenance Dredging 4/17/2024NCDOT 224-87 Repair Ferry DivisionNCDOT 224-87 Repair/Maintain Bulkhead 10/02/208NCDOT 224-87 Repair/Maintain Bulkhead 11/09/2017NCDOT 224-87 Repair/Maintain Erosion Control Structures 10/15/2018NCDOT 224-87 Repair/Maintain Ferry Terminal 12/04/2017NCDOT 224-87 Sandbag Placement Ferry Division 07/31/2020NCDOT 224-87 Shoreline Stabilization 06/25/2017