Loading...
HomeMy WebLinkAboutAQ_F_0900009_20210203_CMPL_InspRpt NORTH CAROLINA DIVISION OF FChemours 7Regional Office AIR QUALITY -Fayetteville Works 0009 Inspection Report n/017 Date: 02/24/2021 Facility Data Permit Data Chemours Company-Fayetteville Works Permit 03735/T48 22828 NC Highway 87 West Issued 5/13/2020 Fayetteville,NC 28306 Expires 3/31/2021 Lat: 34d 50.6700m Long: 78d 49.8750m Class/Status Title V SIC: 2869/Industrial Organic Chemicals,nec Permit Status Active NAICS: 32512/Industrial Gas Manufacturing Current Permit Application(s)TV-Sign-501(b)(2) Part II,TV-Significant,TV-Renewal,TV- Contact Data 502(b)(10) Facility Contact Authorized Contact Technical Contact Program Applicability Christel Compton Dawn Hughes Christel Compton SIP/Title V/112r Program Manager Plant Manager Program Manager MACT Part 63: Subpart DDDDD, Subpart FFFF, (910)678-1213 (910)678-1415 (910)678-1213 Subpart ZZZZ NSPS: Subpart De, Subpart 1II1 Compliance Data Comments: Inspection Date 02/03/2021 Inspector's Name Evangelyn Lowery-Jacobs Inspector's Signature: Operating Status Operating Compliance Status Compliance-inspection Action Code FCE Date of Signature: d2Jyt/?vtj Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP 2019 1.73 0.2100 62.47 281.28 28.97 1.0000 30536.60 2018 1.68 0.2100 65.87 299.95 29.83 0.9400 35869.00 2017 3.97 0.2000 61.63 239.09 33.86 3.97 34586.00 *Highest HAP Emitted(in pounds) Five Year Violation Year Violation Histoo Date Letter Tvvc Rule Violated Violation Resolution Date 04/17/2020 NOV 2D .0515 Particulates from Miscellaneous Industrial 04/29/2020 Processes Chemours Company—Fayetteville Works Compliance Inspection Report Page 2 of 15 Performed Stack Tests since last FCE: Date Test Results Test Method(s) Source(s)Tested 01/28/2021 Pending 09/02/2020 Pending 09/01/2020 Pending 06/25/2020 Pending 06/24/2020 Pending 16121/2020 Pending 06/03/2020 Pending 02/29/2020 Compliance NS-A,NS-B,NS-C,NS-D-1,NS- G-1,NS-G-2,NS-H,NS-I,NS- L.14A,NS-M,NS-N,NS-O,NS-P 02/19/2020 Pending 11/21/2019 Pending 09/26/2019 Pending 03/01/2019 Pending I. DIRECTIONS TO SITE: Chemours Company-Fayetteville Works is located off of NC Highway 87 in Bladen County. From FRO,head south on Green Street toward Maiden Lane. At the traffic circle,take the 2nd exit onto Gillespie Street for approximately 1 mile. Turn right onto the ramp to Elizabethtown and merge onto Highway 87 south. Travel approximately 15 miles and turn left onto County Line Road,which is the entrance to the facility. Follow the signs to check in at the security gate. Yt II. SAFETY CONSIDERATIONS: The usual FRO safety gear is required(hardhat, safety glasses, safety shoes, hearing protection). Entry into several areas of the plant requires specialized safety gear. In the HFPO reactor and MMF process areas,personnel are not allowed to enter unless the process is not operating due to the possibility of explosion hazards of the chemical reaction process. III. FACILITY DESCRIPTION: Chemours Company-Fayetteville Works is a chemical manufacturing facility located in Bladen County. The facility was formerly owned by DuPont. The facility employs approximately 500 employees and 250 full-time contractors on a 24 In,7 day per week basis. The facility consists of four individual manufacturing plants,a boiler house and a waste treatment operation. Several processes have PSD avoidance conditions. The facility has two permanent boilers onsite,one permanent boiler which is permitted but not yet constructed,and one permitted temporary boiler. IV. INSPECTION SUMMARY: On Wednesday,February 3,2021,I,Evangelyn Lowery-Jacobs,of the DAQ Fayetteville Regional Office,conducted a compliance inspection with Christel Compton,Program Manager. Due to the COV D-19 pandemic,the compliance inspection was scheduled prior to the visit to discuss logistics and any PPE requirements. The inspection was conducted in 2 parts: an online Microsoft Teams records review, immediately followed by an onsite visit for an outdoor facility tour including visible emissions observations. Ms. Compton reviewed the FacFinder sheet and noted that all information is correct. Facility records were reviewed for emissions calculations and control device inspections. We discussed the changes in permitted emission sources since the previous inspection/permit modification and reviewed all of the new emissions sources listed on the permit. There are extensive electronic records for the facility operations available on the local computer area network. Ms. Compton was able to display PSD data and other facility processing and operational records via computer for review. For the operating areas,screenshots of flow rates and pressure drops in scrubbers were provided by technicians available in the control rooms of the respective areas. Boilers(PS-A and PS-B)were operating,firing natural gas. The third permitted boiler(PS-C)is not yet constructed. The permitted temporary boiler(PSC-Temp)is not currently on site and was not on site during 2020. The Lime Processing System(ID Nos.NS-RI and NS-R2)was not operating during the inspection. All other processes were in operation during the inspection. I observed zero visible emissions from each of the operating source emission points. Chemours Company—Fayetteville Works Compliance Inspection Report Page 3 of 15 V. PERMITTED EMISSION SOURCES: At the time of the inspection,Chemours Company—Fayetteville Works was operating under Permit No.03735T48 which includes the following emission sources: EmissiunSpurae ID hidx "« misstog p96 rte llpscripYiou a ce t1� Control De ice Deso vpttigl PS-A Natural Gas/No.2 fuel oil-fired boiler Case-by-case (139.4 million Btu per hour maximum heat input) N/A N/A MACT equipped with an oxygen trim system MACT DDDDD OPERATING PS-B Natural Gas/No.2 fuel oil-fired boiler Case-by-case (88.4 million Btu per hour maximum heat input) N/A N/A MACT equipped with an oxygen trim system MACT DDDDD OPERATING PS-C Natural Gas/No.2 fuel oil-fired boiler NSPS De (97 million Btu per hour maximum heat input) Case-by-case equipped with a low-NOx burner and N/A N/A MACT an oxygen trim system MACT DDDDD NOT YET CONSTRUCTED Natural Gas/No.2 fuel oil-fired boiler PS-Temp (less than 100.0 million Btu per hour N/A N/A maximum heat input) NOT ON SITE AT THIS TIME NS-A Hexfluoropropylene epoxide(HFPO)process MACT FFFF F OPERATING POS NS-B Vinyl Ethers North process POS Baffle-plate scrubber(7,000 NCD-Hdrl kilo am/hour liquid injection rate MACT FFFF OPERATING �' q j NS-C V nyl Ethers South process averaged over a 3-hour period) MACT FFFF OPERATING RSU ProcessRA(except S03 System) Baffle-plate scrubber(7,000 coon NS D-1 y ) or kilogram hour liquid injection rate OPERATING NCD-Hdr2 averaged over a 3-hour period) NS-E FPS Liquid waste stabilization OPERATING AOS Thermal Oxidizer(10 million Btu AOS per hour,natural gas-fired) NCD-QI 4-Stage Scrubber: Countercurrent MF process _ Packed Bed Stages 1,2, and 3; NS-F M OPERATING -and Caustic Stage 4 with minimum NCD-Q2 scrubber liquor flow of 40 gallons per minute and minimum pH of 7.1 NS-G-2 IXM Resins Process Fluorinator NCD-G2 Caustic scrubber MACT FFFF F RSU Process S03 System: Wet scrubber with mist eliminator NS D-2 S03 Storage Tank,Vaporizer, S03 Truck NCD-D (minimum liquid injection rate of Unloading,Reservoir Tank 0.5 gallons per minute) NS-H M membrane process N/A i N/A OPERATING I Chemours Company—Fayetteville Works Compliance Inspection Report Page 4 of 15 pt�s l�o S4n Emtssian Source Descri ton, D`fi�vcicoen,tIDro l ' CautrolDevice,DoMptionk NS-I IXM membrane coating I N/A N/A OPERATING SW-1 Semiworks polymerization operation OPERATING Semiworks laboratory hood SCD-SW l Carbon Adsorber SW-2 OPERATING NS G-1 DCM Resins Process(except Fluorinator) MACT FFFF OPERATING NS-K E 2 Process OPERATING TFE/CO2 separation process (NOTE: Although NS-M is routed through one of NS-M two baffle plate scrubbers,NCD-Hdrl and NCD- Hdr2,the non-acid fluoride emissions from this source are not removed in the scrubber.) OPERATING HYPO product container decontamination process POS POS (NOTE:Although NS-N is routed through one of N/A N/A NS-N two baffle plate scrubbers,NCD-Hdrl and NCD- Hdr2,the non-acid fluoride emissions from this AOS AOS source are not removed in the scrubber. NCD-QI Thermal Oxidizer(10 million Btu OPERATING per hour,natural gas-fired) Vinyl Ethers North product container -and- decontamination process NCD-Q2 4-Stage Scrubber:Countercurrent (NOTE:Although NS-O is routed through one of Packed Bed Stages 1,2,and 3; NS-O two baffle plate scrubbers,NCD-Hdrl and NCD- Caustic Stage 4 with minimum Hdr2,the non-acid fluoride emissions from this scrubber liquor flow of 40 gallons source are not removed in the scrubber.) per minute and minimum pH of 7.1 OPERATING Vinyl Ethers South product container decontamination process (NOTE:Although NS-P is routed through one of NS-P two baffle plate scrubbers,NCD-Hdrl and NCD- Hdr2,the non-acid fluoride emissions from this source are not removed in the scrubber.) OPERATING VE-North Indoor Fugitives NCD-Q3 a e NS-B-2 Carbon Adsorber OPERATING VE-South Indoor Fugitives NS C2 NCD-Q4 Carbon Adsorber OPERATING ACD-Al Wet scrubber(30 gallons per minute water injection rate averaged over a AS-A Polymer Processing Aid Process 3-hour period) OPERATING State-enforceable only -and- ACD-A2 Carbon Adsorber Chemours Company—Fayetteville Works Compliance Inspection Report Page 5 of 15 SS40n" 011l'�''. i� h r. , z �.• ^..�..COLtI'dI am iss Source Dos �tion autr 17)evib Descrtptitra '� 4 Extended aeration biological was tewater WTS-A treatment facility N/A N/A OPERATING WTS B Two(2)Indirect steam-heated Wet scrubber with mist eliminator WTS-C to sludge dryers WTCD-1 State-enforceable only I OPERATING NS-RI Lime Silo NCD Rl Pulse Jet Baghouse NOT OPERATING (300 square feet of filter area) Lime Slaker Wet Particulate Scrubber NS-R2 TNCD-R2 (minimum liquid in rate of NOT OPERATING 0.84 gallons per minute) VI. APPLICABLE AIR QUALITY REGULATIONS: Regulations will be discussed for each of the various manufacturing processes as listed on the current air permit. 6• Powerhouse(Boilers PS-A,PS-B,and PS-C) The facility is permitted to operate one Natural Gas/No.2 fuel oil-fired boiler(139.4 mmBtu/hr maximum heat input,PS-A),one Natural Gas/No.2 fuel oil-fired boiler(88.4 mmBtu/hr maximum heat input,PS-B),and one Natural Gas/No.2 fuel oil-fired boiler with low-NOx burner(97 mtnBtu/hr maximum heat input,PS-C). The third boiler(PS-C)has not yet been constructed. According to Ms. Compton,this boiler will not be constructed anytime soon,as there is no current need for additional steam capacity. Both of the existing boilers are currently combusting natural gas. The larger boiler(PS-A)has a steam capacity of 113,000 pounds of steam per hour(139.4 mmBtu maximum heat input)and was manufactured in 1969. The smaller boiler(PS-B)was manufactured in 1982 with a steam capacity of 72,000 pounds per hour(88.4 mmBtu/hr maximum heat input). They are both pre-NSPS boilers;however,Boiler PS-B has a PSD avoidance condition for NO.and 5O2. Boiler PS-C will be subject to NSPS Subpart Dc when constructed. Chemours has a facility-wide PSD SO2 emissions limitation of 702.5 tons per consecutive 12-month period. A. 15A NCAC 02D.0503 PARTICULATES FROM FUEL BURNING DMIRECT HEAT. EXCHANGERS—Particulate emissions from boilers PS-A and PS-B shall not exceed 0.26671bs/mmBtu. Particulate emissions from PS-C shall not exceed 0.2268 lbs/mmBtu. No monitoring/recordkeeping/reporting is required. APPEARS IN COMPLIANCE—The AP-42 emissions factor for Natural Gas is 0.0071bs/mmBtu and for No.2 fuel oil is 0.024 lbs/mmBtu. As long as the facility only combusts these fuels,they should not exceed the emission limits. The facility is currently combusting natural gas. The last#2 fuel oil was combusted in January 2018 during a short natural gas curtailment(28,350 gallons of No.2 fuel oil combusted). The#2 fuel oil used is ultra-low sulfur content(< 15 ppm sulfur by weight.) B. 15A NCAC 02D.0516 SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES—The sulfur dioxide emissions from boilers PS-A and PS-B shall not exceed 2.3 pounds per million Btu heat input while firing natural gas or No.2 fuel oil, and the sulfur dioxide emissions from boiler PS-C shall not exceed 2.3 pounds per million Btu heat input while firing natural gas only. No monitoring/recordkeeping/reporting is required. APPEARS IN COMPLIANCE—The AP-42 emissions factor for Natural Gas is 0.001 lbs/mmBtu and for No.2 fuel oil(with 0.5%sulfur content by weight)is 0.507 lbs/mmBtu. All No.2 fuel oil is ultra-low sulfur fuel oil(< 15 ppm sulfur content by weight.)The facility should never exceed the SO2 emission limit while combusting either natural gas or#2 fuel oil. Ms. Compton produced a bill of lading for the last fuel oil shipment which indicated the sulfur content to be< 15 ppm. Chemours Company—Fayetteville Works Compliance Inspection Report Page 6 of 15 C. 15A NCAC 02D.0521 CONTROL OF VISIBLE EMISSIONS—Visible emissions from Boiler PS-A shall not exceed 40%opacity. Visible emissions from PS-B and PS-C shall not exceed 20%opacity. No monitoring/recordkeeping/reporting is required. APPEARS IN COMPLIANCE—The boilers were combusting natural gas and I observed 0%opacity from the boiler stack during the inspection. Boiler PS-C has not yet been constructed. D. 15A NCAC 02D.0524 NEW SOURCE PERFORMANCE STANDARDS—SUBPART Be(for PS-C only)—The sulfur content of fuel combusted in the new boiler(PS-C)shall not exceed 0.5%by weight and visible emissions are limited to 20%opacity. Written notifications are required for construction commencement and startup within 30 days after these events. The facility must conduct Method 9 testing after boiler start-up if using No.2 fuel oil. The facility must maintain records of fuel usage and fuel oil certifications. Records of startup, shutdown,and malfunctions must also be maintained. A semi-annual summary report is required. APPEARS IN COMPLIANCE—Boiler PS-C has not yet commenced construction,and there are no current plans to install this unit. Therefore,none of the above requirements have been triggered. The last semi-annual report was received at FRO on 01/27/2021 and appeared complete. E. 15A NCAC 02Q.0317 PREVENTION OF SIGNIFICANT DETERIORATION AVOIDANCE CONDITIONS(PS-B only)—Emissions from Boiler PS-B shall not exceed the following: 40 TPY NOx, and 40 TPY S02. The Permittee shall keep monthly records of fuel usage, fuel sulfur content,and maintain fuel certifications. A semi-annual report is required, listing monthly emissions(17-month period),fuel usage,and sulfur content. The Permittee must also list all deviations from the requirements in the report. APPEARS IN COMPLIANCE—All records show that the facility is well below these emissions limits. The highest 12-month total NOx emissions during 2020 were 6.6 tons and S02 emissions were 0.0 tons. The last semi-annual report was received at FRO on 01/27/2021,which noted no deviations. F. 15A NCAC 02D.1109 CASE-BY-CASE MACT—This condition includes requirements for boilers PS-A, PS-B,and PS-C that were instituted as a result of the vacating of the Boiler MACT. Requirements include an annual inspection and tune-up of each boiler each calendar year. Records of inspections and tune-ups are required. A semi-annual report is required, starting January 30,2014. APPEARS IN COMPLIANCE—The facility complied with this standard until May 19,2019 and is no longer applicable. The condition was superseded by the requirements of NESHAP Subpart DDDDD beginning as of May 20,2019. G. 15A NCAC 02D.1111 MAXIMUM ACHIEVABLE CONTROL TECHNOLOGY—Requires that the Permittee comply with the requirements of NESHAP Subpart DDDDD beginning as of May 20,2019 for the boilers PS-A,PS-B,and PS-C. Includes the requirement for a one-time energy assessment,which must be conducted prior to May 20,2019. Initial tune-ups for existing boilers PS-A and PS-B must be conducted no later than May 20,2019 and subsequently every 5 years. An initial startup notification is required for boiler PS-C not later than 15 days after actual startup. Compliance reports submitted every 5 years. APPEARS IN COMPLIANCE—The one-time energy assessment was completed 02/11 -02/13/2019. The initial tune-ups for boilers PS-A and PS-B were conducted on 02/12/2019 and 10/25/2018,respectively. Boiler PS-C has not yet been constructed. Chemours Company-Fayetteville Works Compliance Inspection Report Page 7 of 15 y FPS/IXM Process Area The operation produces a variety of relatively uncommon monomer and polymer chemicals. Some of the monomers are shipped offsite,while others are used onsite in the production of various polymers. The polymers are shipped offsite or used onsite to produce Nafion®membrane material. A principal'use of this membrane is in the electrolysis cells for production of chlorine and sodium hydroxide at chloro-alkali plants. The two waste gas scrubbers located at the FPS/IXM process area are used to control the emissions of various pollutants including hydrogen fluoride and other acid fluorides. The HFPO,Vinyl Ethers North and South, and the IXM Resins processes(ID Nos.NS-A,NS-B,NS-C,and NS-G)are subject to the Miscellaneous Organic NESHAP, Subpart FFFF and are classified as existing sources under this regulation. H. 15A NCAC 02D.0515 PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES- Particulate matter emissions from the membrane coating process NS-I shall not exceed E=4.10*P067. The Permittee shall maintain production records. A semi-annual summary report is required. APPEARS IN COMPLIANCE-The initial permit application indicated that compliance would be achieved based on the process description as permitted. No changes to the process have been made since that application, and therefore compliance is indicated Production records were made available by Ms. Compton for each manufacturingfacility. The last semi-annual summary report was received at FRO on 0112712021 and appeared complete. I. 15A NCAC 02D.0516: SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES - Emissions of sulfur dioxide from the Thermal Oxidizer(ID No.NCD-Ql)shall not exceed 2.3 pounds per million Btu heat input.No monitoring/recordkeeping/reporting is required. APPEARS IN COMPLIANCE-The AP-42 emissionsfactorfor Natural Gas is 0.0011bs/mmBtu. The facility should never exceed the S02 emission limit while combusting natural gas in the thermal oxidizer. J. 15A NCAC 02D.0521 CONTROL OF VISIBLE EMISSIONS-Visible emissions from the membrane coating process(ID No.NS-I),the S03 System(ID No.NS-D-2),and the outlet of the 4-Stage Scrubber (ID No.NCD-Q2)shall not exceed 20%opacity. No monitoring,recordkeeping, or reporting is required. APPEARS IN COMPLIANCE-I observed no visible emissions from any of the sources during this inspection. K. 15A NCAC 02Q.0317 PREVENTION OF SIGNIFICANT DETERIORATION AVOIDANCE CONDITIONS-VOC emissions from the Vinyl Ethers North process,NS-B,shall not exceed 68.9 TPY VOC. The Permittee shall keep monthly records of VOC emissions. A semi-annual report is required. APPEARS IN COMPLIANCE- VOC emissions are calculated using stack test results, material balances, and flow rates/concentrations on a monthly basis. These records are submitted to Ms. Compton within 30 days of the end of the previous month. Records indicate that the highest 12-month VOC emissions during 2020 were 4.84 tons which was lower than previously recorded due to installation of the thermal oxidizer. The last semi-annual report was received at FRO on 0112712021 and appeared complete. L. 15A NCAC 02Q.0317 PREVENTION OF SIGNIFICANT DETERIORATION AVOIDANCE CONDITIONS-Emissions from the resin process NS-G-1 and NS-G-2 shall not exceed 40 TPY VOC. The Permittee shall keep monthly records of VOC emissions. A semi-annual summary report is required. APPEARS IN COMPLIANCE-Records indicate that the highest 12-month VOC emissions during 2020 were ll.51 tons. The last semi-annual summary report was received at FRO on 0112712021 and appeared complete. Chemours Company—Fayetteville Works Compliance Inspection Report Page 8 of 15 M. 15A NCAC 02Q.0317 PREVENTION OF SIGNIFICANT DETERIORATION AVOIDANCE CONDITIONS—Emissions from the resin process NS-A shall not exceed 85.3 TPY VOC. The Permittee shall keep monthly records of VOC emissions. A semi-annual summary report is required. APPEARS IN COMPLIANCE—Records indicate that the highest 12-month VOC emissions during 2020 were 18.44 tons. The last semi-annual summary report was received at FRO on 0112712021 and appeared complete. N. 15A NCAC 02Q.0317 PREVENTION OF SIGNIFICANT DETERIORATION AVOIDANCE CONDITIONS—Emissions from the HFPO Product Container Decontamination Process(NS-N)shall not exceed 40 TPY VOC. The Permittee shall keep monthly records of VOC emissions. The Permittee shall also maintain records of dates each container is decontaminated and total mass of VOC removed from each container. A semi-annual summary report is required. APPEARS IN COMPLIANCE—Records indicate that the highest 12-month VOC emissions during 2018 were 3.05 tons. The last semi-annual report was received at FRO on 0112712021 and appeared complete. O. 15A NCAC 02D.0530(u)USE OF PROJECTED ACTUAL EMISSIONS TO AVOID APPLICABILITY OF REQUIREMENTS OF PSD—Requires the facility to maintain records of annual VOC emissions from the IXM Membrane Coating Process(ID No.NS-I)for 10 years following the startup of the modified process. An annual report is required within 60 days after the end of the calendar year. If the projected actual emissions of 67.27 tons per year,as stated in the permit application,are exceeded,an explanation as to why the actual rates exceeded the projection must be included in the annual report. APPEARSIN COMPLIANCE—The IXMMembrane Coatingprocess modification started operation on May 1, 2017. The Actual VOC emissions in 2018 were 40.4 tons. The startup notification was received at FRO on 05108/17. The latest annual report was received at FRO on 0112 712 02 1 and appeared complete. P. 15A NCAC 02D.1111 MAXIMUM ACHIEVABLE CONTROL TECHNOLOGY(MACT)40 CFR Part 60 Subpart FFFF: MISCELLANEOUS ORGANIC NESHAP(MON)—The BFPO,Vinyl Ethers North and South,and the IXM Resins processes(ID Nos.NS-A,NS-B,NS-13-2,NS-C,NS-C-2,NS-G-1, and NS-G-2)must comply with all provisions of this MACT. The MON requires 99%control efficiency for some Group 1 sources;however, Chemours determined that their sources are not subject to the stricter requirements of a control device. The Permittee shall monitor and inspect all the valves,pumps, compressors,agitators,and connectors for leaks using the instrument monitoring methods described in 40 CFR 63.1023(b)-(c). All equipment affected by the leak requirements shall be identified. The Permittee shall create and retain a record of the monitoring schedule for each process unit. If a leak is identified,it shall be repaired as provided in the repair provisions of this section. After a leak has been repaired,the valve shall be monitored at least once within the first 3 months after its repair. This requirement is in addition to the monitoring required to satisfy the defmition of repaired and first attempt at repair. The required periodic monitoring may be used if it satisfies the timing requirement of this condition. The Permittee shall repair each leak detected as soon as practical,but not later than 15 calendar days after it is detected. The facility operates two process heat exchangers that are subject to the MON. Monitoring for presence of a leak in a heat exchanger system requires that three samples of both the cooling water entrance to and exit from the heat exchanger be monitored for the presence of hazardous air pollutants monthly for the first six months of operation and quarterly thereafter. A semi-annual summary report is required. APPEARS IN COMPLIANCE—The scrubbers currently controlling the HFPO, Vinyl Ethers North and South, and the IXM Resins processes(ID Nos.NS-A,NS-B,NS-B-2,NS-C,NS-C-2,NS-G-1, and NS-G-2) meet the control efficiency requirement. The scrubbers were tested at 99.6%efficiency in August 2003 (further data indicates that the efficiency was only 99.1%). Initial notification was received on 2 March 2004. However, no controls are required for this facility based on HAP content, THE values, and other various parameters. The facility has an extensive LDAR program, and inspects all the valves,pumps, compressors, agitators, and connectors for leaks on a monthly basis. Records are available at the site. Chemours Company—Fayetteville Works Compliance Inspection Report Page 9 of 15 Each affected unit has a physical tag for equipment identification. Three samples of both the cooling entrance and exit are taken at the heat exchangers to analyze for leaks on a monthly basis. The facility also submits a semi-annual report for MACT Subpart FFFF There were no deviations from the emission limits, operating limits, or work practice standards during 2020. The last semi-annual summary report was received at FRO on 0112712021. Amore.extensive MACT FFFF report is submitted to EPA and FRO also, which includes several items not required in the Title V permit but are required by the MALT. The facility has a "zero leak"policy. If a leak is discovered, it is fixed ASAP, even if the process must be shut down. No delay ofrepair scenarios are normally permitted by the facility's LDAR policy, but they are allowed under the MA CT regulation. According to the facility records, no delays of repair occurred in any of the facility processes during 2020. Q. 15A NCAC 02Q.0519(a)(7)and CONSENT ORDER(State Enforceable Only)—The permittee shall reduce emissions of all PFAS,including GenX Compounds, from the following sources:HFPO Process, Vinyl Ethers North Process,Vinyl Ethers South Process,RSU Process,FPS Liquid Waste Stabilization Process,MMF Process,E-2 Process,TFE/CO2 Separation Process,HFPO Product Container Decontamination Process,VEN Product Decontamination Process,and VES Product Container Decontamination Process(ID Nos. NS-A,NS-B,NS-C,NS-D-I,NS-E,NS-F,NS-G-I,NS-K,NS-M,NS- N,NS-O,and NS-P)by the following: • Install and begin normal operation of a Thermal Oxidizer in series with a 4-Stage Scrubber System(ID Nos.NCD-QI and NCD-Q2). • The Thermal Oxidizer and 4-Stage Scrubber System shall reduce emissions of all PFAS,including GenX Compounds,by at least 99.99 percent. The Permittee shall perform inspections and maintenance as recommended by the manufacturer. Develop, and submit to DAQ for approval,a site-specific monitoring plan. Install, calibrate,maintain,and operate CMS for the Thermal Oxidizer with a minimum combustion chamber temperature of 1800 degrees Fahrenheit(3-hour rolling average)and maximum Thermal Oxidizer inlet gas feed rate 2,200 pounds per hour(3-hour rolling average). Install,calibrate,maintain,and operate CMS for the 4-Stage Scrubber System with the scrubber liquor flow shall be a minimum of 40 gallons per minute and a minimum scrubber liquor pH,no less than 7.1 (3-hour rolling average). Quarterly reporting of monitoring and recordkeeping activities. APPEARS IN COMPLL4NCE- The following inspections were conducted for the thermal oxidizer and scrubber system: Thermal Oxidizer on 1011512020; Scrubber Tank on 10/1512020; and Liquid Mist Separator on 1012112020. The minimum combustion chamber temperature was 2017°F with a set point of 2012°F. The oxidizer inlet gas feed rate was 275 Ibs/hr. The scrubber liquid f ow was maintained at 86 gpm with a pH of 8.1. The operating parameters were well within the requirements of the current permit during the inspection. The latest annual report was received at FRO on 0112712021 and appeared complete. +e Polymer Processing Aid(PPA)Process(all sources labeled with AS-and ACD-) The polymer processing aid process,formerly the ammonium perfluorooctanoate(APFO)process,began operation in December of 2002. Formerly,the Polymer Processing Aid reaction process used perfluorooctanoic acid(PFOA-brought in by truck in its iodide/salt form)reacted with sodium hydroxide(stored in totes)to form the acid fluoride. The acid fluoride was then reacted with ammonia to produce the ammonium salt. Fuming sulfuric acid(oleum)is received by truck and used as a solvent in the process. Currently,APFO and the associated(PFOA),also known as C8,are not regulated as toxic or hazardous air pollutants. However,the EPA has been reviewing the chemical with the possibility of its designation in the future as a regulated pollutant. Due to historical pollution and health effects concerns and recent controversy regarding the DuPont facility in West Virginia,and the recent activities by the U.S.EPA to develop and review toxicity data for this chemical,the DAQ file includes several documents and articles related to APFO,PFOA,or C8. The APFO process was subject to the 112(r)chemical accident prevention program for oleum. DuPont made a decision to eliminate APFO by 2015, and therefore the PPA process at the Fayetteville Works was modified,and no longer produces APFO and is no longer subject to 112(r)written risk management plan requirements. The replacement for APFO is HFPO Dimer Chemours Company—Fayetteville Works Compliance Inspection Report Page 10 of 15 Acid,which is currently also under scrutiny. R. 15A NCAC 02D.1100 CONTROL OF TOXIC AIR POLLUTANTS(State Enforceable Only)— Emissions from the PPA facility shall be controlled by a wet scrubber. The liquid flow rate in the packed bed section shall be a minimum of 30 gallons per minute and the differential pressure across the bed shall be a maximum of 12 inches of water,based on three-hour averages. An alarm is required for the pressure monitoring. Records of all inspections shall be kept in a logbook. No reporting is required. APPEARS IN COMPLIANCE—The scrubber is interlocked so that the system will shut down, almost instantaneously, if the parameters are exceeded The facility will go into shutdown mode if the three-hour average is less than 30 gpm or pressure is 5 inches of water. The system is setup such that upon startup after an extended shutdown, the scrubber must be operated for three hours to establish the minimum 3-hour average prior to allowing the startup of the remaining equipment. The polymer processing aid chemical is a surfactant; therefore, the AP increases occasionally due to 'suds'in the scrubber. The liquid flowrate during the inspection was 38 gpm, and the pressure drop across the scrubber bed was-0.66"H2O. The last internal inspection of the scrubber was performed on 1011912019. 6• Wastewater Treatment Area(all sources labeled with WTS-and WTCD-) For the wastewater treatment operations,the Title V permit specifies two rotary sludge dryers controlled by an impingement-type wet scrubber with mist eliminator. The Miscellaneous Organic NESHAP(MON)also addresses emissions from wastewater. With respect to quantity of emissions,methanol is the most significant air pollutant from the wastewater treatment operation. S. 15A NCAC 02D.1806 CONTROL AND PROHIBITION OF ODOROUS EMISSIONS—The wastewater treatment facility shall not operate without implementing management practices or installing and operating odor control equipment sufficient to prevent odorous emissions from the facility from causing or contributing to objectionable odors beyond the property boundary. The sludge dryers shall be controlled by a caustic injection scrubber. An I&M logbook is also required for the scrubber. No reporting is required. APPEARS IN COMPLIANCE—Odorous emissions from the sludge dryers are controlled by a scrubber utilizing potassium hydroxide solution. Wastewater treatment odors were not noted at boundary lines. The sludge dryers are located inside a building. The facility keeps maintenance records for the scrubber in their electronic maintenance program. The most recent inspection of this scrubber was conducted on 0910912019. Ms. Compton stated that no odor complaints have been received by the facility. FRO has not received any odor complaints relating to this facility. •L Temporary Boiler(PS-Temp) This boiler is permitted to combust Natural Gas/No.2 fuel oil and is brought on-site on an`as needed'basis. There is currently no temporary boiler on site. The temporary boiler was last on site during the period 11/19/12 through 01/09/13 and utilized natural gas for fuel. T. 15A NCAC 02D.0503 PARTICULATES FROM FUEL BURNING INDIRECT HEAT EXCHANGERS—Particulate emissions from the temporary boiler shall not exceed 0.2426 lbs/mmBtu. No monitoring/recordkeeping/reporting is required. APPEARS IN COMPLIANCE—The AP-42 emissions factor for Natural Gas is 0.0071bs/mmBtu and for No. 2 fuel oil is 0.0241bs/mmBTU The boiler was not on site during this inspection. U. 15A NCAC 02D.0516 SULFUR DIOXIDE EMISSIONS FROM COMBUSTION SOURCES—Sulfur Dioxide emissions from the temporary boiler shall not exceed 2.3 lbhnmBtu heat input. No monitoring/recordkeeping/reporting is required. The boiler was not on site during this inspection. APPEARS IN COMPLIANCE—The AP-42 emission factor for Natural Gas is 0.00 1 lb/mmBtu and for Chemours Company—Fayetteville Works Compliance Inspection Report Page 11 of 15 No. 2 fuel oil burning ultra-low sulfur content oil(< 15 ppm Sulfur by weight) is 0.002 lb/mmBtu. Therefore, the source will not exceed the limits while combusting either of these permitted fuels. The boiler was not on site during this inspection. V. 15A NCAC 02D.0521 CONTROL OF VISIBLE EMISSIONS—Visible emissions shall be no more than 20%opacity. No monitoring/recordkeeping/reporting is required. APPEARS IN COMPLIANCE—The source was not on site during the inspection. While combusting either natural gas or ff2 fuel oil, it is expected that there will be no visible emissions from this source(VE _ 0%opacity). W. 15A NCAC 02Q.0317 AVOIDANCE OF 15A NCAC 02D.0530 PREVENTION OF SIGNIFICANT DETERIORATION—The temporary boiler PS-Temp shall discharge into the atmosphere less than 40 tons of S02 per consecutive 12-month period. Monthly records of fuel usage are required. Monthly calculation of S02 emissions and rolling 12-month S02 emissions are required. A semi-annual report is required. APPEARS INCOMPLIANCE—The boiler was not onsite during this inspection. The last semi-annual report was received at FRO on 0112712021 and appeared complete. X. 15A NCAC 02Q.0317 AVOIDANCE OF 15A NCAC 02D.1109 CASE-BY-CASE MACT FOR BOILERS AND PROCESS HEATERS AND OF 40 CFR 63 SUBPART DDDDD MACT FOR BOILERS AND PROCESS HEATERS—The temporary boiler shall remain onsite for no longer than 180 consecutive days. If it is onsite for more than 180 consecutive days,the facility must notify the regional office within 10 days of exceeding the 180-day period. A startup notification is required within 15 days after startup of the boiler. APPEARS IN COMPLIANCE—The boiler was not onsite during 2020..No notifications have been required. •J Lime Silo and Slaker(all sources labeled with NS-and NCD-) Lime processing system to process the weak hydrofluoric acid collected from the underflow of the scrubber system. Aqueous 18 percent,by weight,HF acid from the Thermal Oxidizer/Scrubber system is introduced to a Crystallizer with a lime slurry,where calcium fluoride(CaF2)crystals are formed.The CaF2 is dried in the filter press and the solids are loaded into trucks for offske disposal. The facility receives pebble or hydrated calcium oxide(CaO),or lime,which is stored in a lime silo prior to being mixed into a wet,calcium hydroxide lime slurry in the Lime Slaker which is then fed to the Crystallizer. Y. 15A NCAC 02D.0515 PARTICULATES FROM MISCELLANEOUS INDUSTRIAL PROCESSES— Particulate matter emissions from the membrane coating process NS-Rl and NS-R2 shall not exceed E=4.10*P0 6'. Install,operate,and maintain a wet scrubbing liquid flowmeter on each scrubber. Daily records for daily scrubbing liquid flow rates(greater than 0.84 gallons per minute)are required. Particulate matter emissions from the Lime Silo(ID Nos.NS-RI)shall be controlled by the bagfilter(ID Nos.NSD-RI). Records are required for monthly visual and annual internal inspections. A semi-annual summary report is required. APPEARS IN COMPLIANCE—The initial permit application indicated that compliance would be achieved based on the process description as permitted. No changes to the process have been made since that application, and therefore compliance is indicated The scrubber system was not operating during the inspection; however, the scrubbing liquid f ow rate was 1.7 gpm during the most recent date of operation on 0113112021, Inspection records were provided by Ms. Compton for review during the onsite visit. The last semi-annual summary report was received at FRO on 0 112 712 02 1 and appeared complete. Chemours Company—Fayetteville Works Compliance Inspection Report Page 12 of 15 Z. 15A NCAC 02D.0521: CONTROL OF VISIBLE EMISSIONS—Visible emissions from the Lime Silo and Lime Slaker(ID Nos.NS-Rl and NS-R2)shall not be more than 20 percent opacity when averaged over a six-minute period. Weekly observations for any visible emissions above normal and maintained in a logbook. A semi-annual summary report is required. APPEARS IN COMPLIANCE—I observed 0%opacity from the Lime Silo and Lime Slaker during the inspection. The last semi-annual summary report was received at FRO on 0112712021 and appeared complete. ➢ Multiple Emission Source(s)Specific Limitations and Conditions •- Boilers AA.15A NCAC 02Q.0317 PREVENTION OF SIGNIFICANT DETERIORATION AVOIDANCE CONDITIONS—Emissions from the boilers(PS-A,PS-B,PS-C,and PS-Temp)shall not exceed 702.5 tons of S02 per consecutive 12-month period. Records must be maintained for the quantities of fuels used monthly. Fuel supplier certification must be maintained for fuel oil shipments. A semi-annual report is required. APPEARS IN COMPLIANCE—The highest 12-month rolling total S02 emissions during the past 15 months from the 4 boilers was 0.2 tons. Current fuel is natural gas. Fuel oil certifications are available in the company records on site. #2 fuel oil used is ultra-low suer content(< 15 ppm sulfur by weight.) Some No. 2 fuel oil was combusted in January 2018(28,350 gallons) during a short natural gas curtailment. The last semi-annual report was received at FRO on 0112712021 and appeared complete. C• Facility-Wide BB.15A NCAC 02D.1100 CONTROL OF TOXIC AIR POLLUTANTS(State Enforceable Only)—The Permittee shall maintain records of production rates,throughputs,material usage,excess emissions,and control equipment failures. A quarterly summary report is required. APPEARS IN COMPLIANCE—Production rates, material usages, emissions, and equipmentfailure records are available on the company electronic data system. TAP reports are submitted quarterly and show emissions well below the 2D.1100 limits. The last quarterly report was received at FRO on 0 112 712 02 1 and appeared complete. CC.15A NCAC 02D.1100 CONTROL OF TOXIC AIR POLLUTANTS(State Enforceable Only)—The Permittee shall emit less than the limits listed in the permit for HF from high dispersion stacks and from all other sources. The Permittee shall also report quarterly all TPER exceedances,the maximum I-hour emission rate and the maximum 24-hour emissions rate. The liquid flow rate in the Baffle Plate-Type Scrubbers(NCD-Hdr-1 and NCD-Hdr-2)shall be a minimum 7,000 kg/hr each. Ensure the proper performance of the Thermal Oxidizer and 4-Stage Scrubber System(ID Nos.NCD-QI and NCD-Q2)by complying with the requirements specified in Consent Order. The Permittee shall maintain a logbook of all inspection and maintenance activities on the applicable scrubber. A quarterly report is required. APPEARS IN COMPLIANCE—The Baffle Plate-Type Scrubbers(NCD-Hdr-I and NCD-Hdr-2)are no longer operational as ofstartup of the thermal oxidizer on 1213112019. The following inspections were conducted for the thermal oxidizer and scrubber system: Thermal Oxidizer on 1011512020;Scrubber Tank on 1011512020; and Liquid Mist Separator on 1012112020. The last quarterly report was received at FRO on 0112712021 and appeared complete. Chemours Company—Fayetteville Works Compliance Inspection Report Page 13 of 15 DD.40 CFR Part 68 CHEMICAL ACCIDENT PREVENTION AND CLEAN AIR ACT<SECTION 112(r): The S03 process is subject to 112(r)for sulfur trioxide. The TFE process is subject to 112(r)for Tetrafluoroethylene. APPEARS IN COMPLIANCE—The facility submitted the written Risk Management Plan to the U.S. EPA in June 1999. The facility was issued a facility identifier number 1000 0022 9647. In addition, the facility is subject to the OSHA Process Safety Management(PSM)Standard. The latest update of the RMP was submitted by the facility to EPA on 0712412019. The last full 112(r) compliance inspection was conducted by Greg Reeves DAQ on 06121117. The facility appeared to be in compliance during that inspection. The facility has the following processes subject to 112(r): TFE Process 1 TFE(Tetrafluoroethylene) 591400 S03 Process 3 Sulfur Trioxide 61,000 EE.15A NCAC 02D.0541 CONTROL OF EMISSIONS FROM ABRASIVE BLASTING—Abrasive blasting shall take place inside a building unless the item exceeds eight feet in length or is permanently situated at an outside location. Fugitive emissions shall not migrate beyond the property boundaries. APPEARS INCOMPLIANCE—The facility has an abrasive blasting building in which the sand blasting occurs. Outside blasting of tanks and equipment is accomplished using shrouds to contain the blasting materials. FF. 15A NCAC 02D.1806 CONTROL AND PROHIBITION OF ODOROUS EMISSIONS—The facility shall not operate without implementing management practices or installing and operating odor control equipment sufficient to prevent odorous emissions from the facility from causing or contributing to objectionable odors beyond the facility's boundary. APPEARS IN COMPLIANCE—No objectionable odors were detected during the inspection. Ms. Compton stated that no odor complaints have been received by the facility. No odor complaints have been received by FRO regarding this facility. •A Permit Application Submittal Requirement GG. 15A NCAC 02Q.0504 OPTION FOR OBTAINING CONSTRUCTION AND OPERATION PERMIT—The facility is required to submit an amended Title V permit application within 1 year from the date of beginning normal operation of the Thermal Oxidizer(ID No.NCD-Ql),the 4-Stage Caustic Scrubber(ID No.NCD-Q2),the Lime Silo(ID No.NS-RI),or the Lime Slaker(ID No.NS-R2). The facility is also required to submit a notification of startup of this process within 30 days after the beginning of normal operation. APPEARS IN COMPLIANCE—The Startup date for TO and Caustic Scrubber was 12/31/2019. Startup date for Lime Silo and Lime Slaker was 01/06/2020. Startup notification was received at FRO on 0112 712 02 0. The required permit application was submitted on 1111112020. Chemours Company—Fayetteville Works Compliance Inspection Report Page 14 of 15 Facility-Wide HH. 15A NCAC 02Q.0519(a)(7)and CONSENT ORDER(State Enforceable Only)—The permittee shall reduce facility-wide annual emissions(including fugitive,maintenance,malfunction,or accidental emissions)of GenX Compounds'to less than 23.027 pounds per year,which constitutes a 99 percent reduction from the 2017 Total Reported Emissions of 2,302.7 pounds per year. Calculate annual emissions monthly for previous 12 months. Install,operate, and maintain a Thermal Oxidizer and 4-Stage Scrubber System(ID Nos.NCD-Ql and NCD-Q2). Performance testing required. Records of production data and hours of operation;annual GenX Compound emissions; Carbon Adsorbers(ID Nos.ACD-A2,NCD-Q3, NCD-Q4,and SCD-SW 1)inspection and maintenance;process shutdowns;inspections and calibrations of monitoring equipment. Quarterly summary report required of monitoring and recordkeeping activities. APPEARS IN COMPLIANCE—The annual GenX Compound emissions were 14.551 lbs/yr for 2020. The following inspections were conducted for the Carbon Adsorbers(ID Nos.ACD-A2, NCD-Q3): 51712020, 1012212020, and NCD-Q4 is scheduled for maintenance in March 2021. Carbon Adsorber SCD-SWI has not yet been installed. Performance testing is conducted as scheduled including submittal ofrequired test _emission reports. The latest annual report was received at FRO on 0 112 712 02 1 and appeared complete. ➢ Permit Shield for Nonapplicable Requirements II. Temporary Boiler(ID No.PS-TEMP)—This permit condition states that the boiler(ID No.PS- TEMP)has been declared a temporary boiler,as is thus not subject to NESHAP Subpart DDDDD. The facility must keep records documenting that the boiler meets the criteria of a temporary boiler. The facility must also submit a startup notification within 15 days of startup of the boiler. APPEARS IN COMPLIANCE—The boiler has not been brought onsite yet, so no notification or records have been required JJ. GENERAL CONDITION"I"REPORTING REQUIREMENTS FOR EXCESS EMISSIONS AND PERMIT DEVIATIONS—Requires the facility to report incidents of excess emissions or deviations from permit conditions. APPEARS IN COMPLIANCE—Ms. Compton stated that no excess emission events occurred during 2020. There were no deviations from permit conditions occurred during 2020; therefore, no reporting was required KK. GENERAL CONDITION"K"PERMIT RENEWAL—If the permit renewal application is received at least 6 months prior to the expiration of the permit,then the permit shall not expire until the renewal permit has been issued or denied. APPEARS IN COMPLLANCE—The renewal application was received more than 6 months prior to the permit expiration date. This application was received 0910812020 and is currently in process. LL. GENERAL CONDITION"P"COMPLIANCE CERTIFICATION [15A NCAC 2Q.0509(n)]: The facility is required to submit an annual compliance certification to DAQ and EPA by March 1 of each year for the previous calendar year. APPEARS IN COMPLIANCE—The 2019 compliance certification was received at FRO on 0310112020. The 2020 certification is due no later than 0310112021. '"GenX Compounds"means HFPO Dimer Acid,also known as C3 Dimer Acid(CAS No. 13252-13-6);HFPO Dimer Acid Fluoride,also known as C3 Dimer Acid Fluoride(CAS No.2062-98-8);and HFPO Dimer Acid Ammonium Salt,also known as C3 Dimer Acid Ammonium Salt (CAS No.62037-80-3). Chemours Company—Fayetteville Works Compliance Inspection Report Page 15 of 15 MM.GENERAL CONDITION 11X"ANNUAL EMISSION INVENTORY REQUIREMENTS—The facility must submit an annual emission inventory by June 30 of each year. APPEARS IN COMPLIANCE—The 2019 emission inventory was received at FRO on 0613012020 and appeared complete. NN. GENERAL CONDITION"MM"FUGITIVE DUST CONTROL REQUIREMENT—The facility shall not cause or allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. APPEARS IN COMPLIANCE—I did not observe any dust accumulations nor observe any excess visible emissions beyond the property boundary. Ms. Compton stated that no dust complaints have been received by the facility. There have been no dust complaints received at FRO. VII. NON-COMPLIANCE HISTORY SINCE 2010: 04/16/2026 NOV issued for failure to maintain minimum liquid flow rate for the Wet Particulate Scrubber (1D No.NCD-R2): 15A NCAC 02D .0515—Particulates from Miscellaneous Industrial Processes VIH. CONCLUSIONS AND RECOMMENDATIONS: Based on the observations made during the 02/03/2021 inspection,Chemours Company—Fayetteville Works APPEARS IN COMPLIANCE with the requirements outlined in their current air permit,03735T48. M. PINK SHEET ITEMS: Permit Engineer should evaluate removal of 15A NCAC 02D.1109 CASE-BY-CASE MACT during next permit revision. The facility complied with this standard until May 19,2019 and is no longer applicable. The condition was superseded by the requirements of NESHAP Subpart DDDDD beginning as of May 20,2019. /elj