Loading...
HomeMy WebLinkAboutAQ_F_0900009_20221028_CMPL_CompRpt_Gen X The Chemours Company it Chemours Fayetteville Works 22828 NC Highway 87 W Fayetteville,NC 28306 Certified Mail: 7017 1450 0002 3902 4379 And sent via email October 28, 2022 Heather Carter Fayetteville Regional Supervisor Division of Air Quality 225 Green Street, Suite 714 Fayetteville,NC 28301 Re: Continuous Compliance Report Title V Permit No: 03735T48 Facility ID: 0900009 Chemours Company—Fayetteville Works Dear Ms.Carter, This submittal is intended to satisfy Section 2.2 D.1 j of the facility's Title V Air Permit,which requires Chemours to submit quarterly continuous compliance reports. Please find in Table 1 on the following page a summary of the GenX Compounds emissions for the 12- month period ending September 30,2022. The spreadsheet file with the calculations underlying the GenX Compounds emissions presented in Table 1 was prepared by our consultant,ERM NC,Inc. ("ERM"). The spreadsheet file also provides the emissions test data, control device data,and production data underlying the calculations, as well as notes on the calculation methodologies. Because the spreadsheet file contains confidential business information of Chemours,we will send that spreadsheet file under separate cover directly to you, and the spreadsheet file will not be further distributed or posted on Chemours' website. The control device operating parameters for the thermal oxidizer/scrubber system are provided under separate cover in the quarterly Thermal Oxidizer report and control device operating parameters for the carbon beds are provided under separate cover in the quarterly Carbon Bed report. The monitoring data is maintained onsite and available for review upon request. If you have any questions,please contact me at christel.e.comptonkchemours.com. Sincerely, U4,c CA."%, — Christel Compton Environmental Manager Chemours—Fayetteville Works RECEIVED NOV 0 2 2022 � �'Pm DEQ-FAYETTEVILLE RMONAL OFFICE Table 1 Chemours-Fayetteville Works GenX Emissions Summary 12-Month Rolling Emissions (Per Permit Condition 2.2.D.1) Equipment/ Accidental 12-Month Rolling Thermal Oxidize Other Process Monthly Facility- Fugitive Release Sum of Facility-Wide Month Notes Emissions Emissions Wide Emissions Emissions Emissions (lbs) (lbs) (lbs) Emissions (lbs) (lbs) (lbs) October 2021 Actual 0.250 0.006 0.002 0.053 0.311 32.837 November 2021 Actual 0.945 0.090 0.007 0.105 1.147 32.220 December 2021 Actual 0.297 0.000 0.002 0.069 0.368 31.199 January 2022 Actual 0.949 0.070 0.006 0.030 1.055 29.618 February 2022 Actual 1.555 0.103 0.018 0.084 1.760 29.722 March 2022 Actual 1 0.250 0.000 0.002 0.120 0.372 17.456 A ril2022 Actual 0.636 0.560 0.006 0.100 1.302 16.356 May 2022 Actual 3.624 0.003 0.022 0.240 3.889 17.197 June 2022 Actual 1.718 0.238 0.021 0.116 2.094 16.679 July 2022 Actual 0.423 1.110 0.009 0.091 1.633 17.384 August 2022 Actual 1.342 0.000 0.002 0.250 1.594 16.891 September 2022 Actual 0.336 0.057 0.002 0.124 0.519 16.044 Annual Emissions Limitation 23.027 2 US 165838124vl The Chemours Company Chemours' Fayetteville Works 22828 NC Highway 87 W Fayetteville,NC 28306 Certified Mail: 7017 1450 0002 3902 4379 And sent via email October 28, 2022 Heather Carter Fayetteville Regional Supervisor Division of Air Quality 225 Green Street, Suite 714 Fayetteville,NC 28301 Re: Continuous Compliance Report Title V Permit No: 03735T48 Facility ID: 0900009 Chemours Company—Fayetteville Works Dear Ms.Carter, This submittal is intended to satisfy Section 2.2 D.l.j of the facility's Title V Air Permit,which requires Chemours to submit quarterly continuous compliance reports. Please find in Table 1 on the following page a summary of the GenX Compounds emissions for the 12- month period ending September 30, 2022. The spreadsheet file with the calculations underlying the GenX Compounds emissions presented in Table 1 was prepared by our consultant,ERM NC, Inc. ("ERM"). The spreadsheet file also provides the emissions test data, control device data, and production data underlying the calculations, as well as notes on the calculation methodologies. Because the spreadsheet file contains confidential business information of Chemours,we will send that spreadsheet file under separate cover directly to you, and the spreadsheet file will not be further distributed or posted on Chemours' website. The control device operating parameters for the thermal oxidizer/scrubber system are provided under separate cover in the quarterly Thermal Oxidizer report and control device operating parameters for the carbon beds are provided under separate cover in the quarterly Carbon Bed report. The monitoring data is maintained onsite and available for review upon request. If you have any questions, please contact me at christe Le.corn pton cr,chemours.com. Sincerely, L,GL4X co-"., Christel Compton Environmental Manager Chemours—Fayetteville Works Table 1 Chemours-Fayetteville Works GenX Emissions Summary 12-Month Rolling Emissions (Per Permit Condition 2.2.D.1) Equipment/ Accidental 12-Month Rolling Thermal Oxidize OtherProcess Monthly Facility- Fugitive Release Sum of Facility-Wide Month Notes Emissions Emissions Wide Emissions Emissions Emissions (lbs) Ohs) Ohs) Emissions Ohs) Ohs) Ohs) October 2021 Actual 0.250 0.006 0.002 0.053 0.311 32.837 November 2021 Actual 0.945 0.090 0.007 0.105 1.147 32.220 December 2021 Actual 0.297 0.000 0.002 0.069 0.368 31.199 January 2022 Actual 0.949 0.070 0.006 0.030 1.055 29.618 February 2022 Actual 1.555 0.103 0.018 0.084 1.760 29.722 March 2022 Actual 0.250 0.000 0.002 0.120 0.372 17.456 Apd 2022 Actual 1 0.636 0.560 0.006 0.100 1.302 16.356 May 2022 Actual 1 3.624 0.003 0.022 0.240 3.889 17.197 June 2022 Actual 1.718 0.238 0.021 0.116 2.094 16.679 July 2022 Actual 0.423 1.110 0.009 0.091 1.633 17.384 August 2022 Actual 1.342 0.000 0.002 0.250 1.594 16.891 September 2022 Actual 0.336 0.057 1 0.002 1 0.124 1 0.519 16.044 Annual Emissions Limitation 23.027 2 US 165838124vl