Loading...
HomeMy WebLinkAboutAQ_F_0900009_20220801_CMPL_CompRpt (4) t zz Chemours- RECEIVED AUG 01 2022 DEQ-FAYETTEVILLE RE&ONAL OFFICE CERTIFIED MAIL ARTICLE NUMBER 7017 1450 0002 3902 4324 RETURN RECEIPT REQUESTED July 27, 2022 Ms. Heather Carter NCDEQ—Division of Air Quality 225 Green Street Suite 714 Fayetteville,NC 28301-5043 SUBJECT: Miscellaneous Organic Chemical Manufacturing NESHAP (MON) Compliance Report — Jan 1, 2022 through June 30, 2022 Title V Permit Number 03735T48 Facility ID: 0900009 Dear Ms. Carter: Attached is the Chemours Company — Fayetteville Works' Compliance Report for the Miscellaneous Organic Chemical Manufacturing NESHAP (40 CFR Part 63 Subpart FFFF) for the reporting period from Jan 1, 2022 through June 30, 2022. Enclosed is the required photocopy of this report. If you should have any questions,please call me at 910-678-1213. Sincerely, U-4Lka44--� Christel Compton Program Manager Attachment/Enclosure cc: U.S. EPA Region 4,Air and EPCRA Enforcement Section, Atlanta, GA Chemours Company—Fayetteville Works Semiannual Report— 1 st Half 2022 Air Permit No. 03735T48 Page 12 ATTACHMENT C Miscellaneous Organic Chemical Manufacturing NESHAP (MON) 40 CFR Part 63 Subpart FFFF Title V Air Permit Section 2.1(B)(10) Semi-Annual Compliance Report Periodic Monitoring Summary Report Parameters Report:R807 } MON-UU Report Date: 7/14/2022 2:00:35PM Report from: 2022-1-1 00 To 2022-6-30 2 Compliance Group: HFPO Percent Late Non Leaking Inspected Leaking Repairs Repairable VALVES JANUARY 0 1 0.00 0 0 FEBRUARY 0 172 0.00 0 0 MAY 0 172 0.00 0 0 Chemours Company—Fayetteville Works Semiannual Report— 1 st Half 2022 Air Permit No. 03735T48 Page 13 ATTACHMENT C Miscellaneous Organic Chemical Manufacturing NESHAP (MON) 40 CFR Part 63 Subpart FFFF Title V Air Permit Section 2.1(B)(10) Semi-Annual Compliance Report Periodic Monitoring Summary Report Parameters Report:R807 -..�1��� MON-UU Report Date: 7/14/2022 2:00:36PM Report from: 2022-1-1 00 To 2022-6-302 Compliance Group: POLYMERS ,Percent Late NZL Leakin2 Inspected Leakiniz Repairs Repairable VALVES FEBRUARY 0 63 0.00 0 0 MAY 0 63 0.00 0 0 I Chemours Company—Fayetteville Works Semiannual Report— 1 st Half 2022 Air Permit No. 03735T48 Page 14 ATTACHMENT C Miscellaneous Organic Chemical Manufacturing NESHAP (MON) 40 CFR Part 63 Subpart FFFF Title V Air Permit Section 2.1(B)(10) Semi-Annual Compliance Report Periodic Monitoring Summary Report Parameters Report:R807 + MON-UU AD Report Date: 7/14/2022 2:00:36PM Report from: 2022-1-1 00 To 2022-6-30 2 Compliance Group: VE NORTH Percent Late Non Leaking Inspected Leaking Repairs Repairable VALVES FEBRUARY 0 219 0.00 0 0 MAY 0 219 0.00 0 0 AGITATORS JANUARY 0 1 0.00 0 0 FEBRUARY 0 1 0.00 0 0 MARCH 0 1 0.00 0 0 APRIL 0 1 0.00 0 0 MAY 0 1 0.00 0 0 JUNE 0 1 0.00 0 0 Chemours Company—Fayetteville Works Semiannual Report— 1 st Half 2022 Air Permit No. 03735T48 Page 15 ATTACHMENT C Miscellaneous Organic Chemical Manufacturing NESHAP (MON) 40 CFR Part 63 Subpart FFFF Title V Air Permit Section 2.1(B)(10) Semi-Annual Compliance Report Periodic Monitoring Summary Report Parameters Report:R807 MON-UU Report Date: 7/14/2022 2:00:36PM Report from: 2022-1-1 00 To 2022-6-30 2 Compliance Group: VE SOUTH Percent Late NQIL Leaking Inspected Leaking Repairs Repairable VALVES FEBRUARY 0 216 0.00 0 0 MAY 0 219 0.00 0 0 CONNECTORS MAY 0 6 0.00 0 0