HomeMy WebLinkAboutAQ_F_0900009_20210224_CMPL_CompRpt REVIEW OF TITLE V 2020 ANNUAL COMPLIANCE CERTIFICATION Reviewer Assigned: Evangelyn Lowery-Jacc FACILITY Chemours Company-Fayetteville Works FACILITY 0900009 NAME: ID: 1. Is the Certification sheet signed by the authorized/responsible official? Y 7 N ❑ 2. Print the"Summary of Violations for a Facility"report from IBEAM and attach. 3. Are all NOD/NOV/NREs accounted for in the Deviation Summary Report? Y F,/] N ❑ N/A 4. If deviations are noted, did FRO address them all?(i.e. send letter)?Check paper file for any issues that may not be recorded in IBEAM Violations. Y k/1 N❑ N/A❑ 5. Discuss deviations details with Compliance Coordinator. Y❑ N/AF,/] 6. If there was more than one permit applicable during the year, have all the permits been addressed in this ACC? Permit Numbers 03735T47 ; 03735T48 Y FV] N❑ N/A❑ 7. Do reported sources and conditions match those in the permit(s)? Y 7 N❑ 8. Is the Compliance Summary Report for Specific Conditions complete and accurate? Y WI N❑ 9. Is the Compliance Summary Report for General Conditions complete and accurate? Y W] N ❑ 10. Is compliance with the ACC requirements indicated? Y Fv—(] N ❑ 11. Record in IBEAM Actions/Reporting(date received,date reviewed, compliance status,comments). Completed on 03/25/2021 (date) REMEMBER—Compliance determination here refers to the ACC submitting requirements(late,not submitted, incomplete, etc). Talk to the Compliance Coordinator before you code a facility in violation. 12. Initial and date the top of the ACC Certification Sheet(not this cover sheet). F-1 13. File FRO copy in a"Reports"or an"ACC"folder in facility file after Compliance Coordinator review. 14. Comments: Reviewed by: ELJ Date: 0312512021 (initials) Coordinator Review: JD Date 0312512021 (initials) 03/25/2021 Page 1 of 1 Summary of Violations Violator: Chemours Company - Fayetteville Works Facility ID: 0900009 Letter Date(s): 04/17/2020 Violation(s): 2D .0515 Particulates from Miscellaneous Industrial Processes County: Bladen Letter Type: NOV Case#: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 10/27/2009 Violation(s): County: Bladen Letter Type: FYI/Facilities Case#: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 01/06/2009 Violation(s): NCGS 143-215.108 Control of sources of air pollution; permits required. County: Bladen Letter Type: NOV/NRE Case#: 2009-049 Date Assessed: 04/30/2009 Amount Assessed: $3,285.00 Case Closed: 05/14/2009 Total Amount Paid: $3,285.00 Letter Date(s): 11/30/2007 Violation(s): Permit Condition(s) Part II, Section 2; submit complete app within months County: Bladen Letter Type: NOV Case#: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 Letter Date(s): 08/13/2007 Violation(s): County: Bladen Letter Type: FYI/Facilities Case#: Date Assessed: Amount Assessed: Case Closed: Total Amount Paid: $0.00 The Chemours Company Chemours Fayetteville Works 22828 NC Highway 87 W Fayetteville,NC 28306 RECEIVED Certified Mail: 7017 1450 0002 3902 3341 FEB 2 4 2021 February 22, 2021 DEO-FAYETTEVILLE REGIONAL OFFICE Ms. Heather Carter U.S. EPA Region 4 NCDEQ Division of Air Quality Air and EPCRA Enforcement Section 225 Green Street 61 Forsyth Street S.W. Suite 714 Atlanta, GA 30303 Fayetteville, NC 28301-5043 SUBJECT: 2020 Title V Air Permit—Annual Compliance Certification Chemours Company—Fayetteville Works Title V Permit Number 03537T47 and 48 Facility ID: 0900009 Dear Ms. Carter: Attached is the Chemours Company—Fayetteville Works' Title V Air Permit Annual Compliance Certification report for calendar year 2020. The required photocopy of this report is enclosed in the NCDEQ Division of Air Quality mailing. If you should have any questions, please call me at 910-678-1213. Sincerely, Christel Compton Program Manager Attachment/Enclosure cc: U.S. EPA Region 4, Air and EPCRA Enforcement Section, Atlanta, GA North Carolina Department of Environmental Quality Division of Air Quality (DAQ) Title V Annual Compliance Certification Forms Facility Name: Chemours Company—Fayetteville Works Facility Address: 22828 NC Highway87 W,Fayetteville,NC 28306-7332 Facility Location: 22828 NC Highway 87 W, Bladen County,NC 28306 Facility ID Number: 0900009 Title V Permit Number: 03735T47-48 Start of Reporting Period: January 1,2020 End of Reporting Period: December 31,2020 Compliance Statement (Check only one of the following options) During the reporting period specified above,this facility was in compliance with all terms and conditions identified in the above referenced Title V Operating Permit. As such, there were no deviations, excess emissions events, or other reportable incidents including those attributable to equipment malfunctions, breakdown,or upset conditions(please fill out the Compliance Summary Report). x During the reporting period specified above, this facility was in compliance with ALL terms and conditions identified in the above referenced Title V Operating Permit, EXCEPT for the deviations identified in the Deviation Summary Report(please fill out both the Compliance Summary Report and Deviation Summary Report). Does the above compliance statement differ from what is indicated on your most recent Title V Report(i.e. last Semi-Annual Monitoring Report,Annual Emissions Inventory,etc)? Yes ❑ No 0 Are you submitting this Annual Compliance Certification form to also fulfill a Title V Semi-Annual Monitoring reporting requirement? If so,this certification must be submitted by January 30. Yes ❑ No 0 Certification By Responsible Official Based on information and belief formed after reasonable inquiry,the undersigned certifies under penalty of law(federal rule 40 CFR 70.5(d))that all information and statements provided in this form (including any attachments)are true,accurate, and complete. February 22, 2021 (Signatur fResponsible Official) (Date) Name: Dawn M Hughes (Type or Print) Number of Attached Pages(not including Instructions Page) 86 Revision 3.0 North Carolina Department of Environmental Quality Division of Air Quality DEVIATION SUMMARY REPORT For Calendar Year 2020 Page_1_of_1 Source or Control Emission Source Deviation Device ID Pollutant Deviation Description Deviation Duration Suspected Cause of Deviation Corrective Action Taken Description Number(s) Date(s) An internal audit of permit conditions identified the deviation. DAQ was immediately notified. The scrubber Approval for operating under the revised The lime slaker scrubber operated below the minimum 12/31/19- flow rate provided in the permit scrubber flow rate was provided by DAQ on Lime Slaker NS-R2 PM flow rate specified in the Air Permit. 4/22/20 114 days application was for a different vendor 4/23/2020 and was included in Permit then was selected. The flow rate which 03735T48. Chemours was operating at during this time was in adherence with the actual vendor recommendations. Revision 3.0 Permit 03735T47-48 Pagel of 3 COMPLIANCE SUMMARY REPORT FOR GENERAL CONDITIONS For Calendar Year 2020 Terms and Conditions Was Deviation Method(s)of Deviations? Records a non- Determining Permit (Yes/No) Maintained? compliance Compliance Comments Condition Condition Summary (Yes/No/NA) issue. Number Yes/No) Status 3.A General Provisions No Yes NA Records review 3.B Permit available at facility No Yes NA Records review 3.D Submissions of reports to regional office No Yes NA Records review 3.G Permit modifications and applications No Yes NA Records review 3.H Changes not requiring permit modifications No Yes NA Records review 3.I.A, Reporting requirements for excess emissions and permit Notification to Regional 3.I.B deviations No Yes NA Records review Supervisor made per requirement. Permit renewal application 3.K Permit renewal every five years No Yes NA NA submitted before September 2020. Operations and meteorological data provided 3.M Duty to Provide Information(submittal of information) No Yes NA Records review to DAQ every two weeks during 2020. Rain sample data also submitted in 2020. Supplemental information 3.N Duty to supplement No NA NA NA submitted for Lime Slaker wet particulate scrubber in 2020. 3.0 Retention of records No Yes NA Records review 3.P Compliance certification No Yes NA Records review 3.Q Certification by responsible official No Yes NA Records review Permit 03735T47-48 Page 2 of 3 COMPLIANCE SUMMARY REPORT FOR GENERAL CONDITIONS For Calendar Year 2020 Terms and Conditions Was Deviation Method(s)of Deviations? Records a non- Determining Permit (Yes/No) Maintained? compliance Compliance Comments Condition Condition Summary (Yes/No/NA) issue. Number Yes/No) Status 3.T Insignificant activities records available at facility No Yes NA Records review g tY 3.V Inspection and entry No Yes NA DAQ annual inspection 3.W Annual fee payment No Yes NA Records review 3.X Annual emission inventory requirement No Yes NA Records review 3.Y Confidential information No NA NA NA EPA did not request confidential information. 32 Construction and operation permits No Yes NA Records review 3.AA Standard application form and required information No Yes NA Records review 3.CC Refrigerant requirements No Yes NA Records review 3.DD Prevention of accidental releases—Section 112(r) No Yes NA Records review 3.EE Prevention of accidental releases—Section 112(r)(1) No NA NA NA Facility has submitted a 112(r)RMP as required. 3.I1 Ambient air quality standards No Yes NA Gaussian Dispersion Model Emissions testing of VEN, VES and PPA carbon 3.JJ Emission testing and reporting requirements No Yes NA Records review adsorbers conducted in 2020. Testing of the Thermal Oxidizer conducted Feb 2020. 3.LL Reporting requirements for non-operating equipment No Yes NA Records review Permit 03735T47-48 Page 3 of 3 COMPLIANCE SUMMARY REPORT FOR GENERAL CONDITIONS For Calendar Year 2020 Terms and Conditions Was Deviation Method(s)of Deviations? Records a non- Determining Permit (Yes/No) Maintained? compliance Compliance Comments Condition Condition Summary (Yes/No/NA) issue. Number Yes/No) Status INN Specific permit modifications No Yes NA Records review Permittee has no influence 3.00 Third Party Participation and EPA Review No NA NA NA with the EPA review or any 3rd p participation. Air Quality Permit No.03735T47 and 48 Page 1 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) Particulates from Fuel Burning Indirect Heat Exchangers Emissions of particulate matter from Natural gas/ PS-A and 2.1(A)(1)(a) the combustion of fuel oil that are AP-42 emission No.2 fuel oil- PS-B discharged from the affected boilers No NA NA factors. fired boiler 03735T47-48 (ID Nos.PS-A and PS-B)into the atmosphere shall not exceed 0.2667 pounds per million Btu heat input. 15A NCAC 02D.0503 Emissions of particulate matter from the combustion of natural gas and No. Not applicable Natural gas/ 2.1(A)(1)(b) 2 fuel oil that are discharged from the as Boiler PS-C No.2 fuel oil- PS-C affected boiler(ID No.PS-C)into the NA NA NA has not been fired boiler 03735T47-48 atmosphere shall not exceed 0.2268 constructed. pounds per million Btu heat input. 15A NCAC 02D.0503 2.1 A 1 c If emissions testing is required,the Emissions Natural gas/ PS-A, ( )( )( ) testing was not Boiler PS-C has No.2 fuel oil- PS-B, No NA NA required for not been fired boiler and PS-C 03735T47-48 accordance General Condition JJ. these sources in constructed. [15A NCAC 02Q.0508(f)] 2020. No 2.1 A 1 d monitoring/recordkeeping/reporting is Onlynatural as Boiler PS-C has Natural gas/ PS-A, ( )( )( ) required for particulate emissions from g No.2 fuel oil- PS-B, the firing of natural gas or No.2 fuel No NA NA was burned in not been fired boiler and PS-C 03735T47-48 2020. constructed. oil in these boilers. 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 2 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments it Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Sulfur Dioxide Emissions from Combustion Sources 0.5%Sulfur No. Emissions of sulfur dioxide from the 2 fuel oil affected boilers(ID Nos.PS-A and PS- equates to Natural gas/ PS-A, 2.1(A)(2)(a) Boiler PS-C has B)when firing natural gas or No.2 No Yes NA 0.5 lb.SO2 per not been No.2 fuel oil- PS-B, fuel oil,and from the affected boiler million BTU. fired boiler and PS-C 03735T47-48 (ID No.PS-C)when firing natural gas No.2 fuel oil constructed. only,shall not exceed 2.3 pounds per was not burned million Btu heat input. in 2020. 15A NCAC 02D.0516 If emissions testing is required,the Emissions Natural gas/ PS-A, 2.1(A)(2)(b) testing shall be performed in testing was not Boiler PS-C has No.2 fuel oil- PS-B, accordance with General Condition JJ. No NA NA required for not been fired boiler and PS-C 03735T47-48 [15A NCAC 02D.0508(f)] these sources in constructed. 2020. No monitoring/recordkeeping is Natural gas/ PS-A, 2.1(A)(2)(c) required for sulfur dioxide emissions Only natural gas Boiler PS-C has No.2 fuel oil- PS-B, from natural gas or fuel oil burned in No NA NA was burned in not been fired boiler and PS-C 03735T47-48 these boilers. 2020. constructed. 15A NCAC 02 .0508 Control of Visible Emissions Visible emissions from the affected boiler(ID No.PS-A)shall not be more than 40 percent opacity when averaged over a six-minute period.However, No VE Natural gas/ 2.1(A)(3)(a)No.2 fuel oil- PS-A six-minute averaging periods may No NA NA deviations fired boiler 03735T47-48 exceed 40 percent not more than once observed in in any hour and not more than four 2020. times in any 24-hour period. In no event shall the six-minute average exceed 90 percent opacity. 15A NCAC 02D.0521 Air Quality Permit No.03735T47 and 48 Page 3 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Visible emissions from the affected boiler(ID No.PS-B)shall not be more than 20 percent opacity when averaged over a six-minute period.However, Natural gas/ 2.1(A)(3)(b) six-minute averaging periods may No VE deviations No.2 fuel oil- PS-B exceed 20 percent not more than once No NA NA observed in fired boiler 03735T47-48 in any hour and not more than four 2020. times in any 24-hour period. In no event shall the six-minute average exceed 87 percent opacity. 15A NCAC 02D.0521 Visible emissions from the affected boiler(ID No.PS-C)shall not be more than 20 percent opacity when averaged over a six-minute period when natural 2.1(A)(3)(c) gas is fired in the boiler.However,six- Not required Natural gas- since Boiler PS- fired boiler PS-C minute averaging periods may exceed NA NA NA C has not been 03735T47-48 20 percent not more than once in any constructed. hour and not more than four times in any 24-hour period. In no event shall the six-minute average exceed 87 percent opacity. Natural as/ PS-A, If emissions testing is required,the Emissions g 2.1(A)(3)(d) testing shall be performed in testing was not Boiler PS-C has No.2 fuel oil- PS-B, accordance with General Condition JJ. No NA NA required for not been fired boiler and PS-C 03735T47-48 [15A NCAC 02Q.0508(f)] these sources in constructed. 2020. No monitoring/recordkeeping Natural gas/ PS-A, 2.1(A)(3)(e) /reporting is required for visible Only natural gas Boiler PS-C has No.2 fuel oil- PS-B, emissions from the firing of natural gas No NA NA was burned in not been fired boiler and PS-C 03735T47-48 or fuel oil in these sources. 2020. constructed. 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 4 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) New Source Performance Standards (40 CFR 60,Subpart Dc) For the affected boiler,while firing No.2 fuel oil only,the Permittee shall comply with all applicable provisions, including the notification,testing, Not required Natural gas/ 2.1(A)(4)(a) recordkeeping,and monitoring since Boiler PS- No.2 fuel oil- PS-C requirements contained in NA NA NA C has not been fired boiler 03735T47-48 Environmental Management constructed. Commission Standard 15A NCAC 0213.0524,"New Source Performance Standards"(NSPS)as promulgated in 40 CFR 60,Subpart Dc,including Subpart A,"General Provisions." 15A NCAC 02D.0524 The maximum sulfur content of any Natural gas/ 2.1(A)(4)(b) fuel oil received and fired in the Not required affected boiler shall not exceed 0.5 since Boiler PS- No.2fuel oil- PS-C percent by weight. NA NA NA Chas not been PS- fired boiler 03735T47-48 [15A NCAC 02D.0524 and 40 CFR constructed. 60.42c d Visible emissions from the affected boiler(ID No.PS-C)shall not be more Natural gas/ 2.1(A)(4)(c) than 20 percent opacity when averaged Not required over a six-minute period,except for since Boiler PS- No.2fuel oil- PS-C one six-minute period per hour of not NA NA NA Chas not been PS- fired boiler 03735T47-48 more than 27 percent opacity. constructed [15A NCAC 02D.0524 and 40 CFR 60.43 c c The opacity standards in Section 2.1 Natural gas/ 2.1(A)(4)(d) A.4.c,above,applies at all times when Not required firing No.2 fuel oil,except during since Boiler PS- No.2fuel oil- PS-C periods of startup,shutdown or NA NA NA Chas not been PS- fired boiler 03735T47-48 malfunction. constructed. 40 CFR 60.43 c d Air Quality Permit No.03735T47 and 48 Page 5 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) No fuel sulfur limits or opacity limits Natural gas/ 2.1(A)(4)(e) apply under 15A NCAC 02D.0524 Not required since Boiler PS- No.2 fuel oil- PS-C when firing natural gas in the affected NA NA NA fired boiler 03735T47-48 boiler(ID No.PS-C). C has not been constructed. 15A NCAC 02D.0524 If emissions testing is required,the testing shall be performed in Not required Natural gas/ 2.1(A)(4)(f) accordance with General Condition JJ. since Boiler PS- No.2 fuel oil- PS-C If the results of this test are above the NA NA NA C has not been fired boiler 03735T47-48 limits given in Section 2.1 A.4.b or constructed. A.4.c,above. 15A NCAC 02 .0508 The Permittee shall conduct an initial performance test using Method 9 of Appendix A-4 of 40 CFR Part 60 and Natural gas/ 2.1(A)(4)(g) in accordance with General Condition Not required JJ to demonstrate compliance with the since Boiler PS- No.2fuel oil- PS-C opacity limit in Section 2.1 A.4.c, NA NA NA Chas not been PS- fired boiler 03735T47-48 above,and as specified in constructed. 2.1(A)(4)(g)(i)through 2.1(A)(4)(g)(iii). 40 CFR 60.47c a To assure compliance with the fuel sulfur limit in Section 2.1 A.4.b, above,the Permittee shall retain a copy of the fuel supplier certification for any Not required Natural gas/ 2.1(A)(4)(h) fuel oil fired at the affected boiler. The since Boiler PS- No.2 fuel oil- PS-C fuel supplier certification shall include NA NA NA C has not been fired boiler 03735T47-48 the information specified in constructed. 2.1(A)(4)(h)(i)through 2.1(A)(4)(h)(iii). [40 CFR 60.46c(e),40 CFR 60.48c(f) and 15A NCAC 02 .0508 'f I Air Quality uali Permit No.03735T47 and 48 Page 6 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) After completion of the initial performance testing in Section 2.1 A.4.g,above,the Permittee shall Not required Natural gas/ 2.1(A)(4)(i) comply with visible emissions since Boiler PS- No.2 fuel oil- PS-C monitoring according to the NA NA NA C has not been fired boiler 03735T47-48 requirements specified in constructed. 2.1(A)(4)(i)(i)through 2.1(A)(4)(i)(ii). [40 CFR 60.47c(a)(1)and 40 CFR 60.47c a 2 The Permittee shall record and Not required Natural gas/ 2.1(A)(4)0) maintain records of the amounts of since Boiler PS- No.2 fuel oil- PS-C each fuel fired during each month. NA NA NA C has not been fired boiler 03735T47-48 [15A NCAC 02Q.0508(f)and 40 CFR constructed. 60.48c 2 The Permittee shall maintain records Not required Natural gas/ 2.1(A)(4)(k) of No.2 fuel oil supplier certifications since Boiler PS- No.2 fuel oil- PS-C as specified in Section 2.1 A.4.h.i, NA NA NA C has not been fired boiler 03735T47-48 above. 40 CFR 60.48c a 11 1 constructed. Natural gas/ 2.1(A)(4)(1) The Permittee shall keep the opacity Not required No.2fuel oil- PS-C monitoring records specified in NA NA NA since Boiler PS- fired boiler 03735T47-48 2.I(A)(4)(1)(i)through 2.1(A)(4)(1)(ii). C has not been 40 CFR 60.48c c 1 , 2 constructed. The Permittee shall maintain records Natural gas/ 2.1(A)(4)(m) of any occurrence and duration of any Not required No.2 fuel oil- PS-C startup,shutdown,or malfunction in NA NA NA since Boiler PS- fired boiler 03735T47-48 the operation the affected boiler(ID C has not been No.PS-C). constructed. 40 CFR 60.7 b Natural gas/ 2.1(A)(4)(n) No.2 fuel oil- PS-C Paragraph(n)missing from permit NA NA NA NA fired boiler 03735T47-48 1 Air Quality Permit No.03735T47 and 48 Page 7 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Description Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Summary � No. s Number NA Issue. Status (Yes/No) All records required under Section 2.1 Natural gas/ 2.1(A)(4)(0) AA j through A.4.m shall be Not required maintained by the Permittee for a since Boiler PS- No.2 fuel oil- PS-C NA NA NA fired boiler 03735T47-48 Period of two years following the date Chas not been of such record. constructed. 40 CFR 60.48c i The Permittee shall submit a Natural gas/ 2.1(A)(4)(p) construction notification of the date Not required construction of the affected boiler(ID since Boiler PS- No.2fuel oil- PS-C No.PS-C)is commenced,postmarked NA NA NA C has not been PS- fired boiler 03735T47-48 no later than 30 days after such date. constructed. 40 CFR 60.7 a 1 The Permittee shall submit an initial notification to the Regional Supervisor Natural gas/ 2.1(A)(4)(q) within 15 days of actual startup of the Not required affected boiler(ID No.PS-C). The since Boiler PS- No.2fuel oil- PS-C notification shall include the NA NA NA Chas not been PS- fired boiler 03735T47-48 informations specified in 2.1 A 4 i constructed. P ( )( )(q)(�) through 2.1(A)(4)(q)(ii). 40 CFR 60.48c a,40 CFR 60.7(a)(3)] The Permittee shall submit a semiannual summary report postmarked on or before January 30 of each calendar year for the preceding six-month period between July and December and July 30 of each calendar Natural gas/ 2.1(A)(4)(r) year for the preceding six-month Not required since Boiler No.2 fuel oil- PS-C period between January and June.All NA NA NA fired boiler 03735T47-48 instances of noncompliance from the C has not been requirements of this permit and excess constructed. emissions must be clearly identified. The summary report shall include information in 2.1(A)(4)(r)(i)through 2.1(A)(4)(r)(iii). 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 8 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was � Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Prevention of Significant Deterioration In order to avoid applicability of 15A NCAC 02D.0530(g)for major sources Monthly PSD Natural gas/ 2.1(A)(5)(a) and major modifications,the affected avoidance No.2 fuel oil- PS-B boiler shall discharge into the No Yes NA reports fired boiler 03735T47-48 atmosphere less than 40 tons of maintained. Nitrogen Oxide per consecutive 12- month period. 15A NCAC 02 .0317 In order to avoid applicability of 15A NCAC 02D.0530(g)for major sources Natural gas/ 2.1(A)(5)(a) and major modifications,the affected Monthly PSD No.2 fuel oil- PS-B No Yes NA boiler shall discharge into the avoidance fired boiler 03735T47-48 atmosphere less than 40 tons of Sulfur reports Dioxide per consecutive 12-month maintained. period. 15A NCAC 02 .0317 Natural gas/ 2.1(A)(5)(b) If emissions testing is required,the Emissions No.2 fuel oil- PS-B Permittee shall perform such testing in No NA NA testing was not fired boiler 03735T47-48 accordance with General Condition JJ. required for this 15A NCAC 02 .0508 source in 2020. The Permittee shall keep monthly Natural gas/ 2.1(A)(5)(c) records of fuel usage in a logbook Fuel No.2 fuel oil- PS-B No Yes NA (written or in electronic format),as consumption fired boiler 03735T47-48 specified in 2.1(A)(5)(c)(i)through and sulfur 2.1(A)(5)(c)(iii). content records. 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 9 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall calculate monthly and 12-month rolling NOx emissions from the affected boiler within 30 days Natural gas/ 2.1(A)(5)(d) after the end of each calendar month. Monthly PSD No.2 fuel oil- PS-B Calculations shall be recorded in a No Yes NA avoidance fired boiler 03735T47-48 logbook(written or electronic format), reports according to formula specified in maintained. 2.1(A)(5)(d)(i)through 2.1(A)(5)(d)(ii). 15A NCAC 0213.0530 The Permittee shall calculate monthly and 12-month rolling SOa emissions from the affected boiler within 30 days Natural gas/ 2.1(A)(5)(e) after the end of each calendar month. Monthly PSD No.2 fuel oil- PS-B Calculations shall be recorded in a No Yes NA avoidance fired boiler 03735T47-48 logbook(written or electronic format), reports according to formula specified in maintained. 2.1(A)(5)(e)(i)through 2.1(A)(5)(e)(ii). 15A NCAC 02D.0530 The Permittee shall submit a semi- annual summary report of monitoring and recordkeeping activities postmarked on or before January 30 of each calendar year for the preceding Semi-annual Natural gas/ 2.1(A)(5)(f) six-month period between July and reports sent to No.2 fuel oil- PS-B December,and July 30 of each No Yes NA the NC Division fired boiler 03735T47-48 calendar year for the preceding six- of Air Quality month period between January and FRO. June. The report shall contain the information specified in 2.1(A)(5)(f)(i) through 2.1(A)(5)(f)(iii). 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 10 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Case-by-Case`Boiler"MACT The initial compliance date for the emission limitations and associated monitoring,recordkeeping,and Starting May reporting requirements listed below is 20,2019,PS-A, December 12,2013. These conditions PS-B and PS-C permit incorrectly need not be included on the annual started identified Boiler Natural gas/ 2.1(A)(6) compliance certification until after the complying with No.2 fuel oil- PS-`� initial compliance date. These limits NA NA NA section PS-B as applicable fired boiler PS-B 03735T47-48 apply except for periods of startup, 2.1(A)(7). to 2.1 ( but PS-C shutdown,and malfunction.The Condition shoulldd b be 2.1(A)(7). Permittee shall follow the procedures 2.1(A)(6)is no in 15A NCAC 02D.0535 for any longer excess emissions that occur during applicable. periods of startup,shutdown,or malfunction. 15A NCAC 02D.1109 40 CFR 63,Subpart DDDDD—Boiler MACT For the boilers(ID Nos.PS-A,PS-B and PS-C),the Permittee shall comply with all applicable provisions for the "unit designed to burn gas 1 This condition Natural gas/ PS-A 2.1(A)(7)(a) subcategory,"including the Boiler PS-C has No.2 fuel oil- PS-B monitoring,recordkeeping,and No Yes NA became not been fired boiler PS-C 03735T47-48 reporting contained in 15A NCAC effective constructed. 02D.I I I I "Maximum Achievable May 20,2019. Control Technology"(MACT)as promulgated in 40 CFR 63,Subpart DDDDD. [40 CFR 63.7485,63.7490(d), 63.7499 1 Air Quality Permit No.03 73 5T47 and 48 Page 11 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description Summary p No.(s) Number NA) Issue? Status (Yes/No) In order for the boilers(ID Nos.PS-A, PS-B and PS-C)to be considered in the"unit designed to burn gas 1 subcategory,"the Permittee shall only This condition burn liquid fuel for periodic testing of became Natural gas/ PS-A 2.1(A)(7)(b) effective on Boiler PS-C has No.2 fuel oil- PS-B liquid fuel,maintenance,or operator No Yes NA May 20,2019. not been fired boiler PS-C 03735T47-48 training,not to exceed a combined Liquid fuel was constructed. total of 48 hours during any calendar year,and during periods of gas not burned in curtailment or gas supply interruptions 2020. of any duration. 40 CFR 63.7575 For the purpose of Section 2.1 TA,the Natural gas/ PS-A 2.1(A)(7)(c) definitions and nomenclature Boiler PS-C has No.2 fuel oil- PS-B contained in 40 CFR 63.7575 shall NA NA NA NA not been fired boiler PS-C 03735T47-48 apply. constructed. 40 CFR 63.7575 The Permittee shall comply with the requirements of 40 CFR 63 Subpart A, This condition Natural gas/ PS-A 2.1(A)(7)(d) General Provisions,according to the Boiler PS-C has No.2 fuel oil- PS-B applicability of Subpart A to such No Yes NA became not been fired boiler PS-C 03735T47-48 sources as identified in Table 10 to 40 effective constructed. CFR Part 63,Subpart DDDDD. May 20,2019. 40 CFR 63.7565 Air Quality Permit No.03 73 5T47 and 48 Page 12 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall comply with the CAA§1120)standards in Section 2.1 A.6 through May 19,2019. 2.1(A)(7)(e) i. On and after May 20,2019,the Permittee shall comply with the paragraphs requirements of Section 2.1 A. and(ii)became 7 Natural gas/ PS-A 2.1(A)(7)(e) effective on Boiler PS-C has for the boiler(ID No.PS-A and No.2 fuel oil- PS-B PS-B) No Yes NA May 20,2019. not been fired boiler PS-C 03735T47-48 ii. The Permittee shall comply with Compliance constructed. the requirements of this section with each condition is for boiler(ID No.PS-C)on May specified below. 20,2019 or upon startup, whichever is later. 40 CFR 63.7495 a and b 63.56 b As specified in 40 CFR 63.9(b)(4)and (5),if the initial startup of the boiler This condition (ID No.PS-C)is after May 20,2019, became effective on Natural gas/ 2.1(A)(7)(f) the Permittee shall submit an Initial 1 May Boiler PS-C has No.2 fuel oil- PS-C Notification not later than 15 days NA NA NA NA as as boiler o not been fired boiler 03735T47-48 after the actual date of startup of the boiler constructed. boiler. PS-C has not [40 CFR 63.7545(c),40 CFR been 63.9(b)(4)and 5 constructed. Air Quality Permit No.03735T47 and 48 Page 13 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall submit a Notification of Compliance Status for the boilers(ID Nos.PS-A,PS-B and This condition PS-C). The notification must be signed by a responsible official and became postmarked before the close of effective on Natural gas/ PS-A 2.1(A)(7)(g) May 20,2019 Boiler PS-C has business within 60 days of the No.2 fuel oil- PS-B compliance date specified in Section No Yes NA and the not been fired boiler PS-C 03735T47-48 2.1 A.7.e,above.The notification Notification of constructed. Compliance was shall contain the information specified in 2.1(A)(7)(g)(i)through submitted July 18,2019. 2.1(A)(7)(g)(ii) [40 CFR 63.7545(e)(8)and 63.7530 e and(01 The Permittee shall submit a notification of intent to fire an This condition Natural gas was alternative fuel within 48 hours of the became not curtailed nor Natural gas/ PS-A 2.1(A)(7)(h) declaration of each period of natural effective on was there a supply No.2 fuel oil- PS-B gas curtailment or supply interruption. No NA NA May 20,2019. interruption in The notification shall contain the fired boiler PS-C 03735T47-48 An alternative 2020.Boiler PS-C information specified in 2.1(A)(7)(h)(i)through fuel was not has not been 2.1(A)(7)(h)(v). fired in 2020. constructed. 40 CFR 63.7545 This condition The Permittee shall comply with the became work practice standards in Section 2.1 effective on Natural gas/ PS-A 2.1(A)(7)(i) May 20,2019. Boiler PS-C has No.2 fuel oil- PS-B A.7.j,below at all times the boilers No Yes NA Records of work not been fired boiler PS-C 03735T47-48 op erating.Nos.PS-A,PS-B and PS-C)are practices constructed. operating. [40 CFR 63.7500(f)and 63.7505(a)] requirements are maintained onsite. Air Quality Permit No.03 73 5T47 and 48 Page 14 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall conduct a tune-up of the boilers(ID Nos.PS-A,PS-B This condition and PS-C)as specified below.The became Natural gas/ PS-A 2.1(A)(7)0) Permittee shall conduct the tune-up effective on Boiler PS-C has No.2 fuel oil- PS-B while burning the type of fuel that No Yes NA May 20,2019. not been fired boiler PS-C 03735T47-48 provided the majority of the heat input Only natural gas constructed. to the boiler of the 12 months prior to was combusted the tune-up. in PS-A and PS- [40 CFR 63.7500(a)and B in 2020. 63.7540 a 10 and 12 This condition became The tune-ups for the boilers(ID Nos. effective on PS-A,PS-B and PS-C)shall be May 20,2019. Natural gas/ PS-A 2.1(A)(7)(k) conducted according to the schedule Tune-ups were Boiler PS-C has No.2 fuel oil- PS-B located in 2.1(A)(7)(k)(i)through No Yes NA completed per not been fired boiler PS-C 03735T47-48 2.1(A)(7)(k)(iii). [Table 3 of Subpart schedule in Feb constructed. DDDDD] and Mar 2019. [40 CFR 63.7540(a)(12),63.7515(d)] Next tune-ups for PS-A and PS-B are due in 2024. If the boilers(ID Nos.PS-A,PS-B and This condition PS-C)are not operating on the became Natural gas/ PS-A 2.1(A)(7)(1) required date for a tune-up,the tune- effective on Boiler PS-C has No.2 fuel oil- PS-B up must be conducted within 30 No Yes NA May 20,2019. not been fired boiler PS-C 03735T47-48 calendar days of startup. Boilers PS-A constructed. [40 CFR 63.7515(g)and and PS-B did 63.7540(a)(13)] not require a delayed tune-up. Air Quality Permit No. 03735T47 and 48 Page 15 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) At all times,the Permittee shall operate and maintain the boiler, This condition including associated air pollution became control equipment and monitoring effective on equipment,in a manner consistent 20, 1 9. with safety and good air pollution May control practices for minimizing re o and d PS- S-B Natural gas/ PS-A 2.1(A)(7)(m) emissions.Determination of whether are operated and Boiler PS-C has No.2 fuel oil- PS-B such operation and maintenance No Yes NA maintained in a manner not been fired boiler PS-C 03735T47-48 procedures are being used will be constructed. based on information available to consistent with DAQ that may include,but is not safety and good limited to,monitoring results,review air pollution control practices of operation and maintenance procedures,review of operation and for minimizing emissions. maintenance records,and inspection of the source. 40 CFR 63.7500(a)(3)] To demonstrate initial compliance,the Permittee shall also conduct a one- time energy assessment for the existing boilers(ID No.PS-A and PS- B)performed by a qualified energy This condition assessor.The energy assessment must became The one-time . Natural gas/ PS-A 2.1(A)(7)(n) effective on Energy No.2 fuel oil- PS-B be conducted no later than May 20, No Yes NA May 20,2019. Assessment was 2019.The energy assessment must fired boiler 03735T47-48 include the 32 on-site technical hours Records are completed on Feb as defined in 40 CFR 63.7575 and maintained 11-13,2019. shall include the information specified onsite. in 2.1(A)(7)(n)(i)through 2.1(A)(7)(n)(viii) 40 CFR 63.7500 a 1 ,Table 3 �I Air Quality Permit No.03735T47 and 48 Page 16 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall keep the records This condition specified in 2.1(A)(7)(o)(i)through became Natural gas/ PS-A 2.1(A)(7)(o) 2.1(A)(7)(o)(iv). effective on Boiler PS-C has No.2 fuel oil- PS-B [40 CFR 63.1 0(b)(2)(xiv)and(vi),40 No Yes NA May 20,2019. not been fired boiler PS-C 03735T47-48 CFR 63.10(b)(2),40 CFR Records constructed. 63.7555(a)(1)and(h) 15A NCAC 02Q maintained in a .0508 monthly report. This condition became effective on The Permittee shall comply with the May 20,2019. recordkeeping requirements specified Records are kept Natural gas/ PS-A 2.1(A)(7)(p) in 2.1(A)(7)(p)(i)through in accordance Boiler PS-C has No.2 fuel oil- PS-B 2.1(A)(7)(p)(iii). No Yes NA with the not been fired boiler PS-C 03735T47-48 [40 CFR 63.7560,40 CFR requirements constructed. 63.10(b)(1), 15A NCAC 02Q specified in .0508(f)] conditions 2.1(A)(7)(p)(i) through 2.1 A 7 iii). The Permittee shall submit compliance reports to the DAQ every five years.The first report shall cover the period beginning on the compliance date specified in Section 2.1 A.7.e,above,and ending on Future reports will This condition be submitted Natural gas/ PS-A 2.1(A)(7)(q) December 31 within five years after No.2 fuel oil- PS-B the compliance date in Section 2.1 No Yes NA became following effective fired boiler PS-C 03735T47-48 A.7.e,above.Subsequent reports shall completion of the cover the five-year periods from May 20,2011 9. subsequent tune- January 1 to December 31.The up' compliance reports shall be postmarked on or before January 31. [40 CFR 63.7550(a),(b)and 63.10(a)(4), 5 Air Quality Permit No. 03735T47 and 48 Page 17 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall submit the annual compliance report via the CEDRI.The Permittee shall use the appropriate electronic report in CEDRI 40 CFR Part 63,Subpart DDDDD.Instead of using the electronic report in CEDRI This condition for this 40 CFR Part 63,Subpart became DDDDD,the Permittee may submit an alternate electronic file consistent with effective 9. Natural gas/ PS-A 2.1(A)(7)(r) the XML schema listed on the CEDRI May 20, al 1 Boiler PS-C has Annual No.2 fuel oil- PS-B Web site,once the XML schema is No Yes NA compliance not been fired boiler PS-C 03735T47-48 available.If the reporting form constructed. specific to 40 CFR Part 63,Subpart reports were not DDDDD is not available in CEDRI at required during the time that the report is due,the this reporting Permittee shall submit the report to period. DAQ.The Permittee shall begin submitting reports via CEDRI no later than 90 days after the form becomes available in CEDRI. 40 CFR 63.7550(h)(3)] This condition The Permittee shall include the became information specified in 2.1(A)(7)(s)(i) effective on Natural gas/ PS-A 2.1(A)(7)(s) through 2.1(A)(7)(s)(v)in the annual May 20,2019. Boiler PS-C has No.2 fuel oil- PS-B compliance report. No Yes NA Annual not been compliance fired boiler PS-C 03735T47-48 [40 CFR 63.7550(a)and(c)(1), comp reports were not constructed. (c)(5)(i)through(iii),(c)(5)(xiv), (c)(5)(xvii),and Table 9] required during this reporting period. Air Quality Permit No.03735T47 and 48 Page 18 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) If the Permittee has a period of noncompliance with a work practice This condition standard for periods of startup and became effectivon e Natural gas/ PS-A 2.1(A)(7)(t) shutdown during the reporting period, May 20,2019. Boiler PS-C has No.2 fuel oil- PS-B the compliance report must also No Yes NA There were not been fired boiler PS-C 03735T47-48 contain the information specified in n constructed. an 2.1(A)(7)(t)(i)and 2.1(A)(7)(t)(ii). periods - [40 CFR 63.7540(b),63.7550(a)and compliance in d and Table 91 2020. Alternative Operating Scenarios NS-A,NS- The Permittee,contemporaneously B,NS-C, with making a change from one The Primary NS-D-1, alternative operating scenario to Operating Alternative NS-E,NS- 2.1 (B)(1)(a) another,shall record in a logbook Scenario was Operating F,NS-M, (written or electronic format)the No Yes NA not applicable in Scenarios NS-N,NS- 03735T47-48 scenario under which it is operating. 2020. Records O,NS-P, The Primary Operating Scenarios maintained NS-G-I and (POS)are defined in 2.1(B)(1)(a)(i) onsite. NS-K through 2.1(B)(1)(a)(iii). 15NCAC 02 .0508 The Alternative Operating Scenario (AOS)is defined as the HFPO Process, Vinyl Ethers North Process,Vinyl NS-A,NS- Ethers South Process,RSU Process, B,NS-C, FPS Liquid Waste Stabilization NS-D-1 Process,MMF Process,IXM Resins Process-except Fluorinator,E-2 Moved Alternative NS-E,NS- 2.1 (B)(1)(b) process,TFE/CO2 Process,HFPO permanently to the Operating F,NS-G-1, Product Container Decontamination No Yes NA Records review. AOS on December Scenarios NS-K,NS- 03735T47-48 process,VEN Product 31,2019. M,NS-N, Decontamination Process,and VES NS-O and Product Decontamination Process are NS-P controlled by the Thermal Oxidizer(ID No.NCD-Q 1)in series with the 4- Stage Scrubber(ID No.NCD-Q2). 15NCAC 02Q.05080)1 Air Quality Permit No.03 73 5T47 and 48 Page 19 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) Under both the POS and AOS,the Alternative 2.1 (B)(1)(c) IXM Resins Process—Fluorinator is NS-G-2 controlled by a caustic scrubber(ID Operating NS-H NS-I No.NCD-G2)and the IXM Membrane No Yes NA Records review. Scenarios 03735T48 Process,IXM Membrane Coating are uncontrolled. 15NCAC 02 .0508 Under the AOS,the VE-North Indoor Fugitives(ID No.NS-13-2)are controlled by a carbon adsorber(ID No.NCD-Q3),VE-South Indoor Alternative NS-B 2.1(B)(1)(d) Records-2, Fugitives(ID No.NS-C-2)are The Semiworks NS-C-2, No Yes NA maintained on controlled by a carbon adsorber(ID carbon adsorber Operating SW-1, No.NCD-Q4),and Semiworks was not installed in Scenarios SW-2 03735T48 polymerization Operation(ID No. site. 2020. SW-1)and Semiworks Laboratory Hood(ID No.SW-2)are controlled by a carbon adsorber(ID No.SCD-SWI). 15NCAC 02 .0508 Condition no d. NS-A,NS- The Permittee shall permanently Permittee longer valid. B,NS-C, switch to the AOS no later than NS-D-1, December 31,2019. Once the permanently Alternative NS-E,NS- 2.1(B)(1)(e) Permittee begins operation under the switched to Operating F,NS-M, AOS,they shall no longer operate No Yes NA AOS on Scenarios NS-N NS- 03735T48 under the POS. The Permittee shall December 31, O,NS-P, submit a notification to DAQ within 10 2019. NS-G-1 and days of permanently switching to the Notification sent NS-K AOS. [15NCAC 02Q.05080)] to DAQ December 31 2019. Air Quality Permit No.03735T47 and 48 Page 20 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Particulates from Miscellaneous Industrial Processes IXM membrane 2.1(B)(2)(a) Emissions of particulate matter from No visible coating process NS-I the membrane coating process and No NA NA emissions and S03 System NS-D-2 03735T47-48 S03 system shall not exceed an observed in allowable emission rate as calculated 2020. by the equation in 2.1(B)(2)(a). 15A NCAC 02D.0515 If emissions testing is required,the Emissions NS-I IXM membrane 2.1(B)(2)(b) testing was not testing shall be performed in coating process No NA NA required for and S03 System NS-D-2 03735T47-48 accordance with General Condition JJ. these sources in [15A NCAC 02Q.0508(f)] 2020. The Permittee shall maintain production records such that the process rates"P"in tons per hour,as FPS/IXM specified by the formulas contained IXM membrane 2.1(B)(2)(c) Production coating process NS-I above(or the formulas contained in No Yes NA Records and and S03 System NS-D-2 03735T47-48 15A NCAC 02D.0515)can be S03 tank derived,and shall make these records volume. available to a DAQ authorized representative upon request. 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 21 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall submit a summary report of monitoring and recordkeeping activities specified in Section 2.1 B.2.c,above,postmarked on or before January 30 of each calendar year for the preceding six- Semi-annual IXM membrane 2.1(B)(2)(d) reports sent to NS-I month period between July and coating process No Yes NA the NC DAQ and S03 System NS-D-2 03735T47-48 December and July 30 of each calendar FRO by the due year for the preceding six-month period between January and June. All dates. instances of deviations from the requirements of this permit must be clearly identified. 15A NCAC 02 .0508 Sulfur Dioxide Emissions from Combustion Sources AOS:Emissions of sulfur dioxide shall 2.1(B)(3)(a) not exceed 2.3 pounds per million Btu Inherent Thermal No Yes NA heat input. Sulfur dioxide formed by compliance with Oxidizer NCD-Q1 the combustion of sulfur in fuels, combustion of 03735T47-48 wastes,ores,and other substances shall natural gas. be included when determining compliance with this standard. 15A NCAC 02D.0516 2.1(13)(3)(b) If emissions testing is required,the Emission testing Thermal NCD-Q 1 testing shall be performed in No NA NA of NCD-Q1 was Oxidizer accordance with General Condition JJ. not required for 03735T47-48 15A NCAC 02 .0508 SO2 in 2020. No monitoring or recordkeeping is 2.1 B 3 c required for sulfur dioxide emissions Thermal Oxidizer NCD-Q1 from the firing of natural gas in the NA NA NA 03735T47-48 Thermal Oxidizer. 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 22 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Control of Visible Emissions Visible emissions from the membrane coating process,the S03 system and the outlet of the 4-Stage scrubber shall IXM membrane not be more than 20 percent opacity coating process, NS-I 2.1(B when averaged over a six-minute)(4)(a) period. However,six-minute No visible S03 and NS-D-2 No NA NA emissions noted averaging periods may exceed 20 Thermal NCD-Q2 03735T47-48 in 2020. percent not more than once in any hour Oxidizer and not more than four times in any 24-hour period. In no event shall the six-minute average exceed 87 percent opacity. 15A NCAC 02D.0521 IXM membrane If emissions testing is required,the Emissions coating process, NS-I 2.1(B)(4)(b) testing was not testing shall be performed in S03 and NS-D-2 No NA NA required for Thermal NCD-Q2 03735T47-48 accordance with General Condition JJ. these sources in Oxidizer [15A NCAC 02Q.0508(f)] 2020. IXM membrane No monitorin recordkee in � p g/ coating process, NS-I 2.1(13)(4)(c) reporting is required for visible S03 and NS-D-2 emissions from these sources. NA NA NA NA Thermal NCD-Q2 03735T47-48 [15A NCAC 02Q.0508(f)] Oxidizer Prevention of Significant Deterioration In order to avoid applicability of 15A NCAC 02D.530(g)for major sources 2.1(B)(5)(a) and major modifications the Vinyl Monthly PSD Vinyl Ethers avoidance NS-B Ethers North process shall discharge No Yes NA North process 03735T47-48 into the atmosphere less than 68.9 tons reports maintained. of VOCs per consecutive 12-month period. 15A NCAC 02 .0317 i Air Quality Permit No.03735T47 and 48 Page 23 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) 2.1(13)(5)(b) If emissions testing is required,the Emissions Vinyl Ethers NS-B Permittee shall perform such testing in No NA NA testing was not North process 03735T47-48 accordance with General Condition JJ. required for this [I 5A NCAC 02 .0508 source in 2020. To demonstrate compliance with the limit provided in Section 2.1 B.5.a, above,within 30 days of the end of each calendar month the Permittee Monthly PSD 2.1(B)(5)(c) shall create and retain production Vinyl Ethers avoidance NS-B records and estimate associated VOC No Yes NA North process 03735'1'47-48 emissions for the previous calendar reports maintained. month,following the specified steps listed in 2.1(13)(5)(c)(i)through (13)(5)(c)(X). 15A NCAC 02 .0508 Required records shall be maintained 2.1(13)(5)(d) in a logbook(written or electronic Monthly PSD Vinyl Ethers NS-B No Yes NA format)on-site and made available to avoidance North process an authorized representative upon reports are 03735T47-48 request. available on site. [I 5A NCAC 02 .0508 Air Quality Permit No. 03735T47 and 48 Page 24 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall submit a semi- annual summary report of monitoring and recordkeeping activities specified in Section 2.1 B.5.c,and d,above, postmarked on or before January 30 of each calendar year for the preceding Semi-annual six-month period between July and reports sent to Vinyl Ethers 2.1(B)(5)(e)NS-B No Yes NA December,and July 30 of each the NC Division North process calendar year for the preceding six- of Air Quality 03735T47-48 month period between January and FRO by the due June. The report shall contain the dates. information specified in 2.1(13)(5)(e)(i)through 2.1(13)(5)(e)(iii). 15A NCAC 02 .0508 Prevention of Significant Deterioration In order to avoid applicability of 15A NCAC 02D.0530(g)for major sources 2.1(B)(6)(a) and major modifications,the IXM Monthly PSD IXM Resins NS-G-I Resins Process(except Fluorinator) No Yes NA avoidance Process NS-G-2 03735T47-48 and the IXM Resins Process reports Fluorinator shall discharge into the maintained. atmosphere less than 40 tons of VOCs per consecutive 12-month period. 15A NCAC 02 .0317 If emissions testing is required,the Emissions 2.1(B)(6)(b) testing was not IXM Resins NS-G-I Permittee shall perform such testing in No NA NA required for Process NS-G-2 03735T47-48 accordance with General Condition JJ. these sources in [15A NCAC 02Q.0508(f)] 2020. Air Quality Permit No.03735T47 and 48 Page 25 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) To demonstrate compliance with the limit provided in Section 2.1 B.6.a., within 30 days of the end of each calendar month the Permittee shall Monthly PSD IXM Resins NS-G-1 2.1(13)(6)(c) create and retain production records avoidance and estimate associated VOC No Yes NA Process NS-G-2 03735T47-48 emissions for the previous calendar reports maintained. month,following the specified steps listed in 2.1(13)(6)(c)(i)through 2.1(13)(6)(c)(vi). 15A NCAC 02 .0508 Required records shall be maintained 2.1(B)(6)(d) in a logbook(written or electronic Monthly PSD IXM Resins NS-G-1 format)on-site and made available to No Yes NA avoidance Process NS-G-2 an authorized representative upon reports are 03735T47-48 request. available on site. 15A NCAC 02 .0508 The Permittee shall submit a semi- annual summary report of monitoring and recordkeeping activities specified in Section 2.1 B.6.c and B.6.d,above, postmarked on or before January 30 of each calendar year for the preceding Semi-annual 2.1(B)(6)(e) reports sent to IXM Resins NS-G-1 six-month period between July and No Yes NA the NC DAQ Process NS-G-2 03735T47-48 December,and July 30 of each FRO by the due calendar year for the preceding six- month period between January and dates. June. The report shall contain the information specified in 2.1(13)(6)(e)(i) through 2.1(13)(6)(e)(iii). 15A NCAC 02 .0508 Air Quality Permit No.03 73 5T47 and 48 Page 26 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Source Control Permit and Condition Deviation? Maintained? Non- Determining Comments Description Device ID Condition Yes/No) ( p p Yes/No/ Compliance Compliance Summary ( � No.(s) Number NA) Issue. Status (Yes/No) Prevention of Significant Deterioration In order to avoid applicability of 15A NCAC 02D.0530(g)for major sources Monthly PSD 2.1(13)(7)(a) and major modifications,the HFPO avoidance HFPO process NS-A process shall discharge into the No Yes NA 03735T47-48 atmosphere less than 85.3 tons of reports maintained. VOCs per consecutive 12-month period. 15A NCAC 02 .0317 2.1(13)(7)(b) If emissions testing is required,the Emissions HFPO process NS-A Permittee shall perform such testing in No NA NA testing was not 03735T47-48 accordance with General Condition JJ. required for this 15A NCAC 02 .0508 source in 2020. To demonstrate compliance with the limit provided in Section 2.1 B.7.a, above,within 30 days of the end of each calendar month the Permittee 2.1(B)(7)(c) shall create and retain production Monthly PSD HFPO process NS-A records and estimate associated VOC No Yes NA avoidance 03735T47-48 emissions for the previous calendar reports maintained. month,following the specified steps listed in 2.1(13)(7)(c)(i)through 2.1(13)(7)(c)(viii). 15A NCAC 02 .0508 Required records shall be maintained 2.1(13)(7)(d) in a logbook(written or electronic Monthly PSD HFPO process NS-A format)on-site and made available to No Yes NA avoidance 03735T47-48 an authorized representative upon reports are request. available on site. 15A NCAC 02 .0508 Air Quality Permit No. 03735T47 and 48 Page 27 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall submit a semi- annual summary report of monitoring and recordkeeping activities specified in Section 2.1 B.7.c and d,above, postmarked on or before January 30 of each calendar year for the preceding Semi-annual 2.1(13)(7)(e) six-month period between July and reports sent to HFPO process NS-A December,and July 30 of each No Yes NA the NC DAQ 03735T47-48 calendar year for the preceding six- FRO by the due month period between January and dates. June. The report shall contain the information specified in 2.1(13)(7)(e)(i) through 2.1(13)(7)(e)(iii). 15A NCAC 02 .0508 Prevention of Significant Deterioration In order to avoid applicability of 15A NCAC 02D.0530(g)for major sources HFPO Product 2.1(13)(8)(a) and major modifications,the HFPO Monthly PSD Container NS-N No Yes N�Product Container Decontamination avoidance Decontami- 03735T47-48 Process shall discharge into the reports nation Process atmosphere less than 40.0 tons of maintained. VOCs per consecutive 12-month period. 15A NCAC 02 .0317 HFPO Product 2.1(13)(8)(b) If emissions testing is required,the Emissions Container NS-N No NA NA Permittee shall perform such testing in testing was not Decontami- accordance with General Condition JJ. required for this nation Process 03735T47-48 15A NCAC 02 .0508 source in 2020. Air Quality Permit No. 03735T47 and 48 Page 28 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) To demonstrate compliance with the limit provided in Section 2.1 B.8.a, above,within 30 days of the end of HFPO Product each calendar month the Permittee Monthly PSD 2.1(B)(8)(c) shall create and retain records and Container avoidance DeconNS-N estimate associated VOC emissions for No Yes NA nation roc 03735T47-48 the previous calendar month,following reports nation Process maintained. the specified steps listed in 2.1(13)(8)(c)(i)through 2.1(13)(8)(c)(iii). 15A NCAC 02 .0508 Required records shall be maintained HFPO Product 2.1(13)(8)(d) in a logbook(written or electronic Monthly PSD Container NS-N No Yes NA format)on-site and made available to avoidance Decontami- 03735T47-48 an authorized representative upon reports are nation Process request. available on site. 15A NCAC 02 .0508 The Permittee shall submit a semi- annual summary report of monitoring and recordkeeping activities specified in Section 2.1 B.8.c and B.8.d,above, postmarked on or before January 30 of HFPO Product each calendar year for the preceding Semi-annual 2.1(B)(8)(e) reports sent to Container NS-N six-month period between July and No Yes NA the NC DAQ Decontami- 03735T47-48 December,and July 30 of each FRO by the due nation Process calendar year for the preceding six- dates. month period between January and June. The report shall contain the information specified in 2.1(13)(8)(e)(i) through 2.1(B)(8)(e)(iii). 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 29 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Prevention of Significant Deterioration The Permittee has used projected actual emissions to avoid applicability of prevention of significant deterioration requirements pursuant to The required 2.1(B)(9)(a) application 0900009.16A for the Spray report was IXM Membrane submitted to NC NS-I Coating Throughput Increase Project. No Yes NA Coating 03735T47-48 In order to verify the assumptions used DAQ on February 28, in the projected actual emissions calculations,the Permittee shall 2020. comply with the requirements in Section 2.1 (13)(9)(b),below. 15A NCAC 02D.053 0 u The Permittee shall perform the following: i. Maintain records of annual VOC emissions from the IXM Membrane Coating Process in tons per year,on a calendar year basis. ii. Submit a report to the director within 60 days after the end of The required each calendar year during which 2.1(B)(9)(b) these records must be generated. report was IXM Membrane submitted to NC NS-I iii. Make the information documented No Yes NA DAQ Coating 03735T47-48 and maintained under this on February 28, condition available to the Director 2020. or the general public. iv. Provide a comparison of the reported actual emissions(post- construction emissions)for each of the ten calendar years to the projected actual emissions [15A NCAC 02D.0530(u)and 02Q .0308 Air Quality Permit No. 03735T47 and 48 Page 30 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Comments Source Condition Description Device ID Condition Summary (Y ) (Yes Yes/No/ Compliance Com Dance � p No.(s) Number NA) Issue. Status (Yes/No) NESHAP for Miscellaneous Organic Chemical Manufacturing For each miscellaneous organic NS-A, chemical manufacturing process unit, Records NS-B, MCPU,the Permittee shall comply maintained NS-13-2, 2.1(B)(10)(a) with all applicable provisions, onsite. Semi- FPS/IXM NS-C, including the notification,testing, annual processes NS-C-2 recordkeeping,and monitoring No Yes NA Compliance and 03735T47-48 requirements contained in 15A NCAC Reports were NS-G-I 02D.l 111,"Maximum Achievable submitted by the NS-G-2 Control Technology"as promulgated due dates. in 40 CFR 63,Subpart FFFF,including Subpart A,"General Provisions". 15A NCAC 02D.1111 NS-A, NS-B, Opening a safety device,as defined in NS-13-2, 2 1(13)(10)(b) §63.2550,is allowed at any time A safety device FPS/IXM NS-C, conditions require it to avoid unsafe No Yes NA was not opened processes NS-C-2 03735T47-48 conditions. in 2020. and [40 CFR 63.2450(p)] NS-G-I NS-G-2 The Permittee shall identify each pump,compressor,agitator,pressure NS-A, relief device,sampling connection NS-B, system,open-ended valve or line, NS-13-2, valve,connector,and instrumentation Physical tagging Site Procedure FPS/IXM NS-C, 2.1(13)(10)(c) system in organic HAP service within in field and NG-18 is the MON each MCPU. Identification of the No Yes NA processes NS-C-2 identification on MACT LDAR and 03735T47-48 equipment does not require physical P&I drawings. written plan. NS-G-1 tagging of the equipment. NS-G-2 The Permittee must identify equipment as specified in 2.1(13)(1 0)(c)(i)through 2.1(13)(1 0)(c)(iv). 40 CFR 63.2480 a 40 CFR 63.1022 II Air Quality Permit No.03735T47 and 48 Page 31 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) If the Permittee designates equipment as unsafe-to-monitor or difficult to Site Procedure N/S-A, monitor,the Permittee shall create NG-18 is the NS-B, written plans as specified below.The MON MACT NS-B-2, 2.1(B)(10)(d) Permittee shall retain the written plans LDAR written FPSIXM NS-C, on-site,and make them available to plan that processes NS-C-2 NC DAQ for review upon request, No Yes NA identifies and 03735T47-48 including 2.1(13)(10)(d)(i)"unsafe-to- unsafe-to- NS-G-1 monitor equipment"and monitor and NS-G-2 2.1(13)(10)(d)(ii)"difficult-to-monitor unsafe-to-repair equipment." equipment. 40 CFR 63.1022(c)(4)] NS-A, Valves in Light Liquid,Gas and Vapor NS-B, Service NS-B-2, 2.1(B)(10)(e) The instrument reading that defines a FPS/IXM NS-C, leaking valve is 500 ppm or greater. NA NA NA NA processes NS-C-2 03735T47-48 [40 CFR 63.2480(a),40 CFR 63.1025, and 40 CFR Subpart UU, 15A NCAC 02D NS-G-1 .1111] NS-G-2 Valves in Light Liquid,Gas and Vapor Service The Permittee shall monitor valves for leaks using the instrument monitoring NS-A, methods described in 40 CFR NS-B, 63.1023(b)and(c)at the frequency NS-13-2, specified in 2.1(13)(1 0)(f)(i)through LDAR FPS/IXM NS-C, 2.1(B)(10)(f) 2 1(B)(10)(f)(v). The Permittee may No Yes NA monitoring processes NS-C-2 choose to subdivide the valves in the reports from and 03735T47-48 applicable process units or groups of Team Inc. NS-G-I process units and apply the provisions NS-G-2 above to each subgroup. If the Permittee elects to subdivide the valves,it shall comply with the provisions of 40 CFR 63.1025(b)(4). 40 CFR 63.1025 b Air Quality Permit No.03735T47 and 48 Page 32 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) NS-A, Valves in Light t Liquid,Gas and Vapor NS-B, Service NS-13-2, The percentage of leaking valves,used LDAR FPS/IXM NS-C, 2.1(B)(10)(g) to determine the required monitoring monitoring processes NS-C-2 frequency in Section 2.1(B)(10)(f), No Yes NA reports from and 03735T47-48 above,shall be calculated according to Team Inc. NS-G-I the procedures in 40 CFR 63.1025(c). NS-G-2 40 CFR 63.1025 c NS-A, Valves in Light Liquid,Gas and Vapor NS-B, NS-B-2, Service FPS/IXM NS-C, 2.1(13)(10)(h) The Permittee shall create and retain a Scheduled and processes NS-C-2 record of the monitoring schedule for No Yes NA retained via SAP and 03735T47-48 each process unit. Work Order. and N [40 CFR 63. 1025(b)(3)(vi),40 CFR NS-G-2 63. 1038(c)(1)(i)] Air Quality Permit No.03735T47 and 48 Page 33 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Valves in Light Liquid,Gas and Vapor Service If a leak is identified: i. It shall be repaired as provided in the repair provisions of Section 2.1(B)(10)(bb)through (13)(10)(cc). ii. After a leak has been repaired,the valve shall be monitored at least NS-A, once within the first 3 months NS-B, after its repair. This requirement NS-13-2, is in addition to the monitoring FPS/IXM NS-C, 2.1(B)(10)(i) required to satisfy the definition Leaker Detail No Yes NA Report from processes NS-C-2 of repaired and first attempt at and 03735T47-48 repair.The required periodic Team Inc. NS-G-1 monitoring in Section 2.1 B.IOX, NS-G-2 above,may be used if it satisfies the timing requirement of this condition.If a leak is detected by this follow-up monitoring,the provisions in 2.1(13)(10)(i)(A) through 2.1(13)(10)(i)(B)must be used to determine whether the valve must be counted as a leaking valve. 15A NCAC 02D.1111 II Air Quality Permit No.03735T47 and 48 Page 34 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Valves in Lightquid,Gas and Vapor NS-A, Service NS-B, Any valve that is designated unsafe-to- NS-13-2, monitor according to Section Site Procedure FPS/IXM NS-C, 2.1(13)(10)0) 2.1(13)(10)(c),above,is exempt from NG-18 is the processes NS-C-2 the monitoring and repair requirements No Yes NA MON MACT and 03735T47-48 specified in Section 2.1(13)(10)(f)and LDAR written NS-G-1 (13)(10)(i),and the Permittee shall plan. NS-G-2 monitor the valve according to the written plan in Section 2.1 (13)(10)(d). 15A NCAC 02D.1111 Valves in Light Liquid,Gas and Vapor NS-A, Service NS-B, Any valve that is designated as NS-13-2, difficult-to-monitor according to 2.1(B)(10)(k) Section 2.1(B)(10)(c),above is The site does FPS/IXM NS-C, not have exempt from the monitoring No Yes NA processes NS-C-2 difficult-to- and 03735T47-48 requirements of Section 2.1(13)(10)(f) monitor valves. NS-G-1 and(13)(10)(i),and the Permittee shall NS-G-2 monitor the valve according to the written plan in Section 2.1 (13)(10)(d). 15A NCAC 02D.1111 All pumps subject to the NS-A, Pumps in LightLiquid Service MON MACT NS-B, The instrument reading that defines a are designed NS-B-2, with no 2.1(13)(10)(1) leaking pump is 1,000 ppm or greater. FPS/IXM NS-C, Repair is not required unless an NA NA NA externally processes NS-C-2 actuated shaft and 03735T47-48 instrument reading of 2,000 ppm or penetrating the NS-G-1 greater is detected. pump housing NS-G-2 [40 CFR 63.1026(b)(2)(iii)and(b)(3)] and therefore are exempt from 63.1026 b. Air Quality Permit No.03735T47 and 48 Page 35 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Pumps in Light Liquid Service Each pump within the MCPUs shall be checked by visual inspection each All pumps calendar week for indications of liquids dripping from the pump seal. subject to the NS-A, MON MALT The visual inspection shall be NS-B, consistent with the methods described are designed NS-B-2, with no FPS/IXM NS-C, 2.1(13)(10)(m) in 40 CFR 63.1023(d). The Permittee externally shall document that the inspection was No Yes NA processes NS-C-2 03735T47-48 conducted and the date of the actuated shaft and inspection. If there are indications of penetrating the i NS-G-1 pump housing NS-G-2 liquid drippingfrom the um seal at and therefore are the time of the weekly inspection, follow either of the procedures listed in exempt from §63.1026(b). 2.1(13)(10)(m)(i)or 2.1(13)(10)(m)(ii). [40 CFR 63.1026(b)(4),40 CFR 63.103 8 c 2 i Pumps in Light Liquid Service All pumps The Permittee shall monitor affected subject to the NS-A, pumps once per calendar month using MON MACT NS-B, the instrument monitoring methods are designed NS-13-2, 2.1(13)(10)(n) described in 40 CFR 63.1023(b)and with no FPS/IXM NS-C, (c). Leaks shall be repaired as No Yes NA externally processes NS-C-2 03735T47-48 provided in Section 2.1(13)(10)(bb) actuated shaft and through(13)(10)(cc). The Permittee penetrating the NS-G-1 shall calculate the percent leaking pump housing NS-G-2 pumps using the procedures specified and therefore are in 40 CFR 63.1026(c). exempt from 40 CFR 63.1026 b 1 , c and d 63.1026 b . Air Quality Permit No.03735T47 and 48 Page 36 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Pumps in Light Liquid Service NS-A, Any Pump that is designated as unsafe- NS-B, to-monitor according to Section 2.1 NS-B-2, (13)(10)(c),above,is exempt from the FPS/IXM NS-C, 2.1(13)(10)(o) inspection requirements provided in There are not processes NS-C-2 Section 2.1(13)(10)(m)and(13)(10)(n), No Yes NA any unsafe-to- and 03735T47-48 above,and the Permittee shall monitor monitor pumps. NS-G-I and inspect the pump in accordance NS-G-2 with the written plan in Section 2.1(B)(1 0)(d). 40 CFR 63.1026(e)(6)] Connectors in Gas and Vapor and NS-A, Lightquid Service Site elects to NS-B, The Permittee shall comply with the comply with the NS-13-2, requirements requirements of 40 CFR 63.1027 for in FPS/IXM NS-C, 2.1(B)(10)(p) connectors ingas/vapor and light Permit liquid service.The Permittee may elect No Yes NA processes NS-C-2 Condition and 03735T47-48 to comply with the requirements in 2.1 B 10 Section 2.1(B)(10)(q)through )(q) NS-G-I (B)(10)(t),below,for connectors in through NS-G-2 (B)(10)(t). heavy liquid service. 40 CFR 63.2480(b)(4)] Connectors in Gas and Vapor and Light Liquid Service The Permittee shall monitor connectors If a potential NS-A, in each MCPU within 5 calendar days leak is found by NS-B, for leaks using the instrument visual,audible, NS-13-2, monitoring methods described in 40 olfactory,etc., FPS/IXM NS-C, 2.1(B)(10)(q) CFR 63.1023(b)and(c),as applicable, No Yes NA then the processes NS-C-2 if evidence of a potential leak to the connector is and 03735T47-48 atmosphere is found by visual,audible, monitored using NS-G-I olfactory,or any other detection a VOC detector NS-G-2 method,unless the potential leak is instrument repaired according to Section within 5 days. 2.1(13)(1 0)(s),below. 40 CFR 63.1029(b)(1)] Air Quality Permit No. 03735T47 and 48 Page 37 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Description Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Summary � No.(s) Number NA) Issue. Status (Yes/No) Connectors in Gas and Vapor and NS-A, Light Liquid Service NS-B, If an instrument reading of 500 parts NS-13-2, per million or greater is measured as LDAR FPS/IXM NS-C, 2.1(B)(10)(r) required in Section 2.1 B 10 q ( )( )(q)' No Yes NA monitoring 0373 ST47-48 processes NS-C-2 above,a leak is detected.The reports from and Permittee shall repair the leak Team Inc. NS-G-I according to Section 2.1(13)(10)(bb) NS-G-2 through(13)(10)(cc). 40 CFR 63.1029(b)(2)] Connectors in Gas and Vapor and NS-A, Light Liquid Service NS-B, For equipment identified in Section 2.1 (B)(10)(q),above,that is not i NS-B-2, LDAR All repairs are FPS/IXM NS-C 2.1(13)(10)(s) monitored by the method specified in monitoring verified via use of 40 CFR 63.1023 b and c as No Yes NA processes NS-C-2 ( ) ( )' reports from a VOC detector and 03735T47-48 applicable,a leak is considered Team Inc. instrument. NS-G-I repaired once the conditions listed in 2.1(B)(10)(s)(i)through NS-G-2 2.1(13)(10)(s)(iii)are met. 40 CFR 63.1029 c Air Quality Permit No.03735T47 and 48 Page 38 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Connectors in Gas and Vapor and Light Liquid Service The following are special provisions for connectors: i. Unsafe-to-repair connectors.Any connector that is designated as unsafe-to-repair as described in Section 2.1(13)(10)(c),above,is Site Procedure NS-A, exempt from the repair requirements NG-18 is the NS-B, in Section 2.1(13)(10)(bb).The MON MACT Permittee shall monitor these NS-B-2, LDAR written 2.1(B)(10)(t) connectors according to the written FPS/IXM NS-C, plan as specified in Section 2.1 No Yes NA plan that processes NS-C-2 identifies 03735T47-48 (B)(10)(d),above. and ii. Inaccessible,ceramic,or ceramic- unsafe-to- NS-G-1 lined connectors.Any connector that monitor and NS-G-2 is inaccessible or that is ceramic- unsafe-to-repair lined is exempt from the monitoring equipment. requirements specified in 40 CFR 63.1023(b)and(c);from the leak repair requirements of Section 2.1 (13)(10)(bb);from the recordkeeping and reporting requirements in this section. 40 CFR 63.1027 e NS-A, NS-B, Agitators in Gas and Vapor and Light NS-B-2, 2.1(B)(10)(u) Liquid Service FPS/IXM NS-C, The instrument reading that defines a NA NA NA NA processes NS-C-2 03735T47-48 leaking agitator is 10,000 ppm or greater.and NS-G-1 [40 CFR 63.10281 NS-G-2 1 Air Quality Permit No.03735T47 and 48 Page 39 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) NS-A, Agitators in Gas and Vapor and Light Weekly VEN NS-B, Liquid Service CMT Agitator NS-13-2, 2.1(13)(10)(v) The Permittee shall conduct visual and Inspection by FPS/IXM NS-C instrumentinspections as p Chemours& provided in No Yes NA processes NS-C-2 03735T4748 2 1 Monthly LDAR and - . B . B . ( )(10)(v)()i and 2 1( )(10)(v)(ii) monitoring NS-G-I [40 CFR 63.1028,40 CFR reports from NS-G-2 63.1038(c)(4)(i)] Team Inc. Agitators in Gas and Vapor and Light Site Procedure NS-A, Liquid Service NG-18 is the NS-B, If the Permittee designates agitator MON MACT NS-13-2, LDAR written FPS/IXM NS-C, 2.1(B)(10)(w) seals as either unsafe-to-monitor or plan that processes NS-C-2 difficult-to-monitor,the permittee shall No Yes NA identifies and 03735T47-48 comply with the requirements identifies -to- N and specified in 2.1(B)(10)(w)(i)and unsaf1( monitor and NS-G-2 2. B)(10)(w)(ii). unsafe-to-repair equipment. NS-A, Pressure Relief Valves NS-B, The instrument reading that defines a NS-13-2, 2.1(B)(10)(x) leaking pressure relief valve is 500 FPS/IXM NS-C, ppm or greater. This standard does not NA NA NA NA processes NS-C-2 apply during pressure releases as and 03735T47-48 provided in Section 2.1(13)(10)(y), NS-G-1 below. NS-G-2 r40 CFR 63.1030 NS-A, NS-B, Pressure Relief Valves Pressure relief NS-13-2, 2.1(B)(10)(y) The pressure relief device shall be valves are FPS/IXM NS-C, monitored as specified in exempt per 40 processes NS-C-2 2.1(B)(10)(y)(i)through No Yes NA CFR and 03735T47-48 2.1(13)(1 0)(y)(iii). 63.1030(d)and NS-G-1 [40 CFR 63.1023(b)and(c)] (e). NS-G-2 Air Quality Permit No.03735T47 and 48 Page 40 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Description Device ID Condition Summary (Yes/No) (Yes/No/ Compliance Compliance No. s Number NA Issue. Status (Yes/No) NS-A, NS-B, When a leak is detected using either NS-B-2, sensory or instrument monitoring Tags are FPS/IXM NS-C, 2.1(B)(10)(z) hung methods,a weatherproof and readily hung by Team No Yes NA Inc.upon processes NS-C-2 visible identification shall be attached and 03735T47-48 to the leaking equipment. discovery of a leak. NS-G-1 [40 CFR 63.2480(a)] NS-G-2 NS-A, NS-B, Leak identifications that are placed on Leaker Tags are NS-13-2, 2.1(B)(10)(aa) leaking equipment may be removed as removed by FPS/IXM NS-C, specified in 2.1(13)(10)(w)(i)and No Yes NA Team Inc. processes NS-C-2 03735T47-48 2.1 B 10 w ii . following re- and ( )( )( )(��) g N and [40 CFR 63.1024(c)] monitoring. NS-G-2 The Permittee shall repair each leak detected as soon as practical,but not later than 15 calendar days after it is NS-B, detected,except where"Delay of NS-13-2, Repair"or"Unsafe to Repair" FPS/IXM NS-C, 2.1(13)(10)(bb) provisions apply. A first attempt at Leaker Detail processes NS-C-2 repair shall be made no later than 5 No Yes NA Report from and 03735T47-48 calendar days after the leak is detected. Team Inc. NS-G-I First attempt repairs are specified in NS-G-2 2.1(13)(10)(bb)(i)and 2.1(13)(10)(bb)(ii). [40 CFR 63.2480(a),40 CFR 63, Subpart UU i Air Quality Permit No.03735T47 and 48 Page 41 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Delay of repair is allowed for any of NS-A, the conditions listed in NS-B, 2.1(13)(10)(cc)(i)through NS-13-2, 2.1(B)(10)(cc)(v). The Permittee shall 2.1(B)(10)(cc) Delay of repair FPS/IXM NS-C, maintain a record of the facts that No Yes NA incidents did not processes NS-C-2 03735T47-48 explain any delay of repairs and,where occur in 2020. and appropriate,why the repair was NS-G-1 technically infeasible without a process NS-G-2 unit shutdown. 15A NCAC 02D.l 111 NS-A, NS-B, For each leak detected,the information NS-13-2, specified in 2.1(B)(10)(dd)(i)through FPS/IXM NS-C, 2.1(B)(10)(dd) 2.1(B)(10)(dd)(v)shall be recorded Leaker Detail No Yes NA Report from processes NS-C-2 and maintained. and 03735T47-48 [40 CFR 63.1023(e)(2),40 CFR Team Inc. NS-G-I 63.1024(f),40 CFR 63. 1038(b)] NS-G-2 NS-A, All equipment is NS-B, physically NS-13-2, The Permittee shall create and retain tagged. FPS/IXM NS-C, 2.1(13)(10)(ee) the general records as specified in processes NS-C-2 2.1(13)(10)(ee)(i)through No Yes NA Site Procedure and 03735T47-48 2.1(13)(1 0)(ee)(iii). NG-18 is the NS-G-1 [40 CFR 63.1038(b)] MON MACT NS-G-2 LDAR written plan. Air Quality Permit No.03735T47 and 48 Page 42 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Heat Exchanger Requirements Site Procedure NS-A, The Permittee shall prepare and NG-18 is the NS-B, implement a monitoring plan that MON MACT NS-13-2, 2 1(B)(10)(ff) documents the procedures that will be LDAR written FPS/IXM NS-C, used to detect leaks of process fluids No Yes NA plan. processes NS-C-2 03735T47-48 into cooling water. The plan shall and meet the requirements specified in Analytical NS-G-1 2.1(13)(10)(ff)(i)through reports from NS-G-2 2.1(13)(10)(ff)(iii). TBL 40 CFR 63.2490,40 CFR 63.104 c Laboratory. Heat Exchanger Requirements Except as allowed by the delay of repair requirements in Section 2.1(13)(10)(hh),below,if a leak is detected in any heat exchanger system, NS-A, the Permittee shall be repair the leak as NS-B, soon as practical but not later than 45 Electronic NS-13-2, calendar days after the Permittee records FPS/IXM NS-C, 2.1(B)(10)(gg) receives results of monitoring tests No Yes NA maintained on processes NS-C-2 03735T47-48 indicating a leak,unless the Permittee site. Leaks did and demonstrates that the results are due to not occur in NS-G-1 a condition other than a leak. Once the 2020 NS-G-2 leak has been repaired,the owner or operator shall confirm that the heat exchange system has been repaired within 7 calendar days of the repair or startup,whichever is later. 40 CFR 63.2490,40 CFR 63.104 d Air Quality Permit No.03 73 5T47 and 48 Page 43 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Heat Exchangerquirements NS-A, Delay of repair of heat exchange NS-B, systems is allowed if the equipment is NS-13-2, isolated from the process. Delay of 2.1(B)(10)(hh) Delay of repairs FPS/IXM NS-C, repair is also allowed if repair is No Yes NA did not occur in processes NS-C-2 03735T47-48 technically infeasible without a 2020 and shutdown and any one of the NS-G-1 conditions listed in 40 CFR NS-G-2 63.104(e)(1)through(e)(2)is met. 40 CFR 63.2490,40 CFR 63.104 e NS-A, NS-B, Heat Exchanger Requirements NS-13-2, For each affected heat exchanger 2.1(B)(10)(ii) FPS/IXM NS-C, system,the Permittee shall retain the Leaks did not processes NS-C-2 records specified in 2.1(13)(1 0)(ii)(i) No Yes NA occur in 2020 and 03735T47-48 through 2.1 B 10 ii iv . NS-G-I [40 CFR 63.2490,40 CFR 63.104(f)] NS-G-2 NS-A, NS-B, The Permittee shall create and retain NS-13-2, )( )�)2.1(B 10 the records specified in Records FPS/IXM NS-C, 2.1 B 10 i through No Yes NA maintained processes NS-C-2 03735T47-48 2.1(B)(10)(jj)(vii)on each affected onsite. and MCPU. NS-G-I [40 CFR 63.2525(b)] NS-G-2 NS-A, NS-B, NS-B-2, Create and retain a record of each time FPS/IXM NS-C, 2.1(B)(10)(kk) a safety device is opened to avoid No Yes NA Safety Incident processes NS-C-2 03735T47-48 unsafe conditions. Reports. and [40 CFR 63.2525(f)] NS-G-I NS-G-2 Air Quality Permit No.03735T47 and 48 Page 44 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) NS-A, For each affected Group 2 wastewater NS-B, stream,the Permittee shall retain the Records NS-13-2, 2 1(13)(10)(11) records specified in 2.1(13)(10)(11)(i) maintained in FPS/IXM NS-C, through 2.1(13)(10)(11)(iv). No Yes NA the Notification processes NS-C-2 03735T47-48 [Table 7 of 40 CFR Part 63,Subpart F of Compliance and and Status Report. NS-G-I 40 CFR 63.147(b)(8)] NS-G-2 If a Group 2 emission point becomes a NS-A, Group 1 emission point,the Permittee NS-B, must be in compliance with the Group Group 2 NS-13-2, 2.1(B)(10)(mm) 1 requirements beginning on the date emission points FPS/IXM NS-C, the switch occurs. An initial No Yes NA did not become processes NS-C-2 compliance demonstration as specified a Group 1 and 03735T47-48 in 40 CFR 63,Subpart FFFF must be emission points NS-G-1 conducted within 150 days after the in 2020. NS-G-2 switch occurs. 40 CFR 63.2445 d The Permittee shall submit a semi- annual compliance report of monitoring and recordkeeping NS-A, activities postmarked on or before NS-B, January 30 of each calendar year for Semi-annual NS-13-2, the preceding six-month period reports sent to FPS/IXM NS-C, 2.1(B)(10)(nn) between July and December,and July No Yes NA the NC Division processes NS-C-2 30 of each calendar year for the of Air Quality and 03735T47-48 preceding six-month period between FRO by the due NS-G-I January and June. The report shall dates. NS-G-2 contain the items specified in 2.1(13)(10)(nn)(i)through 2.1(13)(1 0)(nn)(xi). 40 CFR 63.2520 a, b and e I Air Quality Permit No. 03735T47 and 48 Page 45 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) State Only Requirement(TO and Scrubber System) No later than December 31,2019,the 2.1(B)(1 1)(a) Permittee shall install and begin Thermal State Only normal operations of a Thermal Compliance The thermal NCD-Q 1 Oxidizer in series with a 4-Stage Testing was oxidizer system Oxidizer and NCD-Q2 Requirement Scrubber System. This system shall No NA NA conducted in was operational Stage Scrubberr reduce emissions of all PFAS, February 2020 throughout 2020. 03735T47-48 including Gen X Compounds by at least 99.99 percent. [15A NCAC 02Q.0519(a)(7)and Consent Order Testiniz 2.1(13)(11)(b) The Permittee shall conduct an initial Thermal State Only performance test of the Thermal Compliance NCD-Q l Testing was Oxidizer and 4- NCD-Q2 Requirement Oxidizer System and 4-Stage Scrubber No NA NA conducted in Stage Scrubber System and perform or provide the February 2020. 03735T47-48 information described in 2.1(13)(11)(b) 15A NCAC 02 ..0308 a Within 90 days of installation of the Thermal Oxidizer and 4-Stage 2.1(13)(11)(c) Scrubber System,the Permittee shall submit a report demonstrating initial Thermal State Only Report was Oxidizer and 4- NCD-Q1 Requirement compliance with the limits in No NA NA submitted on Stage Scrubber NCD-Q2 2.1(13)(11)(a),above,using the results March 30,2020. 03735T47-48 of the initial performance test conducted as specified in Section 2.1(B)(1 1)(b),above. 15A NCAC 02 .0308 a Air Quality Permit No.03735T47 and 48 Page 46 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) After the initial performance test is 2.1(13)(11)(d) conducted,the Permittee shall conduct Compliance periodic performance tests to Thermal State Only Testing was Oxidizer and 4- NCD-Q 1 Requirement demonstrate compliance with the limits No NA NA conducted in Stage Scrubber NCD-Q2 in Section 2.1 B.1 La,above,per Feb 2020 and 03735T47-48 2.1(13)(11)(d)(i)through again Jan 2021. 2.1(13)(11)(d)(iii). 15A NCAC 02 .0308 a During performance tests conducted Operate 2.1(13)(11)(e) according to Section 2.1 B.1 Lb,above, continuousmonitoring Thermal State Only the Permittee shall establish or confirm Oxidizer and 4- NCD-Q 1 NCD-Q2 Requirement the operating parameters specified in No Yes NA Compliance system. Stage Scrubber Section 2.1(13)(11)(h)and(13)(11)(i), testing was 03735T47-48 below. [15A NCAC 02Q.0308(a)]] conducted in Feb 2020. Monitoring Emissions of all PFAS,including 2.1(B)(1 1)(f)(i) GenX compounds from specified unit Thermal through(iv) operations shall be controlled by a NCD-Q 1 State Only Thermal Oxidizer and 4-Stage DCS and annual Stage Scrubber Oxidizer and 4- NCD-Q2 Requirement Scrubber System. Inspection and No Yes NA inspections. maintenance requirements are included 03735T47-48 in 2.1(13)(11)(f)(i)through 2.1(13)(11)(f)(v)• 15A NCAC 02 .0308 a In addition to annual inspections,the 2.1(13)(11)(f)(v) Permittee shall also conduct the Thermal State Only inspections required in paragraphs i. Oxidizer and 4- NCD-Q1 Requirement through iv.,above,whenever the No Yes NA DCS.. Stage Scrubber NCD-Q2 Thermal Oxidizer and 4-Stage 03735T47-48 Scrubber System are nonoperational for a minimum of 72 hours. [15A NCAC 02 .0308 a Air Quality Permit No. 03735T47 and 48 Page 47 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall develop,and submit to NC DAQ for approval,a site-specific monitoring plan that 2.1(B)(11)(g) addresses design,data collection,and DCS and SAP Thermal State Only QA/QC elements for operating each records.Plan NC Oxidizer and 4- NCD-Q1 Requirement CMS installed according to Section No Yes NA submitted Stage Scrubber NCD-Q2 2.1.(B)(11)(h)and(B)(11)(i),below. DAQ FROO on November 27, 03735T47-48 The plan shall address items 2.1(B)(11)(g)(i)through 2019. 2.1(13)(11)(g)(viii). 15A NCAC 02 .0308 a The Permittee shall install,calibrate, maintain,and operate CMS for the Thermal Oxidizer(NCD-Q 1).The CMS shall include a continuous 2.1(13)(11)(h) recorder capable of taking a Thermal State Only measurement at least once every 15 Oxidizer and 4- NCD-Q1 Requirement minutes.The Permittee shall operate No Yes NA DCS is the Stage Scrubber NCD-Q2 the CMS according to the approved CMS. 03735T47-48 site-specific monitoring plan specified in 2.1(B)(1 1)(g),above,to ensure the operational parameters in 2.1(13)(11)(h)(i)through 2.1(13)(11)(h)(iii)are maintained. 15A NCAC 02 0308 a Air Quality Permit No. 03735T47 and 48 Page 48 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall install,calibrate, maintain,and operate CMS for the 4- Stage Scrubber System(NCD-Q2). The CMS shall include a continuous 2.1(B)(1 1)(i) recorder capable of taking a Thermal State Only measurement at least once every 15 Oxidizer and 4- NCD-Q1 Requirement minutes.The Permittee shall operate No Yes NA DCS. Stage Scrubber NCD-Q2 the CMS according to the approved 03735T47-48 site-specific monitoring plan specified in Section 2.1(13)(11)(g),above,to ensure the operational parameters in 2.1(13)(11)(i)(i)through 2.1(B)(1 1)(i)(iii)are maintained. 15A NCAC 02 .0308 a Shutdown and Malfunction 2.1(B)(11)0) Except as specified in Section Thermal State Only 2.1(13)(11)(k),below,the Permittee Oxidizer and 4- NCD-Q1 Requirement shall operate the Thermal Oxidizer and No Yes NA DCS. Stage Scrubber NCD-Q2 4-Stage Scrubber System at all times 03735T47-48 When specified processes are operating. 15A NCAC 02 .0308 a Air Quality Permit No.03735T47 and 48 Page 49 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Prior to operation of the Thermal Oxidizer and 4-Stage Scrubber System,the Permittee shall develop and submit to NC DAQ for approval,a detailed shutdown and malfunction A Startup and plan for the Thermal Oxidizer and 4- Malfunction Stage Scrubber System that contains Plan was 2.1(B)(1 1)(k) specific procedures for initiating the submitted to NC Thermal State Only shutdown of process emission sources DAQ FRO on Oxidizer and 4- NCD-Q1 Requirement during periods of control device No Yes NA ?December 18, Stage Scrubber NCD-Q2 shutdown and malfunction,and a 2019 and a final 03735T47-48 program of corrective action for version was malfunctioning processes,and control submitted systems used to comply with limits in addressing DEQ Section 2.1(13)(11)(a),above.The comments on Permittee shall keep a copy of the March 13,2020. approved plan onsite and perform the information in 2.1(B)(1 1)(k)(i)through 2.1(B)(1 1)(k)(iii). 15A NCAC 02 .0308 a 2.1(13)(11)(1) Recordkeeping/Reporting Thermal State Only The Permittee shall record the NCD-Q 1 information in 2.1(B)(1 1)(1)(i)— Oxidizer and 4- 2 NCD- Requirement 2.1(13)(1.1 1 iv monthlyin a logbook No Yes NA DCS and SAP. Stage Scrubber Q )()( ) g 03735T47-48 (Written or electronic). 15A NCAC 02 .0308 a Air Quality Permit No.03735T47 and 48 Page 50 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall retain all results of performance testing conducted in accordance with 2.1 B(11)(b)and (B)(11)(c),above,including 2.1(13)(11)(m) development of operating parameters, Thermal State Only as specified in Section 2.1(13)(11)(h) Compliance Oxidizer and 4- NCD-Q 1 Requirement and(B)(11)(i)above,and the No NA NA testing was Stage Scrubber NCD-Q2 calculation of the Thermal Oxidizer conducted in 03735T47-48 and 4-Stage Scrubber System control Feb 2020. efficiency with respect to control of all PFAS,including GenX Compounds, from emission sources contained in 2.1(13)(11)(m). 15A NCAC 02 .0308 a 2.1(13)(11)(n) Thermal NCD-Q 1 State Only The Permittee shall keep all records on Records Oxidizer and 4- Requirement file for a minimum of five years. No Yes NA maintained Stage Scrubber NCD-Q2 [15A NCAC 02Q.0308(a)] onsite. 03735T47-48 Air Quality Permit No.03735T47 and 48 Page 51 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall submit a quarterly summary report,acceptable to the Regional Air Quality Supervisor,of monitoring and recordkeeping activities specified in Section 2.1(B)(1 1)(f)through(B)(11)(n), above,postmarked on or before 2.1(13)(11)(o) January 30 of each calendar year for Thermal State Only the preceding three-month period Quarterly Oxidizer and 4- NCD-Q1 Requirement between October and December;April No NA NA reports were Stage Scrubber NCD-Q2 30 of each calendar year for the submitted by the 03735T47-48 preceding three-month period between due dates.. January and March;July 30 of each calendar year for the preceding three- month period between April and June; and October 30 of each calendar year for the preceding three-month period between July and September. 15A NCAC 02 .0308 a Gaseous and mist emissions from the Polymer Processing Aid process shall Polymer 2.1(C)(1)(a) be controlled by a wet scrubber. The Processing Aid ACD-Al Permittee shall ensure the proper No Yes No DCS. Wet Scrubber 03735T47-48 Performance of the scrubber by monitoring the operational parameters in 2.1(C)(1)(a)(i)and 2.1(C)(1)(a)(ii) 15A NCAC 02D.1100 Recordkeeping The Permittee shall record the results Polymer ACD-Al 2.1(C)(1)(b) of inspections in a scrubber log,which Processing Aid shall be kept on site and made No Yes No SAP. Wet Scrubber 03735T47-48 available to the Division of Air Quality personnel upon request. 15A NCAC 02D.1100 Air Quality Permit No.03735T47 and 48 Page 52 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall not operate the wastewater treatment area without implementing management practices or Wastewater WTS-A, 2.1(D)(1)(a) installing odor control equipment Treatment WTS-B, sufficient to prevent odorous emissions No Yes NA Area records. WTS-C 03735T47-48 from the facility from causing or contributing to objectionable odors beyond the facility's boundary. 15A NCAC 02D.1806 Odorous emissions from the WTS-B, 2.1(13)(1)(b) wastewater treatment sludge dryers Wastewater WTS-C and shall be controlled by an impingement- No Yes Treatment type scrubber with caustic injection NA Area records. WTCD-1 03735T47-48 (WTCD-1). 15A NCAC 02D.1806 Monitoring and Recordkeeping To ensure that maximum efficiency of the scrubber is maintained,the Permittee shall perform periodic inspections and maintenance as recommended by the scrubber Inspection and 2.1(D)(1)(c) maintenance Wastewater WTS-A manufacturer.As a minimum,the No Yes NA records Treatment 03735T47-48 inspection and maintenance program maintained in shall include inspection of spray nozzles,packing material,chemical SAP. feed system(if so equipped),and the cleaning/calibration of all associated instrumentation. 15A NCAC 02D.1806 The Permittee shall record the results of inspections in a scrubber logbook Wastewater WTS-A 2.1(D)(1)(d) (written or electronic format)that shall No Yes NA Area Records. Treatment 03735T47-48 be kept on site and made available to NC DAQ personnel upon request. 15A NCAC 02D.1806 Air Quality Permit No. 03735T47 and 48 Page 53 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) Particulates from Fuel Burning Indirect Heat Exchangers Natural Emissions of particulate matter Gas/No.2 fuel 2.1(E)(1)(a) discharged into the atmosphere from A rental boiler was oil-fired PS-Temp the combustion of No.2 fuel oil in the NA NA NA NA not on-site in 2020. temporary 03735T47-48 temporary boiler shall not exceed boiler 0.2426 pounds per million Btu heat input. 15A NCAC 02D.0503 Natural If emissions testing is required,the Gas/No.2 fuel 2.1(E)(1)(b) testing shall be performed in A rental boiler was oil-fired PS-Temp accordance General Condition JJ. NA NA NA NA not on-site in 2020. temporary 03735T47-48 boiler [15A NCAC 02Q.0508(f)] Natural No monitoring/recordkeeping Gas/No.2 fuel 2.1(E)(1)(c) /reporting is required for particulate oil-fired PS-Temp emissions from the firing of fuel oil in NA NA NA NA A rental boiler was not on-site in 2020. temporary 03735T47-48 this source for this regulation. boiler 15A NCAC 0 02 .0508 Sulfur Dioxide Emissions from Combustion Sources Emissions of sulfur dioxide from the Natural temporary boiler shall not exceed 2.3 Gas/No.2 fuel 2.1(E)(2)(a) pounds per million Btu heat input. A rental boiler was oil-fired PS-Temp Sulfur dioxide formed by the NA NA NA NA not on-site in 2020 temporary 03735T47-48 combustion of sulfur in fuels,wastes, boiler ores,and other substances shall be included when determining compliance with this standard. 15A NCAC 02D.0516 Natural If emissions testing is required,the Gas/No.2 fuel 2.1(E)(2)(b) testing shall be performed in A rental boiler was oil-fired PS-Temp accordance with General Condition JJ. NA NA NA NA not on-site in 2020. temporary 03735T47-48 boiler [15A NCAC 02Q.0508(f)] Air Quality Permit No.03735T47 and 48 Page 54 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Natural No monitoring/recordkeeping is Gas/No.2 fuel 2.1(E)(2)(c) required for sulfur dioxide emissions A rental boiler was oil-fired PS-Temp from the firing of natural gas or fuel oil NA NA NA NA not on-site in 2020. temporary 03735T47-48 in this source. [15A NCAC 02Q boiler .0508 Control of Visible Emissions Visible emissions from the temporary boiler shall not be more than 20 Natural percent opacity when averaged over a Gas/No.2 fuel 2.1(E)(3)(a) six-minute period. However,six- oil-fired PS-Temp minute averaging periods may exceed NA NA NA NA A rental boiler was temporary 03735T47-48 20 percent not more than once in any not on-site in 2020. boiler hour and not more than four times in any 24-hour period. In no event shall the six-minute average exceed 87 percent opacity. 15A NCAC 02D.0521 Natural If emissions testing is required,the Emissions Gas/No.2 fuel 2.1(E)(3)(b) testing shall be performed in testing was not A rental boiler was oil-fired PS-Temp NA NA NA temporary 03735T47-48 accordance with General Condition JJ. required for this not on-site in 2020. boiler [15A NCAC 02Q.0508(f)] source in 2020. Natural No Gas/No.2 fuel 2.1(E)(3)(c) monitoring/recordkeeping/reporting is required for visible emissions from the NA NA NA NA A rental boiler was temporary 0373 ST47-48 oil-fired PS-Temp firing of natural gas or fuel oil in this not on-site in 2020. boiler source. 15A NCAC 02 .0508 1 Air Quality Permit No.03735T47 and 48 Page 55 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Prevention of Significant Deterioration In order to avoid applicability of 15A Natural NCAC 02D.0530(g)for major sources Gas/No.2 fuel 2.1(E)(4)(a) and major modifications,the A rental boiler was oil-fired PS-Temp temporary boiler shall discharge into NA NA NA NA not on-site in 2020. temporary 03735T47-48 the atmosphere less 40 tons of sulfur boiler dioxide per consecutive twelve-month period. 15A NCAC 02 .0317 Natural Gas/No.2 fuel 2.1(E)(4)(b) If emissions testing is required,the testing shall be performed in A rental boiler was oil-fired PS-Temp accordance with General Condition JJ. NA NA NA NA not on-site in 2020. temporary 03735T47-48 [15A NCAC 02Q.0508(f)] boiler Natural The Permittee shall keep monthly Gas/No.2 fuel 2.1(E)(4)(c) records of fuel usage in a logbook oil-fired PS-Temp (written or in electronic format),as NA NA NA NA A rental boiler was temporary 03735T47-48 specified in 2.1(E)(4)(c)(i)and not on-site in 2020. 2.1(E)(4)(c)(ii). boiler 15A NCAC 02 .0508 The Permittee shall calculate monthly and 12-month rolling S02 emissions Natural from the temporary boiler within 30 Gas/No.2 fuel 2.1E 4 d days after the end of each calendar ( �( �( � month. Calculations shall be recorded A rental boiler was oil-fired PS-Temp in a logbook(written or electronic NA NA NA NA not on-site in 2020. temporary 03735T47-48 format),according to formulas boiler specified in 2.1(E)(4)(d)(i)and 2.1(E)(4)(d)(ii). 15A NCAC 02 .0317 I Air Quality Permit No.03735T47 and 48 Page 56 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall submit a semi- annual summary report,acceptable to the Regional Air Quality Supervisor, of monitoring and recordkeeping activities postmarked on or before Natural January 30 of each calendar year for Gas/No.2 fuel 2.1(E)(4)(e) the preceding six-month period A rental boiler was oil-fired PS-Temp between July and December,and July NA NA NA NA not on-site in 2020. temporary 03735T47-48 30 of each calendar year for the boiler preceding six-month period between January and June. The report shall contain the information specified in 2.1(E)(4)(e)(i)through 2.1(E)(4)(e)(iii). 15A NCAC 02 .0508 Avoidance Condition—Case-by-Case MACT for Boilers Natural Prior to May 20,2019,in order to Gas/No.2 fuel 2.1(E)(5)(a) avoid the applicability of 15A NCAC 02D.1109,the temporary boiler shall A rental boiler was oil-fired PS-Temp not remain on site for more than 180 NA NA NA NA not on-site in 2020. temporary 03735T47-48 consecutive days.The Permittee shall boiler retain records of the number of consecutive days the boiler is onsite. 15A NCAC 02 .0317 Natural If this boiler remains on site for longer Gas/No.2 fuel 2.1(E)(5)(b) than 180 consecutive days,the oil-fired PS-Temp Permittee shall notify the Regional NA NA NA NA A rental boiler was temporary 03735T47-48 Office in writing within ten days of not on-site in 2020. boiler exceeding the 180-day period. 15A NCAC 02 .0317 Natural The Permittee shall submit a startup Gas/No.2 fuel 2.1(E)(5)(c) notification to the Fayetteville A rental boiler was oil-fired PS-Temp Regional Office within 15 days of No NA NA NA not on-site in 2020. temporary 03735T47-48 startup of the temporary boiler. boiler 15A NCAC 02 .0317 Air Quality Permit No.03735T47 and 48 Page 57 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Particulates from Miscellaneous Industrial Processes Production Lime Silo and NS-R1 2.1(F)(1)(a) Emissions of particulate matter from records System started up the Lime Silo and Lime Slaker shall No Yes NA on January 2, Slaker NS-R2 03735T47-48 not exceed an allowable emission rate, maintained on 2020. per the calculation in 2.1(F)(1)(a). site. 15A NCAC 02D.0515 Testing 2.1(F)(1)(b) If emissions testing is required,the Testing was not Lime Silo and NS-R1 System started up Slaker NS-R2 testing shall be performed in NA NA NA required in on 1/4/20. 03735T47-48 accordance with General Condition JJ. 2020. 15A NCAC 02 .0508 Wet scrubber liquid flow rate was less than flow rate in permit Monitoring and Recordkeeping 03735T47. A Particulate emissions from the Lime permit revision 2.1(F)(1)(c) Slaker shall be controlled by the Wet Yes-under (0s w was issued System started up Lime Slaker NS-R2 Particulate Scrubber(NCD-R2)and permit Yes Yes issued wit ith the on January 4, 03735T47-48 the Permittee shall comply with 03735T47. correct flow 2020. requirements detailed in 2.1(F)(1)(c). rate.Approval [15A NCAC 02Q.0508(f)] for operating under the revised scrubber flow rate was provided by DAQ on Apr 23,2020 Air Quality Permit No.03735T47 and 48 Page 58 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) While scrubber flow rate was below specified flow,the scrubber was operating as If the scrubber liquid flow rate designed. The readings recorded as required,are vendor observed to be below the minimum information that 2.1(17)(1)(d) was submitted S started u rate specified in Section 2.1(F)(1)(c), y p Lime Slaker NS-R2 No Yes NA with permit System 03735T47-48 above,the Permittee shall inspect the application was 01/04/20. scrubber(s)for malfunctions and clean not the vendor or repair,as necessary. [15A NCAC 02Q.0508(f)] that was selected which changed the monitoring parameters. This was corrected in Permit 03735T48. Particulate matter emissions from the Lime Silo shall be controlled by the bagfilter(NSD-RI). The Permittee shall perform inspections and Required structural maintenance as recommended by the manufacturer.In addition to the integrity 2.1(F)(1)(e) manufacturer's inspection and inspections were Lime Silo NS-Rl maintenance recommendations,or if No Yes NA completed System started up monthly and the January 4,2020. 03735T47-48 there are no manufacturer's inspection and maintenance recommendations,as annual internal a minimum,the inspection and inspection was maintenance requirement shall include completed in October 2020. the information contained in 2.1(F)(1)(e)(i)and 2.1(F)(1)(e)(ii). 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 59 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The results of inspection and maintenance activities in Section 2.1(F)(1)(c)through 2.1(F)(1)(e), above,shall be maintained in a Inspection and 2.1(F)(l)(f) logbook(written or electronic format) maintenance Lime Silo and NS-R1 System started up Slaker NS-R2 on site and made available to an No Yes NA records January 4,2020. 03735T47-48 authorized representative of DAQ maintained in upon request.Containing the SAP. information in 2.1(F)(1)(f)(i)through 2.1(17)(1)(f)(iv). 15A NCAC 02 .0508 Reporting 2.1(F)(1)(g) The Permittee shall submit the results Lime Silo and NS-RI of any maintenance performed on any NA NA NA NA There were no Slaker NS-R2 control device within 30 days of a DAQ requests. 03735T47-48 written request by DAQ. 15A NCAC 02 .0508 The Permittee shall submit a summary report of the monitoring and recordkeeping activities specified in Section 2.1(F)(1)(c)through(F)(1)(f), above,postmarked on or before 2.1(F)(1)(h) Semiannual Lime Silo and NS-RI January 30 of each calendar year for No Yes NA report submitted System started up Slaker NS-R2 03735T47-48 the preceding six-month period by the due dates. January 4,2020. between July and December and July 30 of each calendar year for the preceding six-month period between January and June. 15A NCAC 02 .0508 Air Quality Permit No.03735T47 and 48 Page 60 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Control of Visible Emissions Visible emissions from the Lime Silo and Lime Slaker shall not be more than 20 percent opacity when averaged over a six-minute period.However,six- Lime Silo and NS-R1 2.1(F)(2)(a) minute averaging periods may exceed Records System started up No Yes NA maintained on Slaker NS-R2 03735T47-48 20 percent not more than once in any site. January 4,2020. hour and not more than four times in any 24-hour period.In no even shall the six-minute average exceed 87 percent opacity. 15A NCAC 02D.0521 Testing 2.1(F)(2)(b) If emissions testing is required,the Emissions Lime Silo and NS-R1 testing was not System started up testing shall be performed in NA NA NA Slaker NS-R2 03735T47-48 accordance with General Condition JJ. required in this January 4,2020. 15A NCAC 02 .0508(f)] reporting year. Monitoring To ensure compliance,once a week the Permittee shall observe the emission points of the Lime Silo and Lime Slaker for any visible emissions above normal.The weekly observation must Weekly visible be made for each week of the calendar emissions Lime Silo and NS-R1 2.1(F)(2)(c) year period to ensure compliance with No Yes NA observations System started up Slaker NS-R2 03735T47-48 this requirement.The Permittee shall were made and January 4,2020. establish"normal"for the Lime Slaker documented in in the first 30 days following the 2020. beginning operation.The Permittee must follow the guidelines in 2.1(17)(2)(c)(i)and 2.1(F)(2)(c)(ii)in order to comply. 15A NCAC 02 .0508 i Air Quality Permit No.03735T47 and 48 Page 61 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Recordkeeping The results of the monitoring shall be maintained in a logbook(written or 2.1(F)(2)(d) electronic format)on-site and made Lime Silo and NS-R1 Records are System started up Slaker NS-R2 available to an authorized No Yes NA available on site. January 4,2020. 03735T47-48 representative upon request containing the information in 2.1(F)(2)(d)(i) through 2.1(F)(2)(d)(iii). [I 5A NCAC 02 .0508 Reporting The Permittee shall submit a summary report of the monitoring activities specified in Section 2.1(17)(2)(c)and (d),above,postmarked on or before 2.1(F)(2)(e) Semiannual Lime Silo and NS-Rl January 30 of each calendar year for System started up No Yes NA report submitted Slaker NS-R2 03735T47-48 the preceding six-month period in by due dates. January 4,2020. between July and December and July 30 of each calendar year for the preceding six-month period between January and June. [I 5A NCAC 02 .0508 Prevention of Significant Deterioration In order to avoid applicability of 15A PS-A NCAC 02D.0530(g)for major sources Monthly PSD Boiler not been PS- has Natural gas/ 2.2(A)(1)(a) n PS-B and modifications,the affected boilers Avoidance No.2 fuel oil- No Yes NA constructed.A PS-C shall discharge into the atmosphere Report fired boilers PS-Temp 03735T47-48 less than 702.5 tons of SOz per maintained. rental boiler was not on-site in 2020. consecutive 12-month period. 15A NCAC 02 .0317 PS-A If emissions testing is required,the Emissions Boiler PS-C has Natural gas/ 2.2(A)(1)(b) testing was not not been PS-B Permittee shall perform such testing in No.2 fuel oil- PS-C accordance with General Condition JJ. No NA NA required for constructed.A fired boilers PS-Temp 03735T47-48 [15A NCAC 02Q.0508(f)] these sources in rental boiler was 2020. not on-site in 2020. Air Quality Permit No.03735T47 and 48 Page 62 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Fuel The Permittee shall keep monthly Consumption PS-A records of fuel usage in a logbook Records and Boiler PS-C has Natural gas/ 2.2(A)(1)(c) Certificates of not been No.2 fuel oil- PS-B (written or in electronic format),as No Yes NA Analysis from constructed.A PS-C specified in 2.2(A)(1)(c)(i)through fired boilers PS-Temp 03735T47-48 2.2(A)(1)(c)(iii). Oil Supplier. rental boiler was [15A NCAC 02Q.0508(f)] Fuel oil was not not on-site in 2020. combusted in 2020. The Permittee shall calculate monthly and 12-month rolling S02 emissions from the affected boilers within 30 Boiler PS-C has Avoidance Natural gas/ PS-A 2.2(A)(1)(d) days after the end of each calendar Monthly Avoidance not been No.2 fuel oil- PS-B month. Calculations shall be recorded No Yes NA constructed.A fired boilers Pe maintained 03735T47-48 in a log(written or electronic format) Report rental boiler was PS-Temp according to the formulas specified in . not on-site in 2020. 2.2(A)(1)(d)(i)and 2.2(A)(1)(d)(ii). 15A NCAC 02 .0317 The Permittee shall submit a semi- annual summary report,acceptable to the Regional Air Quality Supervisor, of monitoring and recordkeeping activities postmarked on or before PS-A January 30 of each calendar year for Semi-annual Boiler PS-C has Natural gas/ PS-B 2.2(A)(1)(e) the preceding six-month period reports sent to not been No.2 fuel oil- PS-C between July and December,and July No Yes NA the NC DAQ constructed.A fired boilers 03735T47-48 30 of each calendar year for the FRO by the due rental boiler was PS-Temp preceding six-month period between dates. not on-site in 2020. January and June. The report shall contain the information specified in 2.2(A)(1)(e)(i)through 2.2(A)(1)(e)(iii). 15A NCAC 02 .0508 Air Quality Permit No.03 73 5T47 and 48 Page 63 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Toxic Air Pollutant Emissions 2.2(B)(1)(a) Limitations and Requirements State Pursuant to 15A NCAC 02D.1100 and Enforceable in accordance with the approved All Sources All Sources Only application for an air toxic compliance No Yes NA Site records demonstration,the permit limits in the 03735T47-48 table under 2.1(13)(1)(a)shall not be exceeded. 15A NCAC 02D.1100 Recordkeeping For compliance purposes,the Permittee shall maintain records of production rates,throughput,material usage,periods of excess emissions, 2.2(B)(1)(b) failure of air pollution control State equipment to operate in a normal and Enforceable usual manner,and other process All Sources All Sources Only operational information,that allows for No Yes NA Site records. evaluation for compliance with the 03735T47-48 toxic air pollutant limits.These records shall be retained for a minimum of three years from the date of recording, and access to these records shall be provided to the Division of Air Quality staff upon request. 15A NCAC 02D.1100 Reporting 2.2(B)(1)(c) For compliance purposes,within thirty State (30)days after each calendar year TAP reports All Sources All Sources Enforceable quarter the information contained in No Yes NA submitted Only 2.1(13)(1)(c)(i)through 2.1(13)(1)(c)(iv) quarterly to the shall be reported to the Regional NCDAQ FRO. 03735T47-48 Supervisor,Division of Air Quality. 15A NCAC 02D.1100 Air Quality Permit No.03735T47 and 48 Page 64 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) 2.2(B)(2)(a) Toxic Air Pollutant Emissions State Limitations and Requirements Primary NEP-Hdr-1 Enforceable Pursuant to 15A NCAC 02D.1100, This condition is Operating NEP-Hdr-2 emissions of hydrogen fluoride from No Yes NA Site records. no longer Scenario AEP-Al Only these sources shall not exceed 7.28 applicable. 03735T47-48 lb/hr or 52.45 lb/day. 15A NCAC 02D.1100 2.2(13)(2)(a) Pursuant to 15A NCAC 02D.1100, Alternative NEP-Hdr-1 State emissions of hydrogen fluoride from Operating NEP-Q2 Enforceable these sources shall not exceed 7.28 No Yes NA Site records. Scenario AEP-Al Only lb/hr or 52.45 lb/day. 03735T47-48 [15A NCAC 02D.1100] 2.2(B)(2)(a) pursuant to 15A NCAC 02D.1100, Primary State emissions of hydrogen fluoride these Operating and All other Enforceable sources shall not exceed 2.7 lb/hr or No Yes NA Site records. Alternative sources Only 19.41b/day. Scenario 03735T47-48 [15A NCAC 02D.1100] 2.2(B)(2)(b)(i) Monitoring State POS:Ensure proper performance of AOS was in place Primary NCD-Hdr-1 Enforceable the Baffle Plate-Type Tower Scrubbers for all of 2020. Operating by monitoring the injection liquid flow NA NA NA NA This condition is Scenario NCD-Hdr-2 Only rate(minimum of 7,000 kg/hr, no longer 03735T47-48 averaged over 3-hours) applicable. 15A NCAC 02D.1100 2.2(B)(2)(b)(ii) AOS:Ensure the proper performance State of the Thermal Oxidizer and 4-Stage Alternative AOS started NCD-Q 1 Enforceable Scrubber System by complying with Operating NCD-Q2 Only the requirements specified in Section No Yes NA IP-21 December 31, Scenario 2019. 2.1(B)(11). 03735T47-48 15A NCAC 02D.1100 Air Quality Permit No. 03735T47 and 48 Page 65 of 81 I� TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Recordkeeping 2.2(B)(2)(c)(i) POS:Record the results of inspections AOS was in place State of the Baffle Plate-Type Tower Primary for all of 2020. Enforceable Scrubbers in a logbook(written or Operating Hdr-1 NA NA NA NA This condition is Scenario Hdr-2 Only electronic records)that shall be kept on no longer site and made available to the Division 03735T47-48 of Air Quality personnel upon request. applicable. 15A NCAC 02D.1100 2.2(B)(2)(c)(ii) AOS:Record the results of inspections Alternative State Enforceable of the Thermal Oxidizer and 4-Stage AOS started NCD-Q 1 Enforc Operating NCD-Q 2 orc Y Scrubber System as specified in No Yes NA SAP. December 31, Scenario 2.1(B)(11),above. 2019 03735T47-48 [15A NCAC 02D.1100] Any variance from the manufacturer's recommendations or the permit monitoring requirements,or the failure of the air pollution control equipment 2.2(B)(2)(c)(iii) to operate in a normal and usual Primary and Hdr-1 State manner,shall be investigated with Alternative Hdr-2 Enforceable corrections made and dates of action No Yes NA Site records. Operating NCD-Q l Only recorded in the log book.The Scenarios NCD-Q2 inspection and maintenance activities. 03735T47-48 as well as required monitoring for scrubbing liquid flow rates,and scrubber pressure drops,if appropriate, shall be recorded. 15A NCAC 02D.1100 Air Quality Permit No.03735T47 and 48 Page 66 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall maintain records of production rates,throughput, material usage,periods of excess emissions,failure of air pollution control equipment to operate in a 2.2(13)(2)(d) normal and usual manner,and other Primary and State process operational information,that Alternative Enforceable allows for evaluation for compliance Operating All sources Only with the toxic air pollutants specified No Yes NA Site records. Scenario in 2.2(B)(2)(a),above.These records 03735T47-48 shall be retained for a minimum of three years from the date of recording, and access to these records shall be provided to the Division of Air Quality staff upon request. 15A NCAC 02D.1100 Reporting 2.2(13)(2)(e) For compliance purposes,within thirty Primary and State (30)days after each calendar year TAP reports Alternative Enforceable quarter the information contained in submitted Operating All sources Only 2.2(B)(2)(e)(i)through 2.2(B)(2)(e)(iii) No Yes NA quarterly to the Scenario shall be reported to the Regional NCDAQ FRO by the due dates. 03735T47-48 Supervisor,Division of Air Quality. 15A NCAC 02D.1100 Risk Management Programs The Permittee is subject to Section The five-year Accidental 2.2(B)(3)(a) 112(r)of the Clean Air Act and shall o es RMP update All N Y NA was submitted to sources Release 03735T47-48 comply with all applicable EPA on July 24, requirements in 40 CFR Part 68. 2019. 40 CFR Part 68 Air Quality Permit No. 03735T47 and 48 Page 67 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Device ID Condition Condition (Yes/No) (Yes/No/ Compliance Compliance Comments Description No.(s) Number Summary NA) Issue? Status (Yes/No) Recordkeeping/Reporting The Permittee submitted a Risk The five-year Accidental 2.2(B)(3)(b) Management Plan(RMP)to EPA RMP update Release All sources pursuant to 40 CFR 68.150 on August NA NA NA submitted to 03735T47-48 18,2014. EPA on July 24, [40 CFR Part 68 and 15A NCAC 02Q 2019. .0508 The Permittee shall revise and update the RMP submitted under 40 CFR 68.150 by August 31,2019,and at The five-year Accidental 2.2(B)(3)(c) least once every five years after that RMP update Next submission Release All sources date or most recent update required by No Yes NA submitted to due August 31, 03735T47-48 40 CFR 68.1890(b)(2)through(b)(7), EPA on July 24, 2024. whichever is later. 2019. [40 CFR Part 68.190(b)(2)through b 7 Control of Emissions from Abrasive Blasting The Permittee shall ensure that any abrasive blasting operation conducted outside a building or conducted 2.2(B)(4)(a) indoors and vented to the atmosphere Outdoor State is performed in accordance with the Abrasive Abrasive Enforceable requirements set forth in 15A NCAC Blasting Blasting and Only 02D.0521,Control of Visible No NA NA NA I-08 Emissions.Any visible emissions 03735T47-48 reading for abrasive blasting performed outside a building shall be taken at a spot approximately one meter above the point of abrasive blasting with a viewing distance of approximately five meters. 15A NCAC 02D.0541 Air Quality Permit No.03735T47 and 48 Page 68 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Abrasive Outdoor 2.2(B)(4)(b) All abrasive blasting operations shall Blasting Abrasive State be conducted within a building except Blasting and Enforceable as provided in 2.2(B)(4)(b)(i)and No NA NA NA I-08 Only 2.2(B)(4)(b)(ii). 03735T47-48 [15A NCAC 02D.0541] Any abrasive operation conducted outside a building,as provided in Section 2.2(B)(3)(b)(i)or(ii),above, 2.2(B)(4)(c) shall take appropriate measures to Outdoor State ensure that the fugitive dust emissions Abrasive Abrasive Enforceable created by the abrasive blasting Blasting Blasting and Only operation do not migrate beyond the No NA NA NA I-08 property boundaries in which the 03735T47-48 abrasive blasting operation is being conducted.Appropriate measures to be taken are included in 2.2(B)(4)(c)(i) through 2.2(B)(4)(c)(vi). 15A NCAC 02D.0541 Control and Prohibition of Odorous Emissions 2 2(B)(5) The Permittee shall not operate the facility without implementing State WWTP has odor Odorous Odorous management practices or installing and Enforceable control technology Emission Emission Only operating odor control equipment No NA NA NA that is addressed Sources Sources sufficient to prevent odorous emissions elsewhere. 03735T47-48 from the facility from causing or contributing to objectionable odors beyond the facility's boundary. 15A NCAC 02D.1806 Air Quality Permit No.03735T47 and 48 Page 69 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Option for Obtaining Construction and Operation Permit As required under 15A NCAC 02Q .0501(b)(2),the Permittee shall have Thermal one year from the date of beginning Chemours Oxidizer/Scrub NCD-Q 1 2.2(C)(1)(a) normal operation of the Thermal submitted the ber System, NCD-Q2 Oxidizer(ID No.NCD-Q1),the 4- No Yes NA required NS-R1 Stage Caustic Scrubber(1D No.NCD- application on Lime Slaker Lime Silo and NS-R2 03735T47-48 Q2),the Lime Silo(ID No.NS-R1),or November 11, the Lime Slaker(ID No.NS-R2), 2020. whichever is first,to file an amended application following the procedures of Section 15A NCAC 02Q.0504. 15A NCAC 02 .0504 d The NC DAQ FRO was Reporting notified on December 31, The Permittee shall notify the Regional Dece ece that the Thermal Office,in writing,of the date of 2019 The Lime Silo and NCD-Q 1 TO System Oxidizer/Scrub NCD-Q2 2.2(C)(1)(b) beginning normal operation of the bean normal Lime Slaker g ber System, Thermal Oxidizer(ID No.NCD-Q1), No Yes NA started normal Lime Silo and NS-R1 03735T47-48 the 4-Stage Caustic Scubber(ID No. operation.The operations January Lime Slaker NS-R2 NCD-Q2),the Lime Silo(ID No.NS- Lime Slaker and 412020. R1),or the Lime Slaker(ID No.NS- Lime Silo �I R2),postmarked no later than 30 days notification was after such date. [15A NCAC 02Q submitted 0508(f)] January 24, 2020. Air Quality Permit No. 03 73 5T47 and 48 Page 70 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) (i)Permittee shall demonstrate compliance with the GenX Compounds emission limit of 23.027 pounds per year by calculating annual emissions each calendar month for the previous 12 months. (ii)The Permittee shall reduce emissions of GenX compounds by 99.99 percent of specified unit operations emissions by installing, 2.2(1))(1)(a)(i) operating and maintaining a Thermal Oxidizer and 4-Stage Scrubber -(ite System,as required in Section Facility State y q Records Semiworks/VE 2.1(13)(11),above. Lab carbon Facility Wide Wide Enforceable No Yes NA maintained adsorber did not Only ui The Permittee shall install, onsite start up in 2020. 03735T47-48 operate,and maintain Carbon Adsrobers as specified in Section 2.2(D)(1)(b)through(g)below to reduce emissions of GenX compounds from the following sources: (A)VEN Indoor Fugitives (B)VES Indoor Fugitives Semiworks Polymerization,Lab Hood and VE Lab Hood and Chemical Storage. [15A NCAC 02Q.0519(a)(7)and Consent Order] i Air Quality Permit No.03735T47 and 48 Page 71 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) (iv) The Permittee shall reduce emissions of GenX Compounds from process 2.2(D)(1)(a)(iv) equipment by complying with the enhanced -(v) LDAR program as specified in Section Facility State 2.2(D)(1)(h),below. Semiworks/VE Facility Wide Wide Enforceable No Yes NA On site records. Lab carbon (v)The Permittee shall comply with the adsorber did not Only recordkeeping and reporting requirements startup in 2020. specified in Section 2.2(13)(1)(i)through 03735T47-48 (m),below. [15A NCAC 02Q.0519(a)(7)and Consent Order Testing—Carbon Adsorbers The Permittee shall conduct performance tests for GenX compounds emissions from each Carbon Adsorber(ID Nos.ACD-A2, Emission testing was NCD-Q3,NCD-Q4,and SCD-SW 1)in 2.2(D)(1)(b) conducted in ACD-A2 State accordance with General Condition JJ accordance with The Semiworks Carbon NCD-Q3 Enforceable and in accordance with a testing General Carbon Adsorber protocol approved by NC DAQ at least No Yes NA Adsorbers NCD-Q4 Only Condition JJ. was not in service SCD-SW 1 45 days prior to conducting the Reports were in 2020. 03735T47-48 Performance test.During each submitted within performance test,the Permittee shall collect production data and hours of 45 days . each test. operation. Two copies of the final air emission test report shall be submitted to the Director not later than 45 days after each performance test. [I 5A NCAC 02 .03 08 a Air Quality Permit No.03735T47 and 48 Page 72 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Source Control Permit and Condition Deviation? Maintained? Non- Determining Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall conduct an initial performance test on the VE-South Indoor Fugitives Carbon Adsorber(ID No.NCD-Q4)no later than July 12, 2020. The Permittee shall conduct an initial performance test on the Semiworks Carbon Adsorber(ID No. SCD-SW1)no later than 60 days after startup of normal operations of the absorber system. The Permittee also conduct performance tests to develop carbon replacement schedules for each carbon adsorber. The replacement schedule shall be approved by DAQ The initial and shall be based on hours of 2.2(D)(1)(c) performance test operation,production rate,or another State for the VE- The Semiworks approved parameter. Once the carbon Carbon NCD-Q4 Enforceable South Carbon Carbon Adsorber replacement schedule has been No Yes NA Adsorbers SCD-SW 1 Only Adsorber was was not in service approved,the Permittee shall conduct conducted in in 2020. 03735T47-48 periodic performance tests within a 13- February of month time period after the date of the 2020. previous performance test. The Permittee shall conduct additional performance tests to reestablish the carbon replacement schedule no later than 90 days after permanent changes are made in production capacity, process feedstock type,or whenever there is a replacement,removal,or addition of an emission source or control device.After the revised replacement schedule is approved,the Permittee shall resume annual performance testing. 15A NCAC 02 .0308 a Air Quality Permit No.03735T47 and 48 Page 73 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Beginning May 13,2019,the Permittee shall determine,or reestablish if necessary,the carbon replacement schedule for the Polymer 2.2(13)(1)(c)(i- Processing Aid Process and VE-North Quarterly testing Indoor Fugitives on a quarterly basis. of the VE- ACD-A2 iii)State ii.The Permittee shall determine,or North VE- Semiworks Carbon Carbon NCD-Q3 reestablish if necessary,the carbon South and PPA Enforceable No Yes NA Adsorber was not Adsorbers NCD-Q4 replacement schedule for VE-South Carbon SCD-SW1 Only Indoor Fugitives Carbon Adsorber(ID Adsorbers was in service in 2020. 03735T47-48 No.NCD-Q4)on a quarterly basis. Iii. conducted in The Permittee shall determine the 2020. carbon replacement schedule for the Semiworks Carbon Adsorber(ID-No. SCD-SW1)on an annual basis. 15A NCAC 02 .0308 a Air Quality Permit No.03735T47 and 48 Page 74 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Inspections—Carbon Adsorbers Emissions of GenX Compounds from Polymer Processing Aid,VE-North Indoor Fugitives,VE-South Indoor Fugitives,and Semiworks Polymerization Operation,Semiworks Laboratory Hood and VE Research Laboratory Hood and Chemical Annual 2.2(D)(1)(d) Storage Cabinet shall be controlled by inspections were Carbon Adsorbers. To ensure ACD-A2 State compliance,the Permittee shall conducted in Semiworks Carbon Carbon NCD-Q3 Enforceable June 2020 for perform annual inspections and No Yes NA VE-South and Adsorber was not SCD-SW1 October 2020 Adsorbers NCD-Q4 Only maintenance as recommended by the in service in 2020. manufacturer.In addition to the 03735T47-48 for the other manufacturer's inspection and emission units. maintenance recommendations,or if there are no manufacturer's inspection and maintenance recommendations,as a minimum,the annual inspection and maintenance shall include the information specified in 2.2(1))(1)(d)(i) and 2.2(D)(1)(d)(ii) 15A NCAC 02 .03 08 a Shutdown and Malfunction—Carbon Adsorbers 2.2(D)(1)(e) Except as specified in Section ACD-A2 State 2.2(D)(1)(g),below,the Permittee Semiworks Carbon Carbon NCD-Q3 Enforceable shall operate the Carbon Adsorbers at No Yes NA IP-21 Ad was not Adsorbers NCD-Q4 Only all times when the PPA Process,NE- . SCD-SW1 North,VE-South and Semiworks in seervicervice in 2020. 03735T47-48 Process or VE Laboratory Processes are operating. 15A NCAC 02 .03 08 a Air Quality Permit No.03735T47 and 48 Page 75 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The PPA Adsorber system shall be equipped with a differential pressure monitor on the primary blower and the scrubber blower. The VE North Indoor Fugitives Carbon Adsorber system shall be equipped with a differential pressure monitor on the blower and the tower.The VE-South Indoor Fugitives Carbon Adsorber and Semiworks Carbon Adsorber systems shall be equipped with a differential 2.2(D)(1)(f) pressure monitor on the blower and an IP-21 and alarm on the exhaust blower to indicate State Shutdown and Carbon ACD-A2 Enforceable whether the blower is running. Each Malfunction Semiworks Carbon Adsorbers NCD-Q3 Only monitor shall trigger an alarm in the No Yes NA plans have been Adsorber was not control room when the differential submitted to NC in service in 2020. 03735T47-48 pressure indicates improper operation DAQ. of the carbon bed blower.The Permittee shall develop and submit to NC DAQ for approval a site-specific monitoring plan that addresses design, data collection,and QA/QC elements for operating each CMS installed on the carbon adsorbers.The monitoring plan shall include,at a minimum, address the information contained in 2.2(D)(1)(f)(i)through 2.2(D)(1)(f)(viii). 15A NCAC 02 .0308 a Air Quality Permit No.03735T47 and 48 Page 76 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) No later than April 13,2019,the Permittee shall develop and submit to DAQ for approval,a detailed shutdown and malfunction plan for the PPA and VEN Indoor Fugitive Carbon Adsorbers that contains specific procedures for initiating the shutdown of process emission sources during The Shutdown periods of control device shutdown and Malfunction and malfunction,and a program of corrective action for malfunctioning plans for VE- ACD-A2 South and Carbon NCD-Q3 2.2(D)(1)(g) processes and control systems used to Semiworks Semiworks Carbon Adsorbers NCD-Q4 comply with the limits in Section No Yes NA Carbon Adsorber was not SCD-SW1 03735T47-48 2.2(13)(1)(a),above.No later than June Adsorbers were in service in 2020. 12,2020,the Permittee shall update, and submit to DAQ for approval,the submitted prior detailed shutdown and malfunction to September 2020. plan to include the VE-South Indoor Fugitives and Semiworks Carbon Adsorbers.The Permittee shall keep a copy of the approved plan onsite and, at a minimum,contain the information in 2.2(1))(1)(g)(i)through 2.2(D)(1)(g)(iv). I5A NCAC 02 .03 08 a Air Quality Permit No. 03 73 5T47 and 48 Page 77 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Inspection and Monitoring—Enhanced LDAR No later than May 13,2019,the Permittee shall develop,and submit to NC DAQ for approval,an enhanced An Enhanced leak detection and repair program. The Leak Detection Applicable 2.2(D)(1)(h) Condition has been Applicable LDAR Permittee shall conduct inspections No Yes NA and Repair met and is no LDAR sources Sources 03 73 5T47-48 and monitor to detect leaks from Program was longer applicable. equipment identified in the approved submitted May program and shall address the 8,2019. information contained in 2.2(13)(1)(h)(i)through 2.2(13)(1)(h)(vi). 15A NCAC 02 .0308 a Compliance Demonstration The Permittee shall demonstrate initial compliance with the emission Emissions calculations limitation specified in 2.2(D)(1)(a), 2.2(D)(1)(i) above by submitting a report to NC conducted Facility Wide Facility DAQ by February 28,2021. The NA Yes NA monthly in Wide 2020.The first 03735T47-48 report shall include information in 2.2(D)(1)(i)and 2.2(D)(1)(ii)for the report r due 12-month period beginning December February 28, 31,2019. 2021. 15A NCAC 02 .0308 a Air Quality Permit No.03735T47 and 48 Page 78 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) After the initial compliance report specified in Section 2.2(D)(1)(i), above,the Permittee shall demonstrate continuous compliance with the emissions limitation in 2.2(1))(1)(a), above,by submitting quarterly reports Quarterly reports 2.2(D)(1)0) summarizing the information specified Facility First report due thereafter—July, Facility Wide in Section 2.2(D)(1)(i) above.The NA NA NA Wide Apri130,2021. Oct,Jan and April 03735T47-48 continuous compliance reports shall be of each year. submitted in accordance with the schedule specified in Section 2.2(D)(1)(m),below,and the first report shall be postmarked on or before April 30,2021. 15A NCAC 02 .0308 a Recordkeeping The Permittee shall record the following information monthly in a 2.2(D)(1)(k) logbook(written or electronic format) Facility containing the information in Facility Wide Wide 2.2(D)(1)(k)(i)through No Yes NA IP-21 and SAP. 03735T47-48 2 2(D)(1)(k)(vi),that shall be maintained on-site and made available to NC DAQ,upon request. 15A NCAC 02 .03 08 a The Permittee must keep each entry in the log and all required records on file for a minimum of five years.In Facility 2.2(13)(1)(1) addition to the records identified in Facility Wide Wide Section 2.2(D)(1)(k),above,the No Yes NA IP-21 and SAP. 03735T47-48 Permittee shall also keep the records specified in 2.2(D)(1)(1)(i)through 2.2(D)(1)(1)(iii). 15A NCAC 02 .03 08 a Air Quality Permit No. 03735T47 and 48 Page 79 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Reports The Permittee shall submit a quarterly summary report,acceptable to the Regional Air Quality Supervisor,of monitoring and recordkeeping activities specified in Section 2.2(D)(1),above,postmarked on or before January 30 of each calendar year for the preceding three-month period between January and March; Reports were Facility 2.2(D)(1)(m) submitted July 30 of each calendar year for the Facility Wide No Yes NA quarterly and by Wide 03735T47-48 preceding three-month period between the due date in April and June;and October 30 of each 2020. calendar year for the preceding three- month period between July and September.All instances of deviations from the requirements of this permit must be clearly identified and the report contain the information specified in 2.2(1))(1)(m)(i)and 2.2(1))(1)(m)(ii). 15A NCAC 02 .0308 a The Permittee shall have an ongoing Facility 2.2(13)(1)(n) duty to disclose to NC DAQ,the Records Facility Wide information detailed in 2.2(D)(1)(n)(i) No Yes NA maintained Wide 03735T47-48 and 2.2(D)(1)(n)(ii). onsite. 15A NCAC 02 .0308 a Air Quality Permit No.03735T47 and 48 Page 80 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) Permit Shield for Non-applicable Requirements The NSPS for Small Industrial- Commercial-Institutional Steam Natural Generating units(40 CFR Part 60, Gas/No.2 fuel 2.3(A)(1) Subpart Dc)and 15A NCAC 02D A rental boiler was oil-fired PS-Temp .0524 are not applicable to the natural NA NA NA NA not on-site in 2020. temporary 03735T47-48 gas/No.2 fuel oil-fired temporary boiler boiler because the boiler is a temporary boiler,as defined in§60.41 c,provided the criteria specified in 2.3(A)(1)(a) through 2.3(A)(1)(d)are met. 15A NCAC 02 .0512 a 1 B Permit Shield for Non-applicable Requirements The National Emission Standards for Hazardous Air Pollutants for Major Sources:Industrial,Commercial,and Natural Institutional Boilers and Process Gas/No.2 fuel 2.3(A)(2) Heaters(40 CFR Part 63,Subpart A rental boiler was oil-fired PS-Temp DDDDD)and 15A NCAC 02D.1111 NA NA NA NA not on-site in 2020. temporary 03735T47-48 are not applicable to the natural boiler gas/No.2 fuel oil-fired temporary boiler because the boiler is a temporary boiler,as defined in§63.7575, provided the criteria in Section 2.3(A)(1)through(A)(4)are met. 15A NCAC 02 .0512 a 1 B Air Quality Permit No. 03735T47 and 48 Page 81 of 81 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2020 Terms and Conditions Was Emission Source or Records Deviation a Method(s)of Control Permit and Deviation? Maintained? Non- Determining Source Condition Comments Device ID Condition (Yes/No) (Yes/No/ Compliance Compliance Description No.(s) Number Summary NA) Issue? Status (Yes/No) The Permittee shall maintain the records specified in 2.3(A)(3)(a) through 2.3(A)(3)(d)documenting that Natural the natural gas/No.2 fuel oil-fired Gas/No.2 fuel 2.3(A)(3) temporary boiler meets the criteria for A rental boiler was oil-fired PS-Temp a temporary boiler. These records NA NA NA NA not on-site in 2020. temporary 03735T47-48 shall be maintained in a logbook boiler (written or electronic format)on-site and made available to an authorized representative upon request. 15A NCAC 02 .0512 a 1 B Natural The Permittee shall submit a startup Gas/No.2 fuel 2.3(A)(4) notification to the Fayetteville A rental boiler was oil-fired PS-Temp Regional Office within 15 days of NA NA NA NA not on-site in 2020. temporary 03735T47-48 startup of the temporary boiler. boiler 15A NCAC 02 .0512 a 1 B