Loading...
HomeMy WebLinkAboutAQ_F_1400226_20190117_CMPL_InspRpt (4) 1yCJo'?°e i, ! ;is NORTH CAROLINA DIVISION OF Asheville Regional Office AIR QUALITY Caldwell Cabinets of NC,LLC NC Facility ID 1400226 Inspection Report County/FIPS: Caldwell/027 Date: 01/23/2019 Facility Data Permit Data Caldwell Cabinets of NC,LLC Permit 10413/R00 3441 Hickory Blvd. SW Issued 12/9/2014 Hudson,NC 28638 Expires 11/30/2022 Lat: 35d49.8832m Long: 8ld27.3999m Class/Status Small SIC: 2434/Wood Kitchen Cabinets Permit Status Active NAICS: 33711 /Wood Kitchen Cabinet and Countertop Manufacturing Current Permit Application(s)None Contact Data Program Applicability Facility Contact Authorized Contact Technical Contact SIP John Bostian Amy Moore John Bostian Operations Manager Member Officer Operations Manager (828)495-8052 (828)495-8052 (828)495-8052 Compliance Data Comments: Inspection Date 01/17/2019 Inspector's Name Richard Morris Inspector's Signature: Operating Status Operating Compliance Code Compliance-inspection Action Code FCE Date of Signature: -a O/ rj' On-Site Inspection Result Compliance Total Actual emissions in TONS/YEAR: TSP S02 NOX VOC CO PM10 *HAP No emissions inventory on record.The emissions inventory is due 09/01/2022. *Highest HAP Emitted inpounds) Five Year Violation History:None Date Letter Type Rule Violated Violation Resolution Date Performed Stack Tests since last FCE:None Date Test Results Test Method(s) Source(s)Tested Inspection Report: 1) Location: Caldwell Cabinets of NC, LLC is located at 3441 Hickory Blvd. SW in Hudson,NC. Caldwell County. Directions: From ARO, take I-40 east Jamestown Road exit 100. Follow Jamestown Rd.to Hwy 70 East. Follow to hwy 18/64. Follow 18/64 to Lenoir. In Lenoir turn right onto Southwest Blvd and go to end that joins into 321 south. Follow to Hudson and go past Mission Road red light and look on right for 3441 address. 2) Facility Overview: Caldwell Cabinets of NC is a woodworking facility that produces cabinets for industry. This facility is permitted under Air Permit No. 10413R00, effective from December 9, 2014, until November 30, 2022. Last compliance inspection was performed by Richard Morris on November 2, 2017. Safety: safety shoes and glasses Current throughputs: 2019 Employees: 19 Hours of operation: 40-48 hrs/wk, 52 wks/yr Pre-inspection Conference: On November 2, 2017, Richard Morris met with Carrie Jenkins, HR. Compliance contact, John Bostian, Operations Manager was out of the office. Based on my conversation with her, we discussed the following: a) Verified the contacts based on FACFINDER printout. Cindy Arney has just been hired as new plant manager. b) I examined the bagfilter logbook and found inspections and maintenance are performed every two weeks. Good documentation. Last entry dated 01/16/2019. c) Ms. Jenkins supplied me with the paint usage for the year 2018. RPM is their paint supplier. VOC emissions were 2.6 tons and particulates were 0.01 tons. I advised that they were eligible for permit rescission and could apply anytime. Process Description: Various tools including a cnc, table saws, and sanders are used to manufacture custom cabinets. Inspection: a) The facility was operating on the day of inspection. All woodworking equipment are connected to the dust collection system and appeared to all be new. I observed the bagfilter while operating and found that it is currently venting to the inside of the building. b) Dry filter paint booth was in operation with no visible emission observed. The filters were very close to needing to be change. I advised they implement method to determine when filter change is needed. 3) Emission Source and Regulatory Review: Permitted Sources are: Emission Emission Source Control Control System .i Source ID j� Description System ID Description ES-1 woodworking and dust collection Sys tem CD-1 lone bagfilter ^A1,607 square feet of filter area) Insignificant Sources: None Stipulation Review: A.2 Permit Renewal. Emission inventory and permit required 90 days prior to permit expiration. A.3 Particulate Control Requirement. The Permittee shall not discharge 4 particulate matter caused by the working, sanding, or finishing of wood without providing, as a minimum for its collection, adequate duct work and properly designed collectors. In compliance. All woodworking equipment was connected to dust control system. A.4 Visible Emissions. In Compliance. No emissions observed. A.6 Fugitive Dust Control. In compliance. The only source for fugitive dust is the parking lot which is small, and gravel covered. j A.7 Fabric Filter Requirements. In compliance. I explained these requirements for logbook and record keeping for maintenance and repair. A logbook was started that day. Last inspection dated 01/16/2019 (annual). A.8 Control of Odorous Emissions. In compliance. I did not detect any odors before entering the facility property. Reporting requirements: There are no reporting requirements in this permit. 4) Compliance History Review: There have been no violations at this facility since permit issuance in December 2014. 5) Stack Test Review: There is no stack test requirement. 6) 112R Status: Based on the facility's inventory, it was decided that they are not subject to 112R reporting requirements 7) Comments and Compliance Statement: Based on review of records and visual observations, this facility appeared to be operating in compliance with the Air Quality standards and regulations at the time of this inspection. /rem