Loading...
HomeMy WebLinkAboutAQ_F_0400052_20190131_CMPL_Ext-Rqst 4� r " ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary MICHAEL ABRACZINSKAS Director January 31,2019 Mr. Tyler Fitzgerald, District Manager Anson County Waste Management Facility 375 Dozer Drive Polkton,North Carolina 28135 Subject: Approval of Extension Request for Tier 2 NMOC Sampling and Report Submittal Anson County Waste Management Facility Polkton, Anson County,North Carolina Facility ID No. 0400052, Air Permit No. 09835T03 Dear Mr. Fitzgerald: The Division of Air Quality (DAQ) has reviewed Anson County Waste Management Facility's request for an extension to the Tier 2 nonmethane organic compounds (NMOC) sampling and report submittal deadlines as defined by 40 CFR 60, Subpart XXX and Air Permit No. 09835T03. The request was submitted to DAQ in a letter dated January 25, 2019, and in a follow-up letter dated January 29, 2019, both from Juene Franklin of Franklin Engineers and Consultants, LLC on behalf of the Anson County Waste Management Facility. Your company is claiming multiple force majeure events, including Hurricanes Florence and Michael in the fall of 2018,repeatedly delayed the landfill gas collection and control system expansion project. Additionally,when the required Tier 2 NMOC sampling was conducted on December 27, 2018, one of the two collected samples did not pass the required quality assurance checks. Therefore, your company has arranged for additional Tier 2 sampling on January 31, 2019, but needs more time to submit the final sampling results. Pursuant to 40 CFR 60.8,the DAQ has the authority to evaluate force majeure claims and, if warranted, grant an extension to the Tier 2 NMOC sampling and report submittal deadlines. The DAQ has evaluated your force majeure claims and agrees that the delays in completing the Tier 2 sampling at the Anson County Waste Management Facility were caused, at least in part, by circumstances beyond the control of the affected facility and its affiliates. Therefore, the DAQ is granting your request to extend the deadline to February 28, 2019,to complete the Tier 2 NMOC sampling and submit the required NMOC emission rate report. The granting of this extension to the specific compliance testing and reporting deadlines does not relieve your company of the legal responsibility for compliance with any other applicable provisions of your Title V permit or with any other applicable Federal, State, or local requirements. e_��D_E s-1 North Carolina Department of Environmental Quality I Division of Air Quality 217 West Jones Street 1 1641 Mail Service Center I Raleigh,North Carolina 27699-1641 919.707.8400 Anson County Waste Management Facility January 31, 2019 Page 2 of 2 If you have any questions,please contact Gary Saunders, Stationary Source Compliance Branch Supervisor, or me at 919-707-8400. Sincerely, Stephen G. Hall Section Chief, Technical Services Division of Air Quality,NC DEQ cc: Juene Franklin, Franklin Engineers and Consultants, LLC (via email) Heather Carter, Regional Air Quality Supervisor (FRO) Central Files (Anson County) North Carolina Department of Environmental Quality I Division of Air Quality 217 West Jones Street 11641 Mail Service Center I Raleigh,North Carolina 27699-1641 919.707.8400