Loading...
HomeMy WebLinkAboutAQ_F_1900015_20181113_ST_RvwLtr µ.w STATE y".t 'IVY h 7 ROY COOPER NORTH CAROLINA Covernor Environmental Quality MICHAEL S.REGAN Secretary MICHAEL ABRACZINSKAS Director November 13, 2018 Mr. Henry Scheller, Plant Manager Arauco Panels USA, LLC 985 Corinth Road Moncure,NC 27559 Subject: Arauco Panels Moncure, Chatham County,North Carolina Total Hazardous Air Pollutants (HAPs) Emissions Testing Source Tested: Particleboard Press DEF-2010 Facility ID: 1900015; Current Air Permit No. 03449T49 Test Conducted July 24, 2018; Tracking No. 2018-248ST Dear Mr. Scheller: The results of the subject testing have been reviewed by the Division of Air Quality's Stationary Source Compliance Branch. Upon review, the test procedures and results are considered acceptable and demonstrate compliance with the applicable regulations. Particleboard press DEF—2010 is subject to 15A NCAC 2D .0530 Prevention of Significant Deterioration and 40 CFR 63 Subpart DDDD NESHAPS: Plywood and Composite Wood Products. The test results at the time of the testing indicate compliance to the emissions limits established by these regulations. The emissions limit for HAPs is 0.30 lb/MSF. The emissions result during the testing was 0.196 lb/MSF and the production rate during testing averaged 30.96 MSF. Prior to the July 2018 testing, your facility had conducted Total HAPs emission testing of the Particleboard Press(DEF-2010)on June 12, 2018. The test results did not demonstrate compliance with the Total HAPs emission limit of 40 CFR 63 Subpart DDDD. However, the Subpart 4D conditions of your facility's air permit allows the Permittee to conduct the initial performance tests within 180 days after the issuance of permit no. T49. The July 2018 testing was performed within the 180-day timeframe. During a September 28, 2018 conference call between your staff and RRO staff, staff personnel expressed a need to optimize the resin formulation used in production. If further retesting of DEF-2010 is conducted by Arauco,then the SOC 2015-02 will remain open no later than September 30, 2020. However, if your facility determines that no further testing is needed, the production rate of 30.96 MSF will be established as the minimum and the process of closing SOC 2015-02 can be initiated. �D,EQ _` NOR7H r.Arurw Oepnrlmenl of EmlmnmCnWllluallly North Carolina Department of Environmental Quality I Division of Air Quality Raleigh Regional Office 1 3800 Barrett Drive I Raleigh.North Carolina 27609 919,791.4200 T 1 919.881.2261 F n Arauca Panels—TJSA, LLC November 13, 2018 Page 2 Please see the attached memorandum dated September 24, 2018 for more details of the test review including a contact number for the test reviewer. If you have any questions for the Raleigh Regional Office, please feel free to contact Dawn Reddix, Environmental Engineer, or me at 919-791-4200. Sincerely, t J W r� William T. Wike, Jr.,P.E. Compliance Supervisor Division of Air Quality, Raleigh Regional Office Attachment cc: RRO Files