HomeMy WebLinkAboutAQ_F_0800018_20181002_ST_RvwMemo DIVISION OF AIR QUALITY
October 2, 2018
MEMORANDUM
To: Heather Carter,Fayetteville Regional Office
From: Shannon Vogel, Stationary Source Compliance Branch
Subject: Rose Brothers Paving Co. Inc. -Riley Paving,Inc.—Windsor
Lewiston Woodville,Bertie County,North Carolina
Facility ID 0800018,Air Quality Permit No. 03707R18
Total Particulate Matter Emissions Testing of Asphalt Plant ES-1
Performed by Grace Consulting,Inc. on May 3,2018
Tracking No. 2018-127st
Grace Consulting performed total particulate matter(PM)emissions testing of asphalt plant ES-1. The
test results are acceptable and demonstrate compliance with the applicable emissions standard.
Emissions Source ES-1 is a No. 2 and No.4 fuel oil/No. 2 and No. 4 equivalent waste fuel oil-fired batch
asphalt plant,which is allowed to utilize recycled,post-consumer waste,asphalt(asbestos-free) shingles
as an option in the mix. Emissions from ES-1 are controlled by simple cyclone 24768 and bagfilter
Ra-15-60. The maximum production capacity is 250 tons per hour(tph).
15A NCAC 2D .0506 Particulates From Hot Mix Asphalt Plants applies and limits total PM based on
actual production rate. Grace Consulting performed EPA Method 5/202 for total PM. The average
process rate during testing was 237.6 tons per hour. The 2D .0506 total PM emission limit is 54.2 pounds
per hour(lb/hr).
Pollutant Test Results Limits Standards Compliance
Filterable PM 2.40 lb/hr --- ---
Condensible PM 1.221b/hr --- --- ---
Total PM 3.62 lb/hr 54.21b/hr 2D .0506 Yes
Compliance was demonstrated. If you have any questions regarding the results of this review,please
contact me at 919-707-8416 or shannon.vogel(ui=denngov.
cc: Central Files,Bertie County
IBEAM Documents-0800018
DIVISION OF AIR QUALITY
October 2, 2018
MEMORANDUM
To: Heather Carter,Fayetteville Regional Office
From: Shannon Vogel, Stationary Source Compliance Branch
Subject: Rose Brothers Paving Co. Inc. -Riley Paving,Inc.—Windsor
Lewiston Woodville,Bertie County,North Carolina
Facility ID 0800018,Air Quality Permit No. 03707R18
Total Particulate Matter Emissions Testing of Asphalt Plant ES-1
Performed by Grace Consulting,Inc. on May 3,2018
Tracking No. 2018-127st
Grace Consulting performed total particulate matter(PM)emissions testing of asphalt plant ES-1. The
test results are acceptable and demonstrate compliance with the applicable emissions standard.
Emissions Source ES-1 is a No. 2 and No.4 fuel oil/No. 2 and No. 4 equivalent waste fuel oil-fired batch
asphalt plant,which is allowed to utilize recycled,post-consumer waste,asphalt(asbestos-free) shingles
as an option in the mix. Emissions from ES-1 are controlled by simple cyclone 24768 and bagfilter
Ra-15-60. The maximum production capacity is 250 tons per hour(tph).
15A NCAC 2D .0506 Particulates From Hot Mix Asphalt Plants applies and limits total PM based on
actual production rate. Grace Consulting performed EPA Method 5/202 for total PM. The average
process rate during testing was 237.6 tons per hour. The 2D .0506 total PM emission limit is 54.2 pounds
per hour(lb/hr).
Pollutant Test Results Limits Standards Compliance
Filterable PM 2.40 lb/hr --- ---
Condensible PM 1.221b/hr --- --- ---
Total PM 3.62 lb/hr 54.21b/hr 2D .0506 Yes
Compliance was demonstrated. If you have any questions regarding the results of this review,please
contact me at 919-707-8416 or shannon.vogel(ui=denngov.
cc: Central Files,Bertie County
IBEAM Documents-0800018