Loading...
HomeMy WebLinkAboutAQ_F_0100237_20191104_CEM_RptRvwLtr (4) It ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary MICHAEL ABRACZINSKAS November 4, 2019 Director Mr. Mark Blalock General Manager Canfor Southern Pine—Graham Plant 4408 Mt. Hermon-Rock Creek Road Graham,North Carolina 27253 SUBJECT: Review of COMS Certification Reports for Boiler 2 and Boiler 3 Canfor Southern Pine—Graham Plant Graham,Alamance County,North Carolina Facility ID No. 0100237 Air Permit No. 06740T22 Dear Mr. Blalock: The Division of Air Quality(DAQ)has reviewed the subject certification test report, which was submitted upon request by Kristie Hill of your staff on October 25, 2019, for the following continuous opacity monitoring systems (COMS) installed on Boiler 2 (ID No. B-2) and Boiler 3 (ID No. B-3): Source Manuacturer/Model Serial No Parameter Test Date B-2 Teledyne LightHawk/ 560ES 5603171 Opacity 5/16/2019 B-3 Teledyne LightHawk/ 560ES 5603172 Opacity 5/16/2019 1. The COMS were installed pursuant to 40 CFR, Subpart 63, DDDDD—National Emission Standards for Hazardous Air Pollutants for Major Sources:Industrial, Commercial, and Institutional Boilers and Process Heaters (commonly known as the Boiler MACT) and Air Permit No. 06740T22, Specific Condition 2.2.C.La. The COMS will be used to demonstrate ongoing compliance with the 10% opacity operating limit(6-minute period, daily block average) as indicated in Table 4 of the Boiler MACT. 2. The COMS certification reports included the manufacturer design specification tests as well as field audit specification tests pursuant to 40 CFR 60,Appendix B, Performance Specification 1 (PS-1). We have reviewed and accept the manufacturer's design tests. The Nonni CAnou d6Mmenwpl Wulp� North Carolina Department of Environmental Quality I Division of Air Quality 217 West Jones Street 1 1641 Mail Service Center I Raleigh,North Carolina 27699-1641 919,707.8400 Mr. Mark Blalock November 4, 2019 Page 2 field audit specification tests were performed by Teledyne Monitor Labs, Inc. and included: optical alignment assessments, calibration error tests, averaging period tests and system response time tests conducted April 16-17, 2019; and 168-hour calibration drift tests conducted May 9-16, 2019. 3. Since the manufacturer design specification tests and field audit test results met the requirements of PS-1, the COMS operating on B-2 Stack and B-3 Stack are both certified effective, May 16, 2019. 4. Consistent with Specific Condition 2. 2.C.1.a(2D .1111; 40 CFR 63.7550), your facility must submit an excess emissions and continuous monitoring system performance report and/or a summary report. The semiannual report shall be calculated on a quarterly basis and contain the information required per 40 CFR 63.10(e)(3)(iv). DAQ considers sources whose percent excess emissions (%EE) and percent monitor downtime(%MD)that are less than 6% for any single calendar quarter and less than 3% for two consecutive quarters to have operated with proper operation and maintenance. If you should have any questions,please contact me at 919-707-8410 or alan.drake@ncdenr.gov. Sincerely, 1 Alan Drake, Environment Engineer Division of Air Quality,NCDEQ c: Kristie Hill, Canfor Southern Pine(e-copy) Lisa Edwards, DAQ WSRO Gary Saunders, DAQ RCO IBEAM Documents, 0100237 Central File, Alamance County