HomeMy WebLinkAboutAQ_F_2000121_20190801_CMPL_InspRpt (4) 200017 l - Ali
NORTH CAROLINA DIVISION OF Asheville Regional Office
AIR QUALITY Harrison Construction Division of APAC-Atlantic
Inc.
Inspection Report NC Facility ID 2000121
Date: 08/05/2019 County/FIPS: Cherokee/039
Facility Data Permit Data
Harrison Construction Division of APAC-Atlantic Inc. Permit 08786/R08
235 Marres Top Road Issued 9/14/2018
Murphy,NC 28906 Expires 5/31/2022
Lat: 35d 0.0000m Long: 84d 13.0020m Class/Status Small
SIC: 1423 /Crushed And Broken Granite Permit Status Active
NAICS: 212313 /Crushed and Broken Granite Mining and Quarrying Current Permit Application(s)None
Contact Data Program Applicability
Facility Contact Authorized Contact Technical Contact SIP
Don Mason Don Mason Don Mason NSPS: Subpart 000
Environmental Environmental Environmental
Compliance/Quality Compliance/Quality Compliance/Quality
Control Control Control
(828)421-0448 (828)421-0448 (828)421-0448
Compliance Data
Comments:
Inspection Date 08/01/2019
Inspector's Name Steven Easley
Inspector's Signature` ^ Operating Status Operating
fv�l;`',, Compliance Code Compliance-inspection
/ Action Code FCE
Date of Signature: / t On-Site Inspection Result Deficiency
W
Total Actual emissions in TONS/YEAR:
TSP SO2 NOX VOC CO PMIO *HAP
2013 1.76 --- --- --- 0.6200 ---
2008 4.43 --- --- --- --- 2.11 ---
Highest HAP Emitted(inpounds)
Five Year Violation History:None
Date Letter Type Rule Violated Violation Resolution Date
Performed Stack Tests since last FCE: None
Date Test Results Test Method(s) Source(s)Tested
1) Location: Harrison Construction Division of APAC-Atlantic Inc is located at 235 Marres
Top Road in Murphy,NC. Cherokee County.
Directions: Travel on Hwy. 64 about 12 miles west of Murphy. About 4 miles past
Ranger Elementary School,turn left off of Hwy. 64, across the median, across the east
bound lanes, and on to Marres Top Road. Marres Top Road is not well marked from the
west bound side of Hwy. 64. Go about 1/2 mile on Marres Top Road, facility is on the
left. Safety equipment required: Safety glasses, hard hat and safety shoes.
2) Description: Harrison Construction Division of APAC-Atlantic Inc is a quarry that produces
crushed stone, gravel, and sand for the construction industry. This facility is permitted under
Air Permit No. 08786R08.
Permitted Sources:
Emission Emission Source Control Control System
Source ID Description System ID Description
one rock crushing operation,650 tons per hour maximum capacity,including grizzly by-pass,with water
suppression and no other control devices,consisting of:
—. .-_....__.__.. .. .......- - _._...... _.._...._.._
ES Crush 1quarry crushing operations N/A - N/A
ES Screen quarry screening operations N/A N/A
ES-Convey quarry conveying operations N/A N/A
3) Inspection:
On August 1, 2019, I traveled to the facility to conduct an annual compliance inspection.
The facility was not in operation at the time of my visit and the only employee present
was"Paul', the scale operator at the asphalt plant. Paul explained that the quarry had
not run this year, however a portable crusher had been operating at the site as recently as
two weeks ago. He said the equipment was in the process of being moved to another
facility, however a screen and belt were still present on site (see attachment). I asked for
him to provide a copy of the air permit and the equipment list, but he could not locate
either. I spoke with Don Mason on the phone and explained that neither document could
be located and he said he would prepare a binder with both for the facility. Later that day
he also emailed me the equipment list dated 2016. The list I received did not include any
of the portable equipment that had been operating at the site recently. This is the same
list I observed during my 2017 inspection.
4) Comments and Compliance Statement:
Due to the unavailability of a permit or updated equipment list, I recommend issuing a
Notice of Deficiency.
5) 5 Year Compliance History:
No violations found for this facility.
HARRISON CONSTRUCTION DIVISION - APAC ATLANTIC, INC. Updated June 30, 2016
CHEROKEE COUNTY QUARRY - PLANT DIAGRAM
01 - Feeder
C502- 3646 Jaw Crusher 550 TPH (NSPS) pi
03- Jaw Belt 42"
04- Belt to Primary screen 36"
05- 5'X14'DD Primary Screenp1 3"
C06a- 52s Standard Cone Crusher 250 TPH (NSPS) �e
07- Belt for Class A Rip Rap 24"
08- Belt to Surge Pile 36" b
09- Belt to ABC Bin 24"
10- 2 X 25 ton Bins 8'x 16'
11 - Belt to ABC Stockpile 30" (NSPS) Dj 17 Ctij c 13
CR15A-52 FC Shorthead Cone Crusher 200 TPH f04j
D501- 41/4 Shorthead Cone Crusher 200 TPH
13 - Belt- Return to Shorthead 24" os C�6$A 113e Sratio«e i
113A- Belt -Surge to High Screen 36" Ib
113B- Belt-Surge to High Screen 36"
14- Belt-Return to Shorthead 24" 09 15 lq Z3
15- Belt-Screenings to Bin 24" 67
16- 6'x 16'TD Screen
17- Belt-return to Primary Screen 2q
18- Belt- Tunnel Belt30"
19- Belt-5 716 7/4 6 7 Radial Stacker to Wash Screen 24" I.I 30
22- Belt-Screenings to Sand Screw 24"
23- Belt-Washed Material 24"
24- Belt-Washed Material 24" \ Z4,
26- Belt-Washed Screenings 24" b SpAb
28- Belt-flat belt under High Screen 24"
29A- 5'x 16"TO Washing Screen 200 TPH
30- Sand Screw 150 TPH
dy-
U I
yf
11
HARRISON CONSTRUCTION COMPANY
APAC-ATLANTIC INC.
CHEROKEE CO. QUARRY
UPDATED June 30, 2016
EPUIPMENT EQUIPMENT MFG COMMENTS
ID NO. DESCRH`TION DATE STATUS TINC
CRUSHERS
36"X46"Jaw Crusher --T-89 YES 6-9-20U9 Water Spray
C06A 52S Standard Cone - YES Water Spray
CR15A** 52fc Shorthead Cone - YES7-9007 Water Spray
D501 4 1/4'Shorthead Cone PKE79= NO Water Spray
SCREENS
05 x Screen - a er pray
16 6'x 16'TD Screen - NO Water Spray
29A* 6'x 16'TD Screen - YES - - Wet Process
CONVEYORS
03 42"Jaw Belt re Water Spray
04 36"Belt to V Screen Water Spray
07 24"Class A Belt re No a er pray
08 36"Surge Stone Belt Pre 71 NO a er pray
09 24"ABC Bin Belt 11-77 NO a er pray
11 30"ABC Stockpile Belt 1-99 YES 8-18-2000 a er pray
13 24"Shorthead Return Belt 10-79 NO a er pray
14 24"Shorthead Return Belt 8-78 NO Water Spray
15 24"Screenings to Bin Belt Pre 71 NO Water Spray
17 24"Return to Primary belt Pre 71 NO a er pray
18 30"Tunnel Belt Pre 71 NO a er pray
19 24"57/67 Stacker Belt 1-99 YES 8-18-2000 a er pray
22 24"Scmgs to Screw Belt New 1-00 YES 9-28-2001 a er Spray
23 24"Washed Stone Stacker New 1-00 YES N/A e rocess
24 24"Washed Stone Stacker New 1-00 YES N/A wet Process
26 24"Sand Stacker Belt New 1-00 YES N/A a rocess
28 24"Flat Belt New I-00 YES 9-28-2001 a er pray
113a 36"Surge to High Screen New 12-07. YES 7-1-2009 a er pray
113b 36"Surge to High Screen New 12-07 YES 7-1-2009 a er pray
MISC.
01 Feeder Pre 71 NO a er pray
30 Sand Screw New 1-00 N/A N/A e rocess
10 2X25 Ton Bins Pre 71 N/A N/A
• Like-For-Like New 5 X 16 Triple Deck Wash Screen 6-20-2016
** Like-For-Like CR15A originally in Waynesville VE Tested 7/2007
f
b
t � I
r
f
uY
2`
C Y.
A�
k
f
r
i
rj
W
a
•i4 I Pft'�dl '+V'+
q{ �
x{
� e I