Loading...
HomeMy WebLinkAboutAQ_F_0400056_20190802_ST_RvwLtr ROY COOPER 6 � Governor MICHAEL S. REGAN Secretary - �' MICHAEL A.ABRACZINSKAS NORTH CAROLINA Director Environmental Quality 2 August 2019 Adam Long Director Gas Pipeline Operations 4720 Piedmont Row Drive PNG 08B Charlotte, NC 28210 SUBJECT: Central Office Review of Source Test Results: Four-Stroke Lean-Burn Natural Gas-Fired Emergency Generator, Source ID No. EG01 Piedmont Natural Gas - Wadesboro Compressor Station,Air Permit No. 10097T02 Wadesboro,North Carolina, Anson County 06/0400056 Fee Class: Title V Dear Mr. Long: The Division has reviewed your source test report that was received by our Central Office on 1 July 2019. There was one report from the 40 CFR Part 63 Subpart ZZZZ and NSPS Subpart JJJJ (CO,NOx, and VOC) source testing of four-stroke lean-burn natural gas-fired emergency generator (ES ID No. EG01), which was conducted on 8 May 2019. On 15 July 2019, this Division determined that the subject testing performed at your facility was an acceptable source test. The review determined that compliance with the applicable emission standard is indicated for this source. A copy of the determination memorandum, issued by Mr. Brent Hall, of the N.C. Division of Air Quality, Stationary Source Compliance Branch, is attached. Should you have any questions regarding this matter, please contact Mr. Jeffrey Cole, Environmental Engineer, or myself, at(910) 433-3300, in the Fayetteville Regional Office. Sincerely, Heather S. Carter Regional Air Quality Supervisor NCDEQ, Division of Air Quality HSC\jdc Attachment: DAQ RCO review(1), dated 15 July 2019 [2019-093ST] cc::] FRO Files(with attachment) North Carolina Department of Environmental Quality I Division of Air Quality Fayetteville Regional Office 1 225 Green Street,Suite 7141 Fayetteville,North Carolina 28301-5094 e oanicua,vgD'E 910.433.3300 T 1910,485.7467 F uepueTMmmrmvamaiuimux\ DIVISION OF AIR QUALITY RECEIVED July 15,2019 JUL 22 2019 MEMORANDUM DEQ*FAYET7EVILLE REOIDNA6 OFFICE To: Heather Carter,Fayetteville Regional Office Supervisor From: Brent W.Hall, Stationary Source Compliance Branch(SSCB Subject: Piedmont Natural Gas Company—Wadesboro Compressor Station Wadesbom,Anson County,North Carolina Facility ID 0400056,Air Permit No. 10097T0I Nitrogen Oxides, Carbon Monoxide, and Volatile Organic Compounds Emissions Testing of Natural Gas-Fired Spark Ignition(SI)Emergency Generator EGO By Mostardi Platt,May 8,2019 DAQ Tracking No. 2019-093ST Mostardi Platt performed EPA Method 320 for nitrogen oxides (NO.), carbon monoxide(CO), and volatile organic compounds(VOC)emissions from emergency generator EGO1. The emissions test results demonstrate compliance with the applicable regulations. EGO is a four-stroke lean burn natural gas-fired emergency generator rated at a maximum 880 horsepower(hp) or 600 kW. 40 CFR 60 Subpart JJJJ Standards of Performance for Stationary Spark Ignition Internal Combustion Engines and 40 CFR 63 Subpart ZZZZ National Emission Standards for Hazardous Air Pollutants for Reciprocating Internal Combustion Engines(RICE) applies. 60 Subpart JJJJ establishes NO., CO,and VOC limits in parts per million by volume dry corrected to 15%oxygen (ppmvd@l5%02). Table 1 from 60 Subpart JJJJ specifies the limits for emergency engines>130 hp. The emissions test results and limits are shown in the following table. Pollutant Test Result Emission Limit Regulation Com liance NO,: 145.4 mvd 15%02 160 mvd 15%Oz 60 Subpart CO 163.1 mvd 15%02 540 mvd 15%02 ME Yes VOC as CsHB 10.1 mvd 15%02 86 mvd 15%M VOC is non-methane organic compounds The generator is rated at 600 kW maximum. During testing the generator averaged 572 kW, or 95%of maximum. The test results demonstrate compliance with the applicable regulations. If there are any questions regarding this review,please contact me at(919)707-8427 or Brent.Hall@ncdem.gov. Cc: Central Files,Anson County IBEAM Documents-0400056