Loading...
HomeMy WebLinkAboutAQ_F_0400056_20190729_ST_ProtRvw (4) CA ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary MICHAEL ABRACZINSKAS Director July 29,2019 Ms. Cynthia Winston Piedmont Natural Gas 410 S.Wilmington Street Raleigh,NC 27601 Subject: REVISED Piedmont Natural Gas-Wadesboro Compressor Station Wadesboro,Anson County,North Carolina Facility ID 04-00056,Air Permit No. 10097TO1 Proposed Waiver for Emissions Testing of One Natural Gas Engine as Representative of Emissions for Engines COMPO I-COMP04 and EGO By Mostardi Platt,Week of August 5,2019,DAQ Tracking No.2019-166ST Dear Ms.Winston: The North Carolina Division of Air Quality(DAQ)has reviewed the additional information submitted in the letter dated July 1,2019 regarding emissions testing of five four-stroke lean-burn(4SLB)natural gas- fired internal combustion engines COMPOI through COMP04 and EGO 1. The waiver is granted as discussed below. The primary purpose of the testing is to satisfy 40 CFR 60 Subpart JJJJ Standards of Performance for Stationary Spark Ignition Internal Combustion Engines requirements for periodic testing once every three years or every 8760 hours,whichever occurs first. The testing is being conducted to meet the three-year testing requirement since the engines have not met the 8760-hour threshold. Piedmont Natural Gas submitted historical emissions data for nitrogen oxides(NOx), carbon monoxide(CO), and volatile organic compounds (VOC),historical loads,and historical run times for all engines. Based on the data submitted,NC DAQ is granting the waiver for emissions testing of one engine as being representative of the four engines COMPOI through COMP04 performance. The selected engine and EGO 1 must be tested according to the conditionally approved protocol dated June 19,2019. This waiver applies to this testing cycle only. However,NC DAQ is reviewing the procedures for processing these types of waiver requests in the future to include conditional approval over multiple years. If NC DAQ establishes procedures for multiple year approvals,we will notify you of those procedures. Until such time,waivers for subsequent testing should be requested and will require selection of a different engine(s) for each testing cycle to ensure that all engines are tested every three years. North Carolina Department of Environmental Quality 1 Division of Air Quality 217 West ones Street 11641 Mail Service Center I Raleigh,North Carolina 27699-1641 919.707.8400 Ms. Cynthia Winston Page 2 DAQ Tracking No. 2019-166ST If there are any questions regarding this review,please contact Brent Hall at(919)707-8427 or Brent.Hall(a)ncdenr. ov. Sincerely, J }a- �_ 4W Stephen G.Hall Tech Services-Section Chief Cc: Heather Carter,FRO Central Files,Anson County IBEAM Documents—0400056